QASP for 20Q0105.pdf
PDF 35 KB Posted
- Attached to
- Verification, Validation & Accreditation of the Medical Cost Avoidance Model for the USAPHC
- Solicitation number
- W81XWH20Q0105
- Issued by
-
Department of the Army Medical Command
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) and Performance Work Statement for a firm-fixed price contract to conduct verification, validation, and accreditation services for the Medical Cost Avoidance Model application used by the U.S. Army Public Health Center. The contractor shall deliver a Verification and Validation Plan within 6 months of award, a Verification and Validation Report 60 days prior to completion, an Accreditation Plan within 6 months of award, and an Accreditation Report 60 days prior to completion. All reports shall follow Department of Army and Military Standard guidelines. The QASP establishes procedures for continuous government oversight to ensure the contractor meets quality standards for timeliness and technical completeness. It details performance requirements and inspection methods for surveillance by the Contracting Officer's Representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MIL-STD-3022.pdf | ||
| PWS for solicitation W81XWH20Q0105.pdf | ||
| RFQ - W81XWH20Q0105.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
US Army Public Health Center (APHC)
Verification, Validation, and Accreditation of the Medical Cost Avoidance Model
1. Vision
The U.S. Army Public Health Center (APHC) is part of the U.S. Army Medical Command (MEDCOM) and encompasses epidemiology, laboratory sciences, occupational health sciences, public health information and toxicology to enhance Army readiness and assure the quality and effectiveness of Army’s Public Health Enterprise.
2. Mission
The APHC’s mission is to enhance Army readiness by identifying and assessing current and emerging health threats, developing and communicating public health solutions, and assuring the quality and effectiveness of the Army's Public Health Enterprise.
3. Purpose
3.1. This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor's performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
3.1.1. The Government will exam all service actions to ensure quality standards have been met, on time and is technically complete. Inspections wills also include the accuracy of the invoice submitted to Wide Area Workflow (WAWF). Any unacceptable deliverables will be documented by the COR and communicated to the contract or for immediate resolution. Documentation will record the Contractor’s past performance. This documentation becomes the official Government record of the Contractor’s performance.
When surveillance detects unacceptable service, the COR will record the information and request the Contractor to verify via email the unacceptable service.
The Contractor will be required submit corrective actions, alleviating the unacceptable performance. The results will be documented.
3.1.2. The Contracting Officer’s Representative (COR) will use direct observation techniques for monitoring progress of the Verification, Validation, and Accreditation of the Medical Cost Avoidance Model through the review of the monthly reports and the performance requirements as outlined in the surveillance matrix of this document.
3.1.3. The COR will document the monitoring on the monthly COR report.
3.2. The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government's surveillance of the contractor's performance to assure that it meets contract standards. It is the government's responsibility to be objective, fair and consistent in evaluating contractor performance.
3.3. The QASP is not part of the contract nor is it intended to duplicate the contractor's quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
3.4. The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
4. Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
5. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
5.1 Contracting Officer (KO)
The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract.
Determine and document the final assessment of the contractor's performance in the governments past performance tracking system.
Assigned KO: This section is to be completed at time of award
Organization or Agency: To be completed at time of award
Telephone:
Email:
5.2 Contracting Officer's Representative (COR)
The COR is responsible for providing continuous technical oversight of the contractor's performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor's actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to many any contractual commitments or to authorize any contractual change on the Government's behalf.
Assigned COR:
Organization or Agency: U.S. Army Public Health Center (APHC)
Telephone:
Email:
5.4 Contractor Representatives
The following employees of the contractor serve as the contractor's Program Manager and Task Manager for this contract. (This section is to be completed at time of award)
5.4.1. Program Manager
Name:
Telephone:
Email:
6. Performance Requirements and Method of Surveillance
This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
6.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR's contribution is their professional, non-adversarial relationships with the KO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor's performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
6.2 Surveillance Matrix
6.2.1. The Surveillance Matrix Table 1 is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
6.2.3. Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor's performance as it relates to the performance element standards. The matrix should be used to form the foundation of the COR's inspection checklist. In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance Rating
Criteria
Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Table 1 - Surveillance Matrix
Performance Requirement Performance Target Method of Surveillance
Method of Inspection
The contractor must provide the Verification and Validation (V&V) Plan to the COR.
Plan delivered no later than 6 months after contract award with specified elements as outlined in Department of Army (DA) Pamphlet 5- 11 and Military Standard
(MIL-STD) 3022.
COR receives the V&V plan electronically.
Review report upon receipt by COR and APHC Quality Manager.
The contractor must provide the Verification and Validation (V&V) Report to the COR.
Report delivered no later than 60 days prior to the end of the period of performance with specified elements as outlined in DA Pamphlet 5-11 and
MIL-STD 3022.
COR receives the V&V report electronically.
Review report upon receipt by COR and APHC Quality Manager.
The contractor must provide the Accreditation Plan to the
COR.
Plan delivered no later than 6 months after contract award with specified elements as outlined in Department of Army (DA) Pamphlet 5-11 and Military Standard
(MIL-STD) 3022.
COR receives the V&V plan electronically.
Review report upon receipt by COR and APHC Quality Manager.
The contractor must provide the Accreditation Report to the
COR.
Report delivered no later than 60 days prior to the end of the period of performance with specified elements as outlined in DA Pamphlet 5-11 and
MIL-STD 3022.
COR receives the V&V report electronically.
Review report upon receipt by COR and APHC Quality Manager.
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6.
CONTROL
NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT
RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
CUSTOMER COMPLAINT RECORD
DATE/TIME OF
COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION BUILDING
NUMBER
INDIVIDUAL PHONE
NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND
DATE
5. COR PHONE 6.
SUSPENSE
DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT
APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS
PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF
DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE
ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED
COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE
OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS