This is a Quality Assurance Surveillance Plan (QASP) for a Burner Management System (BMS) maintenance and repair contract. The document establishes the Government's procedures for monitoring and evaluating contractor performance against contractual standards, with authority derived from Federal Acquisition Regulation Part 46 Inspection of Services clauses. The QASP is designed as a living document that allows flexibility to increase or decrease surveillance levels based on contractor performance and changing contract requirements.

The Performance Surveillance Matrix identifies five key performance objectives with corresponding standards and surveillance methods. PRS#1 requires timely delivery of inspection, maintenance, and repair services with advance scheduling notification, daily site contact with the Contracting Officer's Representative (COR), on-time service reports, repair quotes, and prompt completion of required repairs. PRS#2 establishes quality delivery standards requiring proper maintenance documentation, logs, and proactive identification of issues with proposed repairs. PRS#3 addresses effective management of unscheduled repairs with timely completion and minimal facility impact. PRS#4 mandates compliance with applicable Safety, Health and Environmental regulations, including proper Lockout-Tagout (LOTO) procedures and OSHA standards, with surveillance through periodic and unscheduled inspections and direct observation. PRS#5 requires work performance in compliance with state and Federal regulations, codes, OSHA standards, and equipment manufacturer instructions, verified through periodic inspections and random surveillance. Government oversight is coordinated by the Program/Project Manager, Contracting Officer's Representative, and designated supervisors of contracted personnel, who are not authorized to make contractual commitments or changes on behalf of the Government.

View the file

Other files

File Type Posted
PWS- attachment- BEI test checklist- example.pdf PDF
36C26126Q0756_1 Boiler Plant Services.pdf PDF
WD 2015-5623.pdf PDF
WD 2015-5641.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government-developed document used to determine if the Contractor's performance meets the performance standards contained in the contract at the contract level.

The QASP establishes procedures on how this assessment/inspection process will be conducted.

The Contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the Government's surveillance of the Contractor's performance at the contract level to assure that it meets contract standards. It is the Government's responsibility to be objective, fair and consistent in evaluating

Contractor performance. The Government should recognize in the performance of the QASP that unforeseen or uncontrollable circumstances might occur that are outside the control of the

Contractor.

The QASP is not intended to duplicate the Contractor's quality control plan. This QASP is a living document and will change at the Government’s discretion in accordance with changes in contract requirements and the Government’s determination of the effort required to ensure successful Contractor performance of the contract requirements. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on

Contractor performance.

Bottom line, the Government’s performance of the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

1. AUTHORITY

Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition

Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract.

2. ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate QASP activities. They are not empowered to make any contractual commitments or any contract changes on the Government’s behalf.

1. Program/Project Manager (PM)

2. Contracting Officer’s Representative (COR)

3. Other Designee (direct supervisor (s) of contacted personnel)

Exhibit A. Performance Surveillance Matrix

Performance Objective

(Performance Related

Specification)

Performance Standard / Acceptable

Quality Level (AQL)

Surveillance Method

PRS#1: Contractor delivers product/ services on time.

Contractor or his technicians perform inspection, maintenance and repair services of Burner management system (BMS) per schedule per contract, provide the schedule of planned maintenance work to COR ahead of time, contact the site manager and

COR on arrival at site each day of service, provide service reports on time per contract, identify needed repairs and provide quotes for repairs on time per contract, perform required repairs in a reasonable time as agreed on with

CO/COR, keep COR informed of any changes in schedule.

Contractor submits Source test documents to Bay Area Air Quality Management

District for permit in a timely manner.

Track service reports, track schedules and start and completion of maintenance and repairs.

PRS #2: Contractor delivers a quality product.

Contractor and his technicians perform maintenance of BMS and provide reports and maintain logs per contract, identify issues and their causes proactively with proposed repairs.

Track chiller maintenance reports and logs to identify recurring issues.

PRS #3: Contractor effectively manages and tracks unscheduled repairs

Contractor completes unscheduled repairs in a timely manner and ensures that impact to facility is avoided or minimized.

Review time taken to complete repairs and good faith effort by contractor to minimize impact.

PRS #4: Work is performed safely and impact to the environment is mitigated.

Contractor performs work in compliance with applicable Safety, Health and

Environmental regulations, Follows LOTO procedures safely and maintains LOTO record per OSHA standards.

Periodic Inspection (including unscheduled inspections), Direct Observation (including random surveillance). COR

Reviews all mishaps and injury reports. Inspection of

LOTO records.

PRS #5: Work is performed following the applicable codes, regulations specifications, procedures and technical data.

Contractor performs work in compliance with applicable state and Federal regulations, codes and OSHA standards and in compliance with equipment manufacturer’s instructions and guidelines.

Periodic Inspection (including unscheduled inspections), Direct Observation (including random surveillance).