Questions and Answers for ITB.pdf
PDF 120 KB Posted
- Attached to
- 23-294 Wellness Clinic Health Care Services
- Solicitation number
- S-P20004-00005596
- Issued by
- Lane County, Oregon
About this file
This is a Questions and Answers document for ITB-S-10700-00005597, addressing inquiries from prospective contractors regarding a fountain renovation and maintenance project. The project involves work on the Wall of Water and Sprague Fountain, including pump replacements, control panel work, spray nozzle replacement, and painting and sealing services. Contractors are permitted to stage equipment in six designated parking spaces adjacent to the mechanical rooms and may work day and night shifts if operationally necessary without modifying the contract price. The work areas remain open to the public during standard operating hours, with the below-grade parking structure accessible to contractors via key card access after regular business hours. Mandatory pre-bid conferences allow potential bidders to photograph equipment rooms and assess site conditions. The specification does not provide detailed information on painting products, concrete sealer products, or spray nozzle model specifications, requiring contractors to submit bids based on allowances rather than prescriptive requirements.
The project includes three separate allowances totaling $48,000: $20,000 for painting inside the fountains, $20,000 for concrete sealer product at the Sprague Fountain, and $8,000 for spray nozzle replacement. Pump replacements must be "like-for-like" equipment with the same amperage, utilizing existing wiring, conduit, and overcurrent protection devices, with no modifications to panel locations or wiring infrastructure. The government will not accept re-built or refurbished equipment; all replacements must be new. Detailed equipment specifications, control panel documentation, and equipment room photographs are not provided by the contracting agency, though contractors may obtain photographic documentation at the pre-bid conference. Jobsite security and safety remain the contractor's responsibility throughout the project duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-294 Wellness Clinic RFP.pdf | ||
| 23-294 A1 Wellness Clinic RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for ITB-S-10700-00005597
1. I am not finding any information in the specification about any painting occurring within the actual fountains themselves. Can you request additional information be provided in an addendum identifying the specific scope and products they are intending to have used for this painting inside the fountains?
The Contractor will be allowed in their bid price an allowance of $20,000 for painting inside the fountains. Please see Addenda #3 for the new Exhibit 1 – Price Submittal Form.
2. Will Contractors be provided a staging area for a small job trailer in the parking area?
Owner will allow six (6) parking spaces adjacent to the Wall of Water and Sprague Fountain mechanical rooms. Please see Addenda #3 for this information.
3. Are there any known security issues at the site?
The above grade work areas are open to the public seven days a week and all hours during the entire year. The below grade parking structure is open to the public Monday through Friday 6:00AM – 6:00PM. A key card can be used to access the parking structure after hours. As per the contract documents, Jobsite Security and Safety is the responsibility of the Contractor. See Exhibit 6 – DAS General Conditions, Section B.2 – Contractor's Means And Methods; Mitigation Of Impacts, B.2.2, Section F.2 – Projection of Workers, Property, and the Public, F.2.1. Also see Attachment A – Specifications, Section 01 50 00 – Temporary Facilities and Controls, 1.2-C, 1.5, and 1.6.
4. Can you provide additional information regarding the concrete sealer product for use at the Sprague Fountain?
The Contractor will be allowed in their bid price an allowance of $20,000 for concrete sealer product. Please see Addenda #3 for the new Exhibit 1 – Price Submittal Form.
5. Can you provide additional information regarding the spray nozzle replacement (like nozzle model numbers, product data sheets, specifications…)?
The Contractor will be allowed in their bid price an allowance of $8,000 for spray nozzle replacement. Please see Addenda #3 for the new Exhibit 1 – Price Submittal Form.
6. Is it possible to work both day and night shifts? The area is very small so it may be necessary to split shifts to allow subcontractors space to work.
This is acceptable. As long as there is no change in the contract price, the Contractor may work both shifts on both fountains.
7. Are both 480V pumps, like-for-like replacement with same amperage and utilizing the same conduit, wire, and OCPD. Can you please verify this?
Yes, this is correct. Pumps are being replaces with “like-for-like” equipment with existing wiring, panels, and conduit to remain.
8. Is there an equipment list available that shows who is providing pumps, control panels, and all other devices?
Pumps and equipment are shown in Attachment B – Plans, P-001,P-201, and P-
202. Control panels to remain. No list of who is providing pumps or equipment are available.
9. Are Specs sheets available for control panels and who is the panel builder?
No spec sheets are available.
10. Are there any pictures available of each equipment/pump room?
No, there are no photos available of each room, but potential bidders are allowed to take pictures at the mandatory pre-bid conference.
11. Drawings don’t show any power panel locations for 120-,230-, or 480-volt loads.
Can you provide where they all exist?
Locations of panels are not being modified. Wiring and conduit is to remain.
12. Would DAS accept re-built equipment?
No, DAS is not accepting re-built equipment.