Questions and Answers for DE-FOA-0002662 01-26-2022.pdf
PDF 15 KB Posted
- Attached to
- Silicon Carbide Cladding Development
- Opportunity number
- DE-FOA-0002662
About this file
Questions and Answers 01-26-2022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DE-FOA-0002662 Silicon Carbide FOA Amendment 001.pdf | ||
| DE-FOA-0002662 Silicon Carbide FOA FY22 FINAL.pdf | ||
| All FOA Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for DE-FOA0002662 Date
Question received
Date Answer Posted
Question Answer
1/20/2022 1/26/2022
Question #1
Request your consideration for a 2-to- 4-week extension to the deadline for subject applications.
DOE HQ has granted a 3-week extension for the due date for: the letter of intent, questions, application, and the anticipated Period of Performance. The new application due date is now March 4, 2022. All of the other dates have also been slipped by three weeks.
DOE has reposted the FOA on Grants.gov with the revised dates.
1/21/2022 1/26/2022
Question #2 Can you confirm that the reference to Attachment C in Section IV.C 2.b.1.d) of the proposal should be Attachment 05?
This Attachment C should be Attachment 05. This has been corrected in FOA revision 001
1/21/2022 1/26/2022
Question #3 Should Attachment 05 be provided in addition to the list included on the cover page of the Narrative document?
Yes, this should be in addition to the list included on the cover page of the Narrative document.
1/21/2022 1/26/2022
Question #4 Should Appendix A be changed to Attachment 12 in Section IV.C 2.b.11.D (page 15)?
This Appendix A should be Attachment 12. This has been corrected in FOA revision 001
1/21/2022 1/26/2022
Question #5 Should Attachment 4 be changed to Attachment 12 in Section IV.C.3c (page 16)?
Yes, this should be Attachment 12. This has been corrected in FOA revision 001
1/21/2022 1/26/2022
Question #6 Should Attachment 10 be used for the Abstract/Summary document specified in Section IV.C 2.a (page 11)?
Yes, this is Attachment 10.
1/21/2022 1/26/2022 Question #7 Is an Environmental Checklist required to be submitted by sub-recipients, collaborators, or FFRDCs?
Only one copy of the Environmental Checklist (EC) needs to be part of the application package. The one EC needs to cover all aspects of the project to include all sub-contractor and/or sub-recipient activities.
File details come from the government source that posted it. Updated .