QQ86593 Addendum 1.docx
DOCX document 272 KB Posted
- Solicitation number
- 86593
- Issued by
- Washington County, Virginia
About this file
This is Addendum No. 1 issued by the Commonwealth of Virginia on February 3, 2025, for Quick Quote #86593 regarding Installation and Removal Services. The addendum modifies the original quote dated January 28, 2025, with bids due February 7, 2025, at 11:00 AM. The changes include modifications to the scope of work, specifically updating requirements for the removal of an existing 10K transformer and 60A panel. A new requirement has been added for the provision and installation of a 40A breaker, including the removal of an existing 20A breaker and upsizing conductors as needed.
The addendum adds a new line item to the pricing schedule for the 40A breaker installation. Contract officer Megan Sturgill (276-523-8119) is the point of contact for this modification. Bidders must acknowledge this addendum by signing and returning it prior to the bid due date, in addition to signing the original bid document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 3, 2025
ADDENDUM NO. 1 TO ALL BIDDERS:
| Reference – Quick Quote: | QQ#86593 |
| Commodity: | Installation and Removal Services (Not Otherwise |
| Classified) | |
| Dated: | January 28, 2025 |
| For Delivery To: | Departments, Institutions, |
| Agencies, Commonwealth of Virginia | |
| Bid Due: | February 7, 2025, at 11:00AM |
The above is hereby changed to read:
1. Reference Page 3, Scope of Work: Change to read “B. a. Remove existing 10K Transformer”
2. Reference Page 3, Scope of Work: Change to read “C. a. Remove existing 60A panel”
3. Reference Page 3, Scope of Work: Add “E. Provide and install one new 40A Breaker to include upsizing conductors as needed. a. Remove existing 20A breaker.”
4. Reference Page 20, Pricing Schedule: Add a line item under Labor to read “$_________ (40A Breaker)”
Note: A signed acknowledgment of this addendum must be received at the location indicated on the QQ either prior to the bid due date and hour or attached to your bid. Signature on this addendum does not substitute for your signature on the original bid document. The original bid document must be signed.
Sincerely, Megan Sturgill Contract Officer Phone: 276-523-8119
Name of Firm Signature/Title Date image1.png image3.png image2.png
File details come from the government source that posted it. Updated .