Question and Answer One~4.docx
DOCX document 36 KB Posted
- Attached to
- Install Bollards I-205 SUP Maywood Park
- Solicitation number
- S-73000-00005423
- Issued by
- Multnomah County, Oregon
About this file
This document is a question and answer sheet for an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for the installation of bollards along the I-205 Shared Use Path (SUP) in Maywood Park. The procurement opportunity involves bid item "Removable Bollard" which covers the supply and installation of the bollards. The ITB requires stripe removal, allows for square cut holes, and limits access to the pathway to the closest access point. Pedestrian and bicycle use must remain open, with signage and flagging permitted to assist users through the work zones. The ITB closing date is January 26, 2023 at 11:00 am. The project location falls within Multnomah County and several jurisdictions within the city of Portland.
The summary of pricing terms, set asides, and funding information is not provided in the given document. However, the ITB requires the contractor to comply with applicable sections of Specification 00225, and disturbed pavement must be repaired at the contractor's cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Invitation to Bid~65.docx | DOCX document | |
| Attachment D - Product Information.pdf | ||
| Preliminary Bid Tabulation~2.xlsx | XLSX spreadsheet | |
| Attachment C - Traffic Guard Specifications.pdf | ||
| Attachment A - Plans~17.pdf | ||
| Attachment B - Specifications~7.pdf | ||
| bidcover~10.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DATE: |
| January 25, 2023 |
| OREGON DEPARTMENT OF TRANSPORTATION |
INVITATION TO BID
Q & A NO. 1
| ITB NO.: |
| S-73000-00005423 |
| CLOSING DATE: |
| January 26, 2023 |
| TIME: |
| 11:00 am |
| DESCRIPTION: |
| Install Bollards I-205 SUP Maywood Park |
| BUYER: |
| Ivory Williams |
| EMAIL: |
| Ivory.williams@odot.oregon.gov |
| PHONE: |
| 503-731-8562 |
1. Does the bollard supply and install get paid under the same bid item?
A. Yes, under bid item “Removable Bollard”
2. What is required for stripe removal for bid item 3 and does it need to be re-striped?
A. Stripe Removal required to comply with applicable sections of 00225. No restriping required.
3. Can the holes in the pathway be cut in a square or do they have to be cut in a circle
A. Supplemental Specifications require Contractor to preserve and protect SUP. Square cut of holes will be allowed at minimum dimensions needed to construct 18” diameter reinforced piers. Disturbed pavement must be repaired at Contractor cost.
4. Is access down the pathway for equipment and trucks allowed for construction?
A. Supplemental Specifications require Contractor to preserve and protect SUP. Access for equipment and trucks for each of the three work sites should be from closest access point.
5. Is flagging or signage required on pathways or can we just close sections or put cones around the working area?
A. Pedestrian and bike use to remain open. Signing/flagging/assisting pedestrians/bicyclists safely through work zones is allowed to meet this open requirement