Questions and Answers.pdf

PDF 111 KB Posted

Attached to
FMC Rochester- Install Above Ground Tanks
Solicitation number
15B41227Q00000001
Issued by

About this file

This is a Questions and Answers document for Request for Quotation 15B41226Q00000006 addressing the installation of above-ground storage tanks at FMC Rochester.

The Q&A clarifies key project parameters: the existing underground storage tanks have capacities of 4,000 gallons for gasoline and 2,000 gallons for diesel. Prior to project commencement, less than 1,000 gallons of gasoline will be transferred to a temporary tank for the project duration, and approximately 1,200 gallons of diesel will be pumped out and disposed of. The document confirms that specifications are included in the solicitation, with a site map to be added. Regarding scope responsibilities, concrete and bollards work are detailed on page 3 of the specifications, while electrical work is specified on page 4; there are no separate project drawings. The document indicates that Question 5 appears incomplete with no associated question text provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quotation 15B41226Q00000006 Install Above Ground Tanks – FMC Rochester Questions and Answers

Question 1:

What are the capacities/sizes of the two existing underground storage tanks for gasoline and diesel?

BOP Response: Clarification or Change Gasoline tank is 4000 gallons.

Diesel tank is 2000 gallons.

Question 2:

Approximately how many gallons of gasoline and diesel are currently remaining and expected to be pumped out and removed?

Depending on start date, we will plan on having less than 1000 gallons of gasoline to be transfered to a temp tank for the duration of the project.

Roughly 1200 gallons of diesel will need to be pumped out and disposed of.

Question 3:

Are the concrete and bollards by the cement contractor? Also, what about electrical?

BOP Response: Clarification or Change There are no project drawings. Concrete and Bollards- see page 3 of the specs. Electrical- See page 4 of the specs.

Question 4:

Are there specs and drawings available for the bid process?

BOP Response: Clarification or Change The specs are located in the solicitation. A site map will be added to the solicitation.

Question 5:

File details come from the government source that posted it. Updated .