QBL Initial and Follow-up Survey.pdf
PDF 324 KB Posted
- Attached to
- CKU-5 Parts
- Solicitation number
- N0017425R1013
About this file
This document is a QBL (Qualified Bidders List) Initial & Follow-Up Qualification Survey form from the Naval Surface Warfare Centers (NSWC). The two-page form is designed to comprehensively assess a manufacturing vendor's qualifications and capabilities for a specific part, with 13 detailed questions covering manufacturing processes, quality management, personnel, equipment, and potential changes that could impact production. The survey allows for both initial qualification and follow-up assessments, with key areas of inquiry including the existence of standard operating procedures (SOPs), manufacturing plans, equipment and personnel qualification lists, inspection reports, management/ownership changes, and compliance with ISO 9001:2018 quality management standards. The form requires the manufacturing vendor to provide a point of contact and allows space for additional information or explanatory notes, with provisions for signatures from the preparer and an NSWC representative to validate the submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0017425R10130002 - Amendment 2.pdf | ||
| N0017425R10130001.pdf | ||
| CDRL A001_Redacted.pdf | ||
| CDRL A003_Redacted.pdf | ||
| CKU 5 - Past Performance Matrix.docx | DOCX document | |
| CKU5 - Contract Administration Plan.docx | DOCX document | |
| Solicitation - N0017425R1013.pdf | ||
| CDRL A002_Redacted.pdf | ||
| CDRL A004_Redacted.pdf | ||
| CKU 5 - Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QBL Submission Form Enclosure 2
QBL Initial & Follow-Up Qualification Survey
DATE OF SURVEY SUBMISSION:
INITIAL QUALIFICATION CHECKLIST
FOLLOW-UP CHECKLIST
CLARIFICATIONS
IMPORTANT - ANSWERING “NO” TO ANY OF THE FOLLOWING QUESTIONS DOES NOT AUTOMATICALLY WARRANT A DISQUALIFICATION. PLEASE ATTACH OR INCLUDE ANY SUPPORTING DOCUMENTATION ALONG WITH SUBMISSION OF THIS SURVEY.
MANUFACTURING VENDOR DESIGNATED POINT OF CONTACT: Please include name, email address and telephone number of the POC
QBL INFORMATION REQUEST TABLE for
PART NAME:
PART NUMBER: REVISION:
Questions (For Follow-Up Qualification, please skip to question #6.)
YES NO
1. Is an SOP, manufacturing plan or process plan in place? (If answered “NO”, please skip to question #3)
2. Does the SOP, manufacturing plan or production plan include shop travelers/route cards?
3. Do you have a list of the equipment and personnel qualified for manufacture of the QBL part(s)? (If answered “YES”, please skip to question #5.)
4. Is there an established in-process and final inspection report available?
5. Current equipment and personnel in mind, would the absence of qualified personnel or equipment greatly affect the production of the QBL part?
6. Has there been a change in management or ownership since the last QBL deliverable?
7. Has there been a change in personnel qualified in manufacturing the QBL part?
8. Has there been a change in equipment utilized to manufacture the QBL part?
9. Has there been a change in the subcontractors utilized in the manufacture of the QBL part?
10. Are current quality management system processes in compliance with
ISO 9001:2018?
11. Are there changes in material or process specifications which will impact availability?
QBL Submission Form Enclosure 2
Questions
YES NO
12. Has an established or revised production plan established a need for specialized inspection tooling?
13. Are there any circumstances not covered by the questions listed that will adversely affect quality or schedule?
ADDITIONAL INFORMATION
If needed, use the below section to provide additional guidance/instructions/criteria belonging to the information request table.
Preparer Signature
NSWC Representative Acknowledgment Signature:
Date:
Date:
| DATE OF SURVEY SUBMISSION: |
| INITIAL QUALIFICATION CHECKLIST: |
| MANUFACTURING VENDOR DESIGNATED POINT OF CONTACT Please include name email address and telephone number of the POC: |
| PART NAME: |
| PART NUMBER: |
| REVISION: |
| ADDITIONAL INFORMATION If needed use the below section to provide additional guidanceinstructionscriteria belonging to the information request tableRow1: |
| Date: |
| Date_2: |
| Check Box1: Off |
| Check Box4: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
File details come from the government source that posted it. Updated .