QQ Addendum Westmoreland Bathhouse Floor Refinishing.docx

DOCX document 72 KB Posted

Attached to
Bathhouse Floor Refinishing Westmoreland State Park
Solicitation number
62173
Issued by
Westmoreland County, Virginia

About this file

This document is an addendum to a Quick Quote (QQ-62396) for bathhouse concrete floor refinishing at Westmoreland State Park in Virginia. The addendum clarifies that the flooring system material should extend as close as possible to the shower stalls, with any gap filled with a high-quality silicone sealant. It also changes the previous requirement for a 4.5" Johnsonite rubber cant cove base, indicating that the surface preparation must continue up 4.5" on the block wall instead to achieve proper bonding of the Dur-a-flex Hybriflex EC flooring system or approved equivalent. Bids are due on April 5, 2024, with a prebid conference held on March 26, 2024.

The contract opportunity is for bathhouse floor refinishing at Westmoreland State Park in Westmoreland County, Virginia. The scope of work includes grinding and preparing the existing concrete floor per the coating manufacturer's specifications to achieve the proper bonding profile.

View the file

Other files

File Type Posted
QQ Westmoreland Bathhouse Floor Refinishing Final .docx DOCX document
GENERAL_TERMS_AND_CONDITIONS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QQ-62396 Westmoreland State Park Bath House Floor Refinishing

ADDENDUM # 1

April 2, 2024

ADDENDUM NO. 1 TO ALL BIDDERS:

Reference – Quick Quote:QQ-62173
Commodity:91025, 36060, 90945 – Bathhouse Concrete FloorRefinishing
Dated:March 20, 2024
For Delivery To:Westmoreland State Park
Bid Due:April 5, 2024
Prebid Conference:March 26, 2024

The above is hereby changed to read:

1. Reference Page 2, B. Scope of Work, iv. A 4.5” Johnsonite rubber cant cove base or approved equivalent will be installed to help prevent cracking. Color TBD.: Change to read: Surface preparation must continue up 4.5” on the block wall to achieve proper bonding of the Dur-a-flex Hybriflex EC flooring system or approved equivalent. Flooring system will continue up the block walls 4.5” from the floor.

Question: Should the flooring system material extend to the edge of the concrete floor at the shower stall or to the shower stall itself?

Answer: Flooring system material should extend as close as possible to the shower stalls to still maintain quality, any gap between the flooring system material and the shower stall must be filled with a high-quality silicone sealant closely matching the flooring color.

Note: A signed acknowledgment of this addendum must be received at the location indicated on the IFB either prior to the bid due date and hour or attached to your bid. Signature on this addendum does not substitute for your signature on the original bid document. The original bid document must be signed.

Sincerely, Barbara Little Contract Officer Phone: 804-382-5587

Name of Firm

Signature/Title

Date image1.png

File details come from the government source that posted it. Updated .