QBL Initial and Follow-up Survey.pdf

PDF 324 KB Posted

Attached to
CKU-5 Parts
Solicitation number
N0017425R1013
Issued by

About this file

This document is a QBL (Qualified Bidders List) Initial & Follow-Up Qualification Survey form from the Naval Surface Warfare Centers (NSWC). The two-page form is designed to comprehensively assess a manufacturing vendor's qualifications and capabilities for a specific part, with 13 detailed questions covering manufacturing processes, quality management, personnel, equipment, and potential changes that could impact production. The survey allows for both initial qualification and follow-up assessments, with key areas of inquiry including the existence of standard operating procedures (SOPs), manufacturing plans, equipment and personnel qualification lists, inspection reports, management/ownership changes, and compliance with ISO 9001:2018 quality management standards. The form requires the manufacturing vendor to provide a point of contact and allows space for additional information or explanatory notes, with provisions for signatures from the preparer and an NSWC representative to validate the submission.

View the file

Other files

File Type Posted
N0017425R10130002 - Amendment 2.pdf PDF
N0017425R10130001.pdf PDF
CDRL A001_Redacted.pdf PDF
CDRL A003_Redacted.pdf PDF
CKU 5 - Past Performance Matrix.docx DOCX document
CKU5 - Contract Administration Plan.docx DOCX document
Solicitation - N0017425R1013.pdf PDF
CDRL A002_Redacted.pdf PDF
CDRL A004_Redacted.pdf PDF
CKU 5 - Past Performance Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QBL Submission Form Enclosure 2

QBL Initial & Follow-Up Qualification Survey

DATE OF SURVEY SUBMISSION:

INITIAL QUALIFICATION CHECKLIST

FOLLOW-UP CHECKLIST

CLARIFICATIONS

IMPORTANT - ANSWERING “NO” TO ANY OF THE FOLLOWING QUESTIONS DOES NOT AUTOMATICALLY WARRANT A DISQUALIFICATION. PLEASE ATTACH OR INCLUDE ANY SUPPORTING DOCUMENTATION ALONG WITH SUBMISSION OF THIS SURVEY.

MANUFACTURING VENDOR DESIGNATED POINT OF CONTACT: Please include name, email address and telephone number of the POC

QBL INFORMATION REQUEST TABLE for

PART NAME:

PART NUMBER: REVISION:

Questions (For Follow-Up Qualification, please skip to question #6.)

YES NO

1. Is an SOP, manufacturing plan or process plan in place? (If answered “NO”, please skip to question #3)

2. Does the SOP, manufacturing plan or production plan include shop travelers/route cards?

3. Do you have a list of the equipment and personnel qualified for manufacture of the QBL part(s)? (If answered “YES”, please skip to question #5.)

4. Is there an established in-process and final inspection report available?

5. Current equipment and personnel in mind, would the absence of qualified personnel or equipment greatly affect the production of the QBL part?

6. Has there been a change in management or ownership since the last QBL deliverable?

7. Has there been a change in personnel qualified in manufacturing the QBL part?

8. Has there been a change in equipment utilized to manufacture the QBL part?

9. Has there been a change in the subcontractors utilized in the manufacture of the QBL part?

10. Are current quality management system processes in compliance with

ISO 9001:2018?

11. Are there changes in material or process specifications which will impact availability?

QBL Submission Form Enclosure 2

Questions

YES NO

12. Has an established or revised production plan established a need for specialized inspection tooling?

13. Are there any circumstances not covered by the questions listed that will adversely affect quality or schedule?

ADDITIONAL INFORMATION

If needed, use the below section to provide additional guidance/instructions/criteria belonging to the information request table.

Preparer Signature

NSWC Representative Acknowledgment Signature:

Date:

Date:

DATE OF SURVEY SUBMISSION:
INITIAL QUALIFICATION CHECKLIST:
MANUFACTURING VENDOR DESIGNATED POINT OF CONTACT Please include name email address and telephone number of the POC:
PART NAME:
PART NUMBER:
REVISION:
ADDITIONAL INFORMATION If needed use the below section to provide additional guidanceinstructionscriteria belonging to the information request tableRow1:
Date:
Date_2:
Check Box1: Off
Check Box4: Off
Check Box2: Off
Check Box3: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off

File details come from the government source that posted it. Updated .