QUALITY CONTROL REQUIRMENTS.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C24226Q0371
About this file
This is a Quality Control Requirements document that establishes mandatory standards for contractor performance under an elevator inspection and testing services contract for the Department of Veterans Affairs. The contractor must establish and submit a Quality Control Program (QCP) to the Contracting Officer (CO) or Contracting Officer's Representative (COR) within ten days of Notice to Proceed, with the program required to comply with the Maintenance Control Program specified in ASME A17.1 Section 2.
The QCP must include an inspection system covering all contract services, a detailed checklist for scheduled and unscheduled inspections that addresses every operational area and required task, and identification of inspection personnel by name. The contractor is required to maintain a system for identifying and correcting performance deficiencies proactively, before government inspectors identify issues, and must maintain documentation of all inspections and corrective actions available to the CO/COR upon request throughout the contract term. Additionally, the contractor shall conduct an Annual Walk with the COR or government designee to review elevator conditions and service quality, with the COR determining the scope of elevators to be reviewed during this inspection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0371 0004.docx | DOCX document | |
| 36C24226Q0371 0003.docx | DOCX document | |
| 36C24226Q0371 0002.docx | DOCX document | |
| 36C24226Q0371 0001.docx | DOCX document | |
| Wage Determination-SAM.gov.pdf | ||
| 36C24226Q0371_1.docx | DOCX document | |
| 852.219-75 - Copy.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY CONTROL REQUIRMENTS
1. Contractor shall establish a Quality Control Program to assure the requirements of the Contract are provided as specified. The Contractor shall submit this program to the CO/COR, for acceptance within ten (10) days of Notice to Proceed. QCP shall be in compliance with the Maintenance Control Program as required by ASME A17.1 Section
2. The program shall include the following:
· An inspection system covering the services described in the Contract. A checklist used for inspecting Contract performance during scheduled or unscheduled inspections and the name(s) of the individual(s) who will perform the inspection.
· The checklist shall include every area of the Contractor’s operation as well as every task required to be performed.
· A system for identifying and correcting deficiencies before the level of performance becomes unacceptable and/or the Government inspectors point out deficiencies.
· A file of inspections conducted by the Contractor and the corrective action taken. This documentation shall be made available to the CO/COR upon request, at any time during the term of the Contract.
3. The Contractor shall conduct an Annual Walk with the COR or Government designee to review the condition of elevators and quality of services provided in performance of the contract. The COR will determine the number of elevators to review during the annual walk. All elevators can be inspected as well as the required documentation.