Quality Assurance Surveillance Plan 4th SCM.pdf

PDF 181 KB Posted

Attached to
Small Craft Mechanic
Solicitation number
M6786126Q0018
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for monitoring contractor performance in boating operations support services. The QASP establishes the framework for the Contracting Officer's Representative (COR) to evaluate contractor compliance with the Performance Work Statement (PWS) requirements through systematic surveillance methods. Performance standards are defined in the Performance Requirements Summary (PRS) table and are subjective in nature. The contractor is responsible for quality control and management to meet contractual terms, with the COR serving as the Quality Assurance Evaluator (QAE). Acceptable Quality Levels (AQLs) are established in the PRS, and failure to meet these standards permits the Contracting Officer to exercise negative incentives.

The QASP outlines four primary surveillance methods: periodic inspection/planned sampling based on subjective judgment and resource analysis; 100% inspection of every performance unit; random sampling with equal selection probability; and customer surveys and feedback. Documentation requirements include surveillance logs recording deficiencies with dates, times, and contractor acknowledgment. When substandard performance occurs, the COR must document discrepancies and promptly notify the Contracting Officer. The contractor has two working days to provide written responses explaining causes and corrective actions. Performance ratings follow a five-tier scale: Exceptional, Very Good, Good, Marginal, and Unsatisfactory, with arrows indicating performance trends. The COR maintains comprehensive surveillance files including contracts, quality control plans, correspondence, contractor reports, surveillance logs, and deficiency reports. Documentation of unacceptable performance must be submitted to the Contract Administrator within two workdays, referencing specific contract paragraphs, dates, and times of observations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION: DoD COMMUNITY ONLY

1.Quality Assurance Surveillance Plan

1.1 Purpose. This Quality Assurance Surveillance Plan (QASP) has been developed to provide the standard of surveillance for monitoring the contractor’s performance in boating operations support service. The designated COR will serve as the Quality Assurance Evaluator (QAE) and will use this QASP to ensure the contractor is conforming to the Performance Work Statement

(PWS) requirements.

1.2 Performance Standards. The QASP provides a systematic method to evaluate the service the

Contractor is required to furnish. The COR will assess the Contractor’s performance to ensure the Contractor is performing up to the specified standards. The performance standards for this performance work statement are stated in the Performance Requirements Summary (PRS) included in this QASP. The standards are subjective for this requirement.

1.3 Management and Oversight. The QASP is based on the premise that the Contractor and not the Government, is responsible for the management and any Quality Control action required to meet the terms of the contract. The performance requirements recognize that the Contractor is not a perfect manager and that unforeseen requirements and uncontrollable problems do occur.

Good management and use of an adequate Quality Control Plan will allow the Contractor to operate within specific performance requirements. QASPs are designed to be objective, fair, and consistent in evaluating Contractor Performance against the provided standards. The contractor’s quality control plan will be reviewed and approved prior to contract award.

1.4 Acceptable Quality Levels (AQLs). AQLs have been established in the PRS and provide performance standards that the Contractor will meet in performing the contract. In the event the

Contractor does not meet the established AQLs, the Contracting Officer has the right to exercise the negative incentives stated in this QASP.

1.5 Primary Method of Surveillance / Evaluation. The COR will perform the evaluation based on using one of the various methods outlined in the PRS table included in this QASP. The following methods may be incorporated into the PRS to monitor contract performance:

1.5.1 Periodic Inspection / Planned Sampling: Period inspection, or planned sampling, involves the development of a surveillance plan based on subjective judgment and analysis of available agency resources to determine which tasks to inspect and how frequently to inspect them.

1.5.2 100% inspection: Inspection where specific characteristics of every performance unit are examined and tested to determine conformance with requirements.

1.5.3 Random inspection: Sampling method in which each unit of the population has an equal chance of being selected. Customer Surveys and Feedback: A review method where customers and end users are surveyed to provide input on specific service levels.

1.6 Substandard Performance. If any of the performance requirements do not meet the AQL set in the PRS table, the COR shall document the discrepancy(s) and shall notify the Contracting

Officer promptly. The Contracting Officer will then take the appropriate action with the contractor to remedy the substandard performance. When the performance is below the AQL standard, the Government may implement increased surveillance, document poor performance history ratings or begin termination for default procedures.

1.7 Notification. The COR will notify the Contracting Officer, in writing, of unacceptable quality levels. The Contracting Officer will promptly provide written notification of discrepancies as they occur, or immediately if the situation significantly affects the well-being of the project. The

Contractor will be given the opportunity to respond, in writing, to each discrepancy.

1.8 Response. The Contractor shall provide a written response to the cause and the corrective action to prevent recurrence within two (2) working days after receipt of Contracting Officer’s notification. The Contractor shall cite specific quality assurance program procedures or new procedures instituted to prevent recurrence.

1.9 Records. The COR will maintain contract surveillance files as directed by the Contracting

Officer. Surveillance files will include, at a minimum, the following documentation for this contract:

a. A copy of the contract and all contract modifications.

b. QASP, Quality Control Plan, and any other monitoring tools and checklists.

c. All correspondence including Contracting Officer notifications and the Contractor’s response.

d. Contractor reports, i.e., training plans, course outlines, maintenance, and training anomalies.

e. Surveillance reports and a summary of the surveillance logs prepared by the COR and submitted to the Contracting Officer.

f. Copies of deficiency reports that may be submitted in support of unacceptable performance identified during the performance period by the COR, or when there is a significant change in the assessment in one or more evaluation areas.

1.10 Ratings. The following criteria will be used for performance evaluations: Exceptional, Very

Good, Satisfactory, Marginal, or Unsatisfactory. Upward or downward arrows may be used to indicate an improving or worsening trend insufficient to change the assessment status.

a. Exceptional. Indicates performance clearly exceeds contractual requirements. There were no problems requiring corrective action.

b. Very Good. Performance meets contractual requirements and exceeds some to the

Government’s benefit. The contractual performance of the tasks and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

c. Good. Indicates performance clearly meets contractual requirements. The area of valuation contains some minor problems for which the corrective actions appear satisfactory.

d. Marginal. Indicates performance meets contractual requirements. The area of evaluation contains one or more serious problems for which corrective actions have not yet been identified, appear only marginally effective or have not been fully implemented.

e. Unsatisfactory. Indicates the Contractor is in danger of not being able to satisfy contractual requirements and recovery are not likely in a timely manner. The area of evaluation contains one or more serious problems for which the corrective actions appear ineffective.

1.11 Documentation. Documentation used and referenced to perform surveillance will consist of contractor procedures, customer feedback and contract data requirements.

a. Recording Observations. Surveillance Logs will be used to record information on scheduled observations and deficiencies noted. Each observation is recorded on the log.

The documents then become a formal record for reference. The Contractor is to be told each time that a deficiency is found during scheduled observations. The COR makes a notation on the Surveillance Log of the date and the time the deficiency was discovered, then, the COR asks a contractor task leader to initial the notation, documenting notification of the deficiency only.

b. Potential Unacceptable Performance. The COR must identify the specific service that is unacceptable and the possible causes, and ask several questions which, if answered, are intended to pinpoint the source of the problem.

c. Documenting Unacceptable Performance. The COR should make every attempt to resolve the problem with the Contractor. The original log and the attempted solution

(along with an evaluation of results) shall be forwarded to the Contracting Officer through the COR.

Based on the severity of the discrepancy and the success of the solution, the COR will notify the

Contracting Officer. The Contractor shall complete a response to the unacceptable condition if requested by the Contracting Officer.

1.12 Taking Action. The COR shall evaluate the contractor’s performance and document any non-compliance report it to the Contracting Officer to act against the contractor for an unacceptable rating. When the Contractor’s performance is unacceptable and a formal action is indicated, the COR will determine what action is appropriate for the specific circumstances and make a recommendation to the Contracting Officer.

1.13 Documentation. The COR shall retain a copy of all inspection schedules and surveillance activity logs during the course of the contract and shall forward them for inclusion in the contract file at the end of the surveillance period. However, when a specific service becomes unsatisfactory during a surveillance period, the inspection documentation supporting the contract discrepancy report shall be forwarded to the Contracting Officer at the earliest opportunity. When performance does not meet the specifications and requirements of this contract, written (letter, fax, or email) documentation will be furnished explaining how performance is considered unacceptable. This documentation should state what specification(s) is not being performed (reference contract paragraph number(s), date, and time observed) and submit it to the CONTRACT ADMINISTRATOR within two workdays of each occurrence.

File details come from the government source that posted it. Updated .