About this file

The file is a Quad Chart Template for a Special Notice related to the US Army's Counter-Unmanned Aircraft Systems (C-UAS) Soldier Common Systems Demonstration Event. The template provides a structured format for vendors to submit comprehensive information about their proposed C-UAS solutions, divided into four quadrants: System Description, Operational Capability, Technical Approach, and Cost and Production Capability.

The template requires vendors to include critical details such as system photos/diagrams, component listings, physical descriptions, technology readiness levels (TRL), system capabilities, development history, estimated costs, production rates, and contact information. This template is part of a multi-phase evaluation process for the PEO Missiles and Space C-UAS Product Office, with key submission deadlines including DD1494 and RF measurements due by 23 June 2025, and white papers and quad charts due by 8 July 2025. The government aims to select up to 12 vendors for a demonstration event in the first quarter of FY26, focusing on C-sUAS systems that can detect and potentially defeat small unmanned aircraft systems at the individual soldier level.

View the file

Other files

File Type Posted
2025.06.18 Special Notice 25-003a.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• System photo or diagram

• Listing of types, numbers, and sizes of components required for the system

• System physical descriptions

• System status (TRL/MRL)

• Accomplishments to date

• Describe how the system would provide new or enhanced operational capability to the user

• Provide any milestone decision points that will be required

• Technical detail

• List development/ test history of capability

• List system capability/description

• Describe current/future development efforts

• Other information the vendor believes that the U.S.

Government should know

• Estimated Cost

• Production rate and current schedule based upon a 2 year period of production

• Production ramp up opportunities

• Contact information

System Description Operational Capability

Technical Approach Cost and Production Capability

Vendor Name (Vendor logos are acceptable, include intellectual property markings as appropriate)

Vendor may adjust height/width of quads as needed

File details come from the government source that posted it. Updated .