View the file

Other files

File Type Posted
HC101320QA896-0001.v0.pdf PDF
Vendor Block Diagram Sample and Maps.pdf PDF
HC101320QA896.v2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND TRIP DELAY (RTD) FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER "Z" LOCATION.

2. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR RU28APR206620; MEANING THAT THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR RU28APR206620.

3. VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON EXTENSION FROM COMMERCIAL POP TO GOVERNMENT SERVICE DELIVERY POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9 DBM.

4. VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT THE "A" AND "Z" LOCATIONS.

5. VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. (C)618-418-9813 (D)418-9813; GROUP EMAIL ADDRESS:DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-LEASE-BB-T@MAIL.MIL

6. PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE TESTING.

7. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) VENDOR PROVIDED 10G ETHERNET SIGNAL TO THE DISA ROUTERS. 10GIGABIT ETHERNET OVER OTN (OTU2), OTU2 CIRCUIT WILL CARRY 10GBE LAN PHY PAYLOAD, THE VENDOR WILL DEMONSTRATE THAT THE PAYLOAD STRUCTURE IDENTIFIER (PSI) BYTE IN COLUMN 15, ROW 4 OF THE OTU2 FRAME CAN TRANSPORT VALUE 0X09 BIDIRECTIONALLY ERROR FREE. REFERENCE: PARA 17.4.1, ITU-T G.709/Y.1331 (06/2016) MAPPING OF GFP FRAMES INTO AN EXTENDED OPU2 PAYLOAD AREA. 10GIGABIT ETHERNET- LAN PHY INTERFACE REQUIRED AT COMMERCIAL DEMARC AT THE "A" AND "Z

(B) FIBER TERMINATION: FRAME FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET LAN-PHY-SINGLE MODE FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE: WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(C) COMMITTED INFORMATION RATE (CIR): 10GB

(D) ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES.

(E) NO NETWORK INTERFACE UNIT, DEDICATED PATH

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 (02/2016) ETHERNET SERVICE ACTIVATION - SIMPLE CIR VALIDATION TEST WITH EMIX PATTERN ADDFH. NOTE: ETHERNET FRAME SIZE DESIGNATOR 'H' (PHYSICAL MTU) IS EQUAL TO 9000 BYTES.

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECIEPT OF TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.

8. VENDOR MUST PROVIDE:

A. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.

B. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS.

C. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

9. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C)618-418-9950, (D)418-9950 TOLL FREE: 855-868-9950

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 10.3125 GIGABITS/S, +- 100 PPM

LINE CODE: OPTIC

1. TEST AND ACCEPTANCE: CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY 72 HOUR SOAK TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C)618-418-8627 (D)418-8627.

2. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST FRAME RATE, AND SHALL MEET ITU-T Y.1564 STANDARDS.

3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24 HOURS.

4. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS PER 350 MILES MEASURED AS THE GREAT CIRCLE DISTANCE BETWEEN THE "A" AND "Z" LOCATIONS.

5. ROUND TRIP DELAY VARIANCE (JITTER) SHALL BE NO MORE THAN 3MS.

File details come from the government source that posted it. Updated .