Question and Answer One~4.docx

DOCX document 36 KB Posted

Attached to
Install Bollards I-205 SUP Maywood Park
Solicitation number
S-73000-00005423
Issued by
Multnomah County, Oregon

About this file

This document is a question and answer sheet for an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for the installation of bollards along the I-205 Shared Use Path (SUP) in Maywood Park. The procurement opportunity involves bid item "Removable Bollard" which covers the supply and installation of the bollards. The ITB requires stripe removal, allows for square cut holes, and limits access to the pathway to the closest access point. Pedestrian and bicycle use must remain open, with signage and flagging permitted to assist users through the work zones. The ITB closing date is January 26, 2023 at 11:00 am. The project location falls within Multnomah County and several jurisdictions within the city of Portland.

The summary of pricing terms, set asides, and funding information is not provided in the given document. However, the ITB requires the contractor to comply with applicable sections of Specification 00225, and disturbed pavement must be repaired at the contractor's cost.

View the file

Other files

File Type Posted
Invitation to Bid~65.docx DOCX document
Attachment D - Product Information.pdf PDF
Preliminary Bid Tabulation~2.xlsx XLSX spreadsheet
Attachment C - Traffic Guard Specifications.pdf PDF
Attachment A - Plans~17.pdf PDF
Attachment B - Specifications~7.pdf PDF
bidcover~10.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:
January 25, 2023
OREGON DEPARTMENT OF TRANSPORTATION

INVITATION TO BID

Q & A NO. 1

ITB NO.:
S-73000-00005423
CLOSING DATE:
January 26, 2023
TIME:
11:00 am
DESCRIPTION:
Install Bollards I-205 SUP Maywood Park
BUYER:
Ivory Williams
EMAIL:
Ivory.williams@odot.oregon.gov
PHONE:
503-731-8562

1. Does the bollard supply and install get paid under the same bid item?

A. Yes, under bid item “Removable Bollard”

2. What is required for stripe removal for bid item 3 and does it need to be re-striped?

A. Stripe Removal required to comply with applicable sections of 00225. No restriping required.

3. Can the holes in the pathway be cut in a square or do they have to be cut in a circle

A. Supplemental Specifications require Contractor to preserve and protect SUP. Square cut of holes will be allowed at minimum dimensions needed to construct 18” diameter reinforced piers. Disturbed pavement must be repaired at Contractor cost.

4. Is access down the pathway for equipment and trucks allowed for construction?

A. Supplemental Specifications require Contractor to preserve and protect SUP. Access for equipment and trucks for each of the three work sites should be from closest access point.

5. Is flagging or signage required on pathways or can we just close sections or put cones around the working area?

A. Pedestrian and bike use to remain open. Signing/flagging/assisting pedestrians/bicyclists safely through work zones is allowed to meet this open requirement