Questions and Answers for DE-FOA-0002662 01-26-2022.pdf

PDF 15 KB Posted

Attached to
Silicon Carbide Cladding Development
Opportunity number
DE-FOA-0002662
Issued by

About this file

Questions and Answers 01-26-2022

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for DE-FOA0002662 Date

Question received

Date Answer Posted

Question Answer

1/20/2022 1/26/2022

Question #1

Request your consideration for a 2-to- 4-week extension to the deadline for subject applications.

DOE HQ has granted a 3-week extension for the due date for: the letter of intent, questions, application, and the anticipated Period of Performance. The new application due date is now March 4, 2022. All of the other dates have also been slipped by three weeks.

DOE has reposted the FOA on Grants.gov with the revised dates.

1/21/2022 1/26/2022

Question #2 Can you confirm that the reference to Attachment C in Section IV.C 2.b.1.d) of the proposal should be Attachment 05?

This Attachment C should be Attachment 05. This has been corrected in FOA revision 001

1/21/2022 1/26/2022

Question #3 Should Attachment 05 be provided in addition to the list included on the cover page of the Narrative document?

Yes, this should be in addition to the list included on the cover page of the Narrative document.

1/21/2022 1/26/2022

Question #4 Should Appendix A be changed to Attachment 12 in Section IV.C 2.b.11.D (page 15)?

This Appendix A should be Attachment 12. This has been corrected in FOA revision 001

1/21/2022 1/26/2022

Question #5 Should Attachment 4 be changed to Attachment 12 in Section IV.C.3c (page 16)?

Yes, this should be Attachment 12. This has been corrected in FOA revision 001

1/21/2022 1/26/2022

Question #6 Should Attachment 10 be used for the Abstract/Summary document specified in Section IV.C 2.a (page 11)?

Yes, this is Attachment 10.

1/21/2022 1/26/2022 Question #7 Is an Environmental Checklist required to be submitted by sub-recipients, collaborators, or FFRDCs?

Only one copy of the Environmental Checklist (EC) needs to be part of the application package. The one EC needs to cover all aspects of the project to include all sub-contractor and/or sub-recipient activities.

File details come from the government source that posted it. Updated .