QASP.docx

DOCX document 21 KB Posted

Attached to
G004--Emergency Shelter for Homeless Veterans
Solicitation number
36C24624Q0154
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide Emergency Short-Term Rehabilitative Veteran Housing Services at the Hampton VA Medical Center in Hampton, VA.

The QASP outlines the performance standards, monitoring methods, and incentives/disincentives the government will use to evaluate the contractor's performance. Key performance areas include meeting contract requirements, personnel qualifications, referrals, attendance, conduct, complaints handling, transportation, facility maintenance, and safety. The government will use direct observation, veteran feedback, and documentation review to assess the contractor's performance against a 95% Acceptable Quality Level. Positive performance evaluations are the primary incentive, while negative evaluations and contract discrepancy reports are the disincentives. The Contracting Officer and Contracting Officer's Representative are responsible for surveillance and documentation of the contractor's performance.

View the file

Other files

File Type Posted
Attachment B - HCHV CRS Programs Inpection Packet.pdf PDF
36C24624Q0154_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The contractor shall be evaluated in accordance with the following QASP.

For: Hampton VA Medical Center (VAMC), Hampton, VA Contract Number:

Contract Description: Emergency Short-Term Rehabilitative Veteran Housing Services Contractor’s Name:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored

· How monitoring will take place

· Who will conduct the monitoring

· How monitoring efforts and results will be documented

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned Contracting Officer (CO): Diane Stoskopf / 757-728-3449 / diane.stoskopf@va.gov

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: TBD

3. CONTRACTOR REPRESENTATIVES

The following employees of the Contractor serve as the Contractor’s program manager for this contract.

a. Program Manager (Name): ____________________________________________

b. Program Coordinator (Name and Title): ____________________________________________

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

PERFORMANCE STANDARDS SUMMARY

ID
Task
Performance Objective
AQL
Method Of

Surveillance Incentive Disincentive

1
Requirement
Contractor shall meet the requirements as outlined in

Performance Work Statement (PWS)

95%
Direct Observation by COR/HCHV staff
Incentives: Favorable contactor performance evaluation.

Disincentive: Unfavorable contractor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

2
Personnel
Contractor shall meet the requirements as outlined in

PWS

95%
Direct Observation by COR/HCHV staff
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

3
Referrals
Contractor shall employ sufficient personnel to carry out the policies, responsibilities and the program for the facility as outlined in the PWS
95%
Direct Observation by COR/HCHV staff
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

4
Absences and Cancellations
Contractor shall meet the requirements as outlined in

the PWS

95%
Veteran Feedback documented and COR Monitoring
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

5
Conduct
Contractor shall perform services as outlined in the PWS
95%
Direct Observation by COR/HCHV staff
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

6
Complaints Handling
Contractor shall perform services as outlined in the PWS
95%
Direct Observation by COR
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

7
Transportation
Contractor shall meet the requirements as outlined in

the PWS

95%
Veteran Feedback and COR/HCHV staff documentation
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

8
Facility
Contractor shall perform services as outlined in the PWS
95%
Veteran Feedback and COR/HCHV staff direct observation
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

9
Inspection/ Acceptance
Contractor shall perform services as outlined in the PWS
95%
Direct Observation by COR/HCHV staff
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

10
Safety
Contractor shall perform services as outlined in the PWS
95%
Veteran feedback and COR / HCHV staff observation
Incentives: Favorable contactor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level of service.

5. INCENTIVES/DISINCENTIVES

The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If repetitive or consistent, the government shall take further corrective action or begin termination procedures. Incentives/disincentives shall be based on exceeding, meeting, or not meeting performance standards.

6. PROCEDURES/METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. Direct Observation. (Can be performed periodically or through 100% surveillance.)

b. Veterans complaints. Any complaint data is reviewed by the CO/COR – any validated complaints against a contractor will be further investigated.

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance.

Neutral Outcome: No more than 3 incidents of not meeting the performance standard during the period of performance.

Negative outcome: More than 5 incidents of not meeting the performance standard during the period of performance.

8. DOCUMENTING PERFORMANCE

a. Acceptable Performance: The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. Unacceptable Performance: When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor has to present this corrective action plan to the CO and COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement: During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings: The COR shall meet with the contractor as needed to assess performance.

Program Manager

Contracting Officer’s Representative (COR)

File details come from the government source that posted it. Updated .