This is a Question & Answer Report from the City of Pembroke Pines, Florida, Procurement Department regarding Quick Quote No. PSPW-26-QQ-09 for the Club 19 Awning: 4-Inch Insulated Roof System project. The City of Pembroke Pines is seeking a qualified contractor to furnish and install a new covered awning, including demolition, materials, structural components, roofing, finishes, and labor. The estimated project cost is $60,000. The response deadline for questions was October 15, 2026, at 10:00 a.m., with the report compiled on Tuesday, November 10, 2026.
Key project details clarified through the Q&A process include the following: the City will remove the planter and install a concrete ramp; the awning will attach to the existing facia in the seating area and to the location where foam molding currently exists, which the contractor must remove and discard; electrical installation will be performed by the City concurrent with contractor installation of the awning; every other section must provide structural support for ceiling fans; the seating area roof will be higher than the remaining roof sections, with the height difference occurring at or above the existing tie beam; and flashing will be required to properly tie in and waterproof the gap between the two roof sections. No pricing terms, set-asides, incumbency information, or contract term details are specified in this Q&A document.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Pembroke Pines
Procurement Mark Gomes, Assistant City Manager / Director of Procurement &
Sustainability 601 City Center Way, Pembroke Pines, FL 33025
(954) 431-4884
QUESTION & ANSWER REPORT
Quick Quote - Club 19 - Awning: 4-Inch Insulated Roof System
QUESTION & ANSWER REPORT
QQ No. PSPW-26-QQ-09
Club 19 - Awning: 4-Inch Insulated Roof System RESPONSE DEADLINE: October 15, 2026 at 10:00 am
Tuesday, November 10, 2026
Approved,, Unansweredd Questions
Approved,, Answerss Provided
1.. Engineerss budget Oct 2, 2026 8:35 AM
Question: 1. What is the project budget?
Oct 2, 2026 8:35 AM
Answeredd byy Jamiee Chen: Please refer to Section 2.4. Estimated Project Cost: $60,000
Oct 5, 2026 9:31 AM
2.. Noo subject Oct 7, 2026 3:34 PM
Question: Who will remove the planter?
Oct 7, 2026 3:34 PM
Answeredd byy Dannyy Benedit: The City will remove the planter. Concrete ramp will be installed by the city.
Oct 7, 2026 3:35 PM
3.. Noo subject Oct 7, 2026 3:36 PM
QUESTION & ANSWER REPORT
QQ No. PSPW-26-QQ-09 Club 19 - Awning: 4-Inch Insulated Roof System
QQuestion: 1. Where will the awning be attached to? 2. Will there be electrical installation needed? 3.
Will the sections need any special support?
Oct 7, 2026 3:36 PM
Answered by Danny Benedit: 1. The awning will be attached to the facia in the seating area, but the rest will be attached to where the foam is installed now. Contractor to remove and discard the foam molding. 2. Electrical will be done by the City while contractor installs the awning. 3. Yes, every other section must provide support for ceiling fans.
Oct 7, 2026 3:37 PM
4. No subject
Oct 8, 2026 8:51 AM
Question: 1. Will the roof be continuous? 2. Will the sections need any special support?
Oct 8, 2026 8:51 AM
Answered by Danny Benedit: 1. The seating area roof will be higher than the rest. The difference between the two roofs will occur at or above the existing tie beam. The two roofs will need to have a flashing to tie in and waterproof the gap. 2. Yes, every other section must provide support for ceiling fans.
Oct 8, 2026 8:52 AM