QASP OPIR GAP.pdf
PDF 497 KB Posted
- Solicitation number
- FA857925R0003
About this file
This is a Quality Assurance Surveillance Plan (QASP) for contract FA8579-24-C-XXXX supporting the Next-Generation Overhead Persistent Infrared (Next-Gen OPIR) program at the 402nd Software Engineering Group (SWEG) at Robins AFB, Georgia. The QASP establishes procedures for government oversight of contractor performance in conducting gap analyses to determine the differential between current and required SWEG organizational capabilities to perform Next-Gen OPIR workloads.
The QASP details specific performance requirements including: attending a project kick-off meeting within 5 days of award, delivering personnel rosters within 5 days, providing a project planning chart within 30 days, and delivering technical reports within 150 calendar days. The contractor must provide monthly status reports by the 5th of each month and respond to technical inquiries within 3-5 days. Key personnel include Program/Project Managers Martin Birdsey and Bailey Heyman, Contracting Officer Lasonia Anderson, and COR Paul Miles. The QASP includes detailed surveillance matrices, inspection methodologies, and templates for Corrective Action Reports (CARs), Performance Assessment Reports (PARs), and customer complaints. Performance ratings range from Exceptional to Unsatisfactory based on defined criteria.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
FOR
FA8579-24-C-XXXX
NEXT-GENERATION OVERHEAD PERSISTENT INFRARED
(NEXT-GEN OPIR)
402nd Software Engineering Group (SWEG)
Robins AFB, Georgia
26 NOV 2024
Prepared by:
Paul Miles
1. Vision
The Next Generation Overhead Persistent Infrared (Next-Gen OPIR) program is intended to first augment, then replace, the Space Based Infrared System (SBIRS) program-of-record and will utilize two sets of satellites that provide worldwide initial warning of ballistic missile attacks on the United States using Infrared detection. Next-Gen OPIR GEO (NGG) satellites will have a
Geosynchronous Earth Orbit with coverage around the equator. Lockheed Martin is the prime contractor for the NGG Space vehicles with Raytheon as a subcontractor for the satellites’ payload. Next-Gen OPIR Polar (NGP) will consist of satellites providing infrared coverage of the northern polar region. Northrop Grumman is prime for these satellites with Ball Aerospace providing their payloads..
2. Mission
The Contractor shall perform Gap Analyses to determine the differential between where the
SWEG organizations are and where they need to be to perform this workload. The PWS describes the performance objectives and standards expected of the contractor to provide information necessary for SWEG to produce the gap analysis documents. provide support with
Next-Gen OPIR for workloads at or below the SECRET level to the 402d Software Engineering
Group (SWEG)/578 Software Engineering Squadron (SWES), Warner Robins Air Logistics
Complex (WR-ALC) at Robins Air Force Base (AFB), Georgia. The contractor shall provide all supervision, management, labor, tools, equipment, parts, materials, and transportation to Warner
Robins, Georgia. as outlined in the PWS.
3. Purpose
This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
• What will be monitored
• How monitoring will take place
• Who will be conduct the monitoring
• How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
4. Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition
Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
5. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides program oversight. While the PM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf.
Assigned PM (PM): Martin Birdsey
Organization or Agency: 402 SWEG/578 SWES
Telephone: (478) 951-4035
Email: martin.birdsey@us.af.mil
Alternate PM (PM): Bailey Heyman
Organization or Agency: 309 SWEG/517 SWES
Telephone: (719) 556-2981
Email: bailey.heyman@us.af.mil
Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Assigned CO: Lasonia Anderson
Organization or Agency: AFMC AFSC/PZIM
Telephone: (478) 468-4048
Email: lasonia.anderson @us.af.mil mailto:martin.birdsey@us.af.mil mailto:bailey.heyman@us.af.mil mailto:valerie.evans.1@us.af.mil
Contracting Officer’s Representative (COR) - The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR will use the QASP to conduct the oversight/surveillance process. The COR shall use PIEE/SPM to accurately document the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment to the CO which will be used in documenting past performance.
The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the
Government’s behalf. Reviews performance prior to execution of options and assists in determining if contract as agreed upon met mission objectives. Documents past performance for input to the Contractor Performance Assessment Reporting System (CPARS).
Assigned COR: Paul Miles
Organization or Agency: AFSC/SWP-C
Telephone: (801) 775-3541
Email: paul.miles.2@us.af.mil
Contracting Officer’s Representatives Supervisor - Supervises and manages all assigned
CORs. Oversees the COR self-nomination process in CORT Tools. The COR Supervisor ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities, reviews COR documentation on a regular basis, and evaluates performance of COR duties as part of performance assessment throughout the period of the contract.
Assigned COR Supervisor: Adam Shepherd
Telephone: (801) 777-7777
Email: adam.shepherd@us.af.mil
Lead Contracting Officer’s Representatives (LCOR) – The LCOR tracks monthly surveillance schedules, review all COR monthly status reports. Additionally, the LCOR maintains CAR data base, processes CARs for review, and collaborates with COR Supervisor, COR, and QAPC regarding contractor performance.
Assigned Lead COR: Garry S. Navas
Telephone: 801-777-4413
Email: Garry.Navas@us.af.mil
Acquisition Management Support Specialist (AMSS) - Serves as the primary SWEG customer representative familiar with the service requirements. AMSS will review contractor performance prior to execution of options. Periodically reviews contract specifications to determine if contract as written meets mission objectives. May provide input to the Contractor Performance
Assessment Reporting System (CPARS). Leads multi-functional team contract management reviews.
mailto:paul.miles.2@us.af.mil mailto:adam.shepherd@us.af.mil mailto:Garry.Navas@us.af.mil
Assigned AMSS: Gregory Hernandez
Organization or Agency: AFSC/SWP
Telephone: 801-775-6701
Email: gregory.hernandez@us.af.mil
Quality Assurance Program Coordinator (QAPC) - The QAPC is appointed to integrate the quality contract requirements into the quality assurance program, act as the liaison between the contracting and functional organizations, and provide training and record keeping IAW MP
5346.103. Ensure consistent guidance is given to customers by QAPC and other functional areas, train CORs and COR management (e.g. COR Supervisor, Functional
Commanders/Directors (FC/FD) on the contracting requirements associated with the quality assurance program. Assist, as required, with the evaluation of contractor Quality Control Plans and maintain a record of all COR and COR management training, including refresher training
(e.g., QAPC, contracting officer, contract specialist, contract administrator, Defense Acquisition
University, or commercial training provider).
Assigned QAPC: Garry S. Navas
Telephone: 801-777-4413
Email: Garry.Navas@us.af.mil
Contractor Representatives - The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. (Complete this section after the contract award)
Program Manager –
Telephone:
Email:
Contracts Manager -
Other Key Contract Personnel
General Manager:
mailto:%20gregory.hernandez@us.af.mil mailto:Garry.Navas@us.af.mil
6. Performance Requirements and Method of Surveillance
6.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the CO, PM and the Contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the Contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract. Multi-functional Team Meetings – The Multi-functional team will manage the contract throughout the life of the contract. This team will form a partnership between the government and the contractor to ensure the best possible service is provided for the life of the contract. All performance assessment data will be reviewed at these meetings. If performance improvement is necessary, a plan of action will be created.
6.2 Surveillance Matrix
The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Services
Summary should be used to form the foundation of the COR’s inspection checklist.
6.3 Performance Rating Definitions
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating
Criteria
Exceptional Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
Very Good Performance meets contractual requirements and exceeds some to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor was effective.
Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. Performance meets contractual requirements.
The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
6.4. Contract Performance Assessment Reporting System (CPARS)
If applicable, CPARs will be initiated annually, documenting contractor performance for this specific contract. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance. The COR and Government
Program Manager will serve as the Assessing Official Representative(s) and the SWEG Deputy
Directors will serve as the Assessing Official for contracts over $1,000,000.00 aggregate.
7. Performance Reporting
7.1 Corrective Action Report (CAR)
CARs will be forwarded to the Lead COR (LCOR) for review and validation; after which the
LCOR will forward the CAR to the CO for action (CC COR). A copy will be provided to the
Contractor’s representative by the CO. CARs will be corrected within thirty (30) days depending on the complexity of the finding. The Contractor may be allowed up to six (6) months (maximum) to correct a CAR, at the discretion of the CO. The COR will ask the status of the CAR from the CO on a monthly basis. The COR will keep an electronic log of all CARs and will keep a hard copy of CARs in PIEE/SPM.
7.2 Performance Assessment Report (PAR)
PARs will be used to report ALL minor discrepancies. PARs will be generated by the COR.
The COR will forward the PAR to the Contractor for corrective action. Contractors will be given ten (10) days to correct PARs unless they have requested an extension. If three (3) minor discrepancies are found, combine them and process a CAR. PARS will also be written to record
Contractor successes.
7.3 Customer Complaint Form
The COR must furnish instructions to the customer receiving the contractor’s service. The customer must retain supporting evidence of complaint or feedback. After the COR validates feedback or complaint demonstrating contractor noncompliance, the COR will process a PAR or
CAR. ALL Customer Complaint forms WILL BE VALIDTAED by the COR prior to notifying the contractor.
7.4 COR Monthly Surveillance Report
The COR shall use the “COR Monthly Surveillance Report” (see attached) template for their monthly “pre inspection” and for the end of month report using information from Section 7.
This information will be submitted into CORTT IAW the required frequency and as directed by the CO.
7.4 Surveillance Matrix
7.4.1 Services Summary Items
Inspection &
PWS
Paragraph
Performance
Objective / Elements
Standards / AQL Inspection Calculation /
Ratings What How/ Method When/ Freq
SS# 1
Performance Work
Statement (PWS)
Paragraph (Para.):
2.3.1, Project Kick-off
Meeting
The Contractor shall attend the Project Kick-off Meeting
IAW PWS Para: 2.3.1
Contractor shall attend the
Project Kick-off meeting and provide input and understanding of all of the elements of this section specified
Attendance to the
Project Kick-off
Meeting five (5) days after award
COR will validate through inspection with the
Government PM for completeness and accuracy
Event Driven
M4
Performance is acceptable when contractor attends the
Project Kick Off
Meeting within five (5) days after award
SS# 2
PWS Para: 2.3.2 &
4.1
Personannl Roster
The Contractor shall provide a key personnel roster of employees assigned under this contract
IAW PWS Para: 2.3.2 & 4.1
Contractor shall deliver
CDRL A009 sections as listed PWS and DD Form
1423-1
Receipt of CDRL is five (5) days after award
COR will validate through inspection with the
Government PM for completeness acceptable when contractor delivers the required CDRL is five
(5) days after award
SS# 3
PWS Para: 2.3.4, 4.3
Project Planning
Chart
The Contractor shall provide a Project Planning Chart no later than 30 days from contract award, to include, expected start, review, and completion dates of deliverable reports in
Section 3 of this PWS.
IAW PWS Para: 2.3.4 & 4.3 specified CDRL A011 listed
PWS and DD Form 1423-1
Receipt of CDRL is thirty (30) days after award
COR will validate through inspection with the
Government PM for completeness acceptable when contractor delivers the required CDRL is thirty (30) days after award
SS#4
PWS Para:3.1-3.8
General
Deliverables
The contractor shall deliver all Technical Reports on the due dates as outlined in the
PWS – any changes will be updated and submitted within ten (10) business days. Contract Data
Requirements List
IAW PWS Para: 3.1-3.8 specified CDRL A001-A008 sections as listed in the PWS and DD Form 1423-1 for each
CDRL
Receipt of CDRLs is 150 calender days after award
COR will validate through inspection with the
Government PM for completeness acceptable when contractor delivers the required CDRLs 150 calendar days after contract award
Inspection &
Paragraph
Performance
Objective / Elements
Standards / AQL Inspection Calculation /
Ratings What How/ Method When/ Freq
SS#5
PWS Para: 3.1-3.8
Technical Report
Content
Contractor shall deliver all
Technical Reports which address all elements outlined in PWS Section 3 for all
CDRLs.
IAW PWS Para: 3.1-3.8 specified CDRL A001-A008 sections as listed in the PWS and DD Form 1423-1 for each
CDRL
Receipt of CDRLs is 150 calender days after award
COR will validate through inspection with the
Government PM for completeness acceptable when contractor delivers the required CDRLs 150 calendar days after contract award which cover 100% of all elements outlined in the PWS
SS#6
Para: 4.2
Monntly Status
Report (MSR)
Contractor MSR shall include a narrative review of contractor accomplishments, and a summary of tasks and milestone progress, Contract
Project Planning Chart, financial invoice submission status and current Key personnel roster changes, technical inquiries completed during the previous calendar month.
MSR shall be provided by the 5th day of the following month.
CDRL A010.
IAW PWS Para: 4.2
CDRL A010
Receipt of required CDRL information as outlined in PWS
The COR will review the report and coordinate with the
Government PM for completeness and accuracy
Reports shall be reviewed upon receipt
M2 acceptable when - No later than the 5th day of the month following the month of performance, reports are received 100% on time
SS# 7
PWS Para: 4.2.1
Technical Inquiries
The Contractor shall respond to emails to answer technical issues or questions
IAW PWS Para: 4.2.1
The Contractor shall confirm receipt of the request within 3 calendar days of the request and shall provide a response with a proposed resolution or path forward within 5 calendar days of receipt request.
Acknowledge and answer technical inquiries
COR will validate through inspection with the
Government PM for completeness acceptable when contractor confirms receipt of technical inquiries in three (3) days and responses in five days after receipt of Technical Inquires
SS#8
Para. 7.2
Quality
Management
System (QMS)
The Contractor shall ensure the quality of services through a quality control and inspection system.
Within 15 days of contract award, the Contractor shall submit a Quality Program
Plan (QPP)
IAW PWS Para. 7.2
Contractor shall deliver
CDRL A012 as listed PWS and DD Form 1423-1
COR shall inspect the QPP upon receipt and coordinate with the PM
COR will validate through inspection with the
Government PM for accuracy acceptable when contractor delivers the
QPP with 15 days of contract award
SS#9
Para:7.6.1
Contractor Program
Manager (PM)
The Contractor shall provide a Program Manager (PM) who shall be the single point of contact responsible for
Contractor personnel, including all administrative duties of Contractor personnel, and act as a liaison to the Government for contract performance matters. .
IAW PWS para: 7.6.1
Contractor shall the provide the PM name and phone number no later than 5 days after contract award
Receipt of
Contractor PM details as outlined in the PWS para.
The COR will follow-up on all customer complaints to ensure all PM is adhering to PWS acceptable when the
CO and COR receive the Contractor’s PM details were received within 5 days of contractor award or change of PM
7.4.2 Non-Services Summary Items
(Applicable to all other requirements in the PWS not included in the Services Summary)
Inspection Methodologies:
M1: Periodic: Periodic surveillance/inspection is the type of surveillance that is based upon selecting samples for evaluation on other than 100% inspection or on a statistically random basis. Periodic surveillance can be accomplished, weekly, monthly or quarterly using a checklist method.
M2: Inspection of Reports: All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or
Substance).
M3: Technical Inspection: Surveillance/inspection is the type of surveillance that will be performed as specified on the project schedule by actually looking at the work being done.
M4: Non-Service Summary: All Non-SS items will be done on a random basis, at a 1/12 sampling IAW WR-ALC PMAP instructions, to ensure that all items are inspected during the year.
Non-SS# &
Paragraph
Performance Objective
/ Elements
Standards / AQL Inspection Calculation /
Ratings What How/ Method When/ Freq
Non-SS #1
Para: 7.7 to 7.7.8
Security
Requirements
Contractor shall adhere to all Security Requirements and Regulations as Follows:
• Security Clearance
• Communications
Security (COMSEC)
• Operations Security
(OPSEC)
• Controlled
Unclassified
Information (CUI)
• Security Incident or
Violation
• Requirements for
Contractor Credentials
• Access to Government
Systems
As outlined PWS
Para: 7.7 to 7.7.8
Contractor shall adhere to all Security Requirements as outlined in the PWS 100% of the time.
Inspection of adherence to
Security
Requirements
COR will validate adherence through coordination with
402 SWEG
Security
Department and the PM during surveillance
Periodic
Surveillance
M1
Acceptable if
Contractors are adhering to the PWS and ensuring contractor employees are following all
Security Regulations and other Security
Requirements as outlined in the PWS
100% of the time.
Non-SS#2
Para. 9.2, 9.2.1
Agency
Affirmative
Procurement
Program
Contractor shall particiatpe in the Agency
Affirmative Procurement
Program
IAW PWS Para. 9.2, 9.2.1 and other Governing
Regulations the contractor shall purchase
EPA items according to the Affirmaitive
Procurement Program
COR will validate
EPA purchases to ensure compliance
COR will validate through inspection of purchase records acceptable when contractor is IAW
PWS and FAR
23.404(b)(1) requirements
8. Trafficking in Person
8.1 IAW PGI 22.1703(4) the QASP should describe how the COR will monitor the contractors performance regarding compliance with FAR 52.222-50, Combat trafficking in persons.)
8.2 The Contractor shall comply with FAR 52.222-50, Combating Trafficking in Persons.
Additional information about Trafficking in Persons can be found at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons below.
8.3 In accordance with the Defense Contingency COR Handbook section on Combating
Trafficking in Persons, the COR must inform the PCO if the Contractor/subcontractor and/or
Contractor/subcontractor personnel fail to comply with the requirements of FAR 52.222.50. The
PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law
Enforcement and Support / Office of Under Secretary of Defense (OUSD) Personnel and
Readiness (P&R) Defense Human Resources Activity (DHRA).
http://www.acq.osd.mil/dpap/ccap/cc/corhb/Files/DCCOR_Handbook_2012.pdf
COR Monthly Surveillance Report
"The information herein is For Official Use Only (FOUO) which must be protected under the Privacy Act of 1974, as amended.”
Contract #: Contractor: Order
COR(s): POP: Date: (date submitted)
1. Service Summary SS# Performance Objective PWS Ref Method of
Surveillance Comments
(Positive or Negative) In Compliance
Y N
Non
SS#
Requirement PWS Ref Method of
Surveillance Comments
(Positive or Negative)
In Compliance
Y N
CORRECTIVE ACTION REPORT (CAR)
TO: (Contractor / Managers Name)
FROM: (COR)
CAR#:
DATES
DATE PREPARED
RETURNED BY CONTRACTOR
COMPLETED
GOVERNMENT FINDINGS
DESCRIPTION OF NON-COMPLIANCE (Include PWS/PWS/FAR reference of Deficiency)
SIGNATURE OF CONTRACTING OFFICER
CONTRACTOR RESPONSE
TO: FROM:
CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE: ATTACH
CONTINUATION SHEET IF NECESSARY.
SIGNATURE OF CONTRACTOR REPRESENTATIVE
DATE
GOVERNMENT RESPONSE TO CONTRACTORS ACTIONS
GOVERNMENT EVALUATION
GOVERNMENT ACTIONS
CLOSE OUT
NAME-TITLE SIGNATURE DATE
CONTRACTOR
COR
PCO
CMO/COR, SPF Form 060, version-1, Nov 08
PMAP Attachment A6
Continuation of GOVERNMENT FINDINGS
Continuation of CONTRACTOR RESPONSE
Continuation of GOVERNMENT RESPONSE
CMO/COR, SPF Form 060, version-1, Nov 08
PMAP Attachment A6
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (QAP) SIGNATURE AND DATE
5. QAP PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS
CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF
QAP CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR QAP SIGNATURE AND DATE
15. QAP REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQCP)
PERFORMANCE ASSESSMENT REPORT
Continuation Sheet
(Number to correspond with applicable Item Number on reverse)
Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQCP)
Performance Assessment Report (PAR) Instructions
Block 1. COR or Quality Assurance Personnel (QAP) enters contract or task order number.
Block 2. QAP enters contractor name.
Block 3. QAP enters type of services.
Block 4. QAP signs and dates.
Block 5. QAP enters telephone number.
Block 6. QAP assigns suspense date for Contractor Representative validation if a deficiency box was checked.
Part I. Contractor Performance
Block 7. QAP checks all boxes that apply.
Block 8. QAP enters Services Summary or Statement of Work (PWS) paragraph item reviewed.
Block 9. QAP enters brief description of deficiency and tracking number if the deficiency box was checked in Block 7.
Detailed description will be on Corrective Action Report (CAR).
Block 10. QAP enters a detailed performance assessment if the deficiency box in Block 7 was not checked.
Parts II and III will be used only if a deficiency was documented in Part I.
Part II. Contractor Validation
Block 11. Contractor Representative checks one box in response to QAP cited deficiency. If Concurrence is indicated, Contractor Representative continues to Block 12. If Non-Concurrence is indicated, continue to Block 13 and state reason(s) for Non-Concurrence with QAP cited deficiency and return PAR to QAP.
Block 12. Contractor Representative enters Estimated Completion Date of Corrective Action and continues to Block 13.
Block 13. Contractor Representative details Corrective Action and the Action Taken to Prevent Recurrence or Reason for
Non-Concurrence of QAP cited deficiency.
Part III. Deficiency Corrected
Block 14. QAP checks appropriate block, signs, and dates.
Block 15. (Required Entry) QAP remarks regarding the Corrective Action and the Action Taken to Prevent Recurrence.
If Non-Concur was checked, this block should be very detailed to explain why.
Block 16. Contractor Representative enters remarks if further discussion is needed about QAP concurrence with
Contractor’s Corrective Action and Action Taken to Prevent Recurrence.
Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.
CUSTOMER COMPLAINT FORM
Contracted Services Location: Bldg. #: Organization:
Contract Noun: Contract #:
Time: Date:
WE DESIRE TO IMPROVE THE QUALITY AND RELIABILITY OF THE CONTRACT LISTED AND APPRECIATE
YOUR COMMENTS VIA FEEDBACK REPORTING. PLEASE COMPLETE (PERFORMANCE COMMENTS BELOW
AND E-MAIL OR SEND THFORM TO THE QUALITY ASSURANCE EVALUATOR (QAE) ASSIGNED TO THIS
CONTRACT.
EXCEPTIONAL: VERY GOOD: SATISFACTORY: MARGINAL: UNSATISFACTORY:
Contract Performance Comments:
NAME/GRADE PHONE:
INITIATOR'S ORGANIZATION:
SPF FORM 90 Version Aug 10
FOR OFFICIAL USE ONLY
File details come from the government source that posted it. Updated .