About this file

This document outlines technical requirements for a 10Gb wavelength transmission service between two locations in Florida. The fiber optic circuit must be engineered and provisioned with totally diverse paths meeting certain separation and availability standards. Technical specifications include Ethernet over SONET transmission with NRZ line coding at 10Gbps, 99.5% monthly availability, response times for repairs, no network interface units, dedicated paths, and visibility for the contractor. The contractor must also conduct 72 hour end-to-end testing per ITU standards and provide test results. Acceptance will be through the DISA Global CASA Infrastructure Integration Lease BB Team.

1. IN ACCORDANCE WITH INQUIRY HC101323QA203, PROCEED TO PROVIDE, INSTALL, AND MAINTAIN A 10GB WAVE SERVICE BETWEEN (BLDG) 533; (RM) 128; (FL) 1ST; 1225 PERSHING PLACE, PATRICK SFB, FL 32925 (PTRCKSFB/CCI) AND (BLDG) 919; (RM) COMPUTER; (FL) 2ND; 919 LANGLEY STREET, JACKSONVILLE NAS, FL 32212-0070 (JKSVLNAS/CCI). A. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR SG26APR238270. B. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. C. THIS 10GB WAVE TRUNK SUPPORTS BACKBONE SUSTAINMENT AND WILL REPLACE CCSD "62D5". 2. THE SERVICE DATE TO BE MET IS: 18 SEP 23 (SIP). THE GOVERNMENT WILL ASSESS CONSIDERATION IAW STANDARD PROVISION 42 FOR DELAY ON DELIVERY OF CIRCUIT ON CONTRACTED SERVICE DATE. 3. ESTABLISH TSP: TSP0MF2DJ-01 4. SEE ATTACHMENTS AND UNIQUE INSTALLATION FACTORS FOR TECHNICAL REQUIREMENTS SPECIFIC TO THIS ORDER. 5. CONTRACTOR MUST UPLOAD NOTICE OF COMPLETION IN IDEAS. 6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH INQUIRY HC101323QA204 / TSR SG26APR238270 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM TSR INQUIRY HC101323QA203 / TSR SG25APR238267; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR INQUIRY HC101323QA204 / TSR SG26APR238270.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HC101323QA203 - TESTING REQUIREMENTS

DIVERSITY/AVOIDANCE INSTRUCTIONS:

***ATTENTION PATRICK AFB LOCATION*** THIS REQUIREMENT MUST BE ENGINEERED AND

PROVISIONED TOTALLYDIVERSE END TO END TO THE GOVERNMENT'S SERVICE

DELIVERY POINTS (SDP'S) FROM CJON: SF21APR238552; MEANING THAT THE PHYSICAL

PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE

LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS

PHYSICAL SEPARATION FROM TSR SG26APR238270. ***THE 50 METER SEPARATION IS

WAIVED INSIDE BLDG 533 FOR PATRICK AFB LOCATION.***

THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR

TECHNICAL REVIEW SHOWING THE ROUTE FROM THE COMMERCIAL DEMARCS TO THE

SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. D RAWINGS MUST INCLUDE

TOTAL FIBER MILES AND ROUND-TRIP DELAY (RTD). ADDITIONALLY, THE VENDOR IS TO

PROVIDE DITCO WITH DETAILED CIRCUIT/PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML

FORMAT, IDENTIFYING ALL POINTS OF PRESENCE (POP) FOR PROPOSAL EVALUATION

AND AS A FINAL RECORD OF THE INSTALLED PATH. THESE DIAGRAMS MUST BE

PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE.MBX.IE16-PROVISIONING-TEAM@MAIL .MIL)

FOR HISTORICAL PURPOSES.

SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES. SINGLE MODE FIBER

MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE GOVERNMENT CAN

CHANGE/REVISE CHANNELIZATION WITHOUT TELECOM PROVIDER INTERVENTION.

A. NOTE 1 (JITTER): IN A STEADY-STATE CONDITION, THE PATTERN OF SYNCHRONOUS

TRANSPORT SIGNAL (STS) POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH

THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE NO MORE STRESSFUL (I.E.,

CREATE MORE JITTER THROUGH THE DESYNCHRONIZER AS DESCRIBED IN TABLE 6 OF

ANSI T1.105.03-1994) THAN THE POINTER ADJUSTMENT SEQUENCE IN FIGURE 5 OF ANSI

T1.105.03-1994. DURING TRANSIENT EVENTS (WHICH SHALL OCCUR NO MORE THAN 2

TIMES PER DAY), THE PATTERN OF STS POINTER ADJUSTMENTS, SDN TO SDN (END-TO-

END THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE FOUR OR LESS

PER HOUR. ADDITIONALLY, THE MAXIMUM TIME INTERVAL ERROR (MTIE) OVER A PERIOD

OF S SECONDS, OR WANDER, SHALL NOT EXCEED (.01S + 10000) NANOSECONDS FOR

VALUES OF S GREATER THAN 10,000.

B. WAVELENGTH TRANSMISSION SERVICES: WAVELENGTH TRANSMISSION SERVICES

FOR RATES OF 10GBPS SHALL BE IN ACCORDANCE WITH ITU-T RECOMMENDATIONS

G.709(03/2003), G.707(12/03), G.957(03/06), G.692(10/98) & TELCORDIA GR253-IE4. THE

PROVIDED WAVELENGTH TRANSMISSION SERVICE SHALL NOT INHIBIT GOVERNMENT

OPERATION OF UNDERLYING PROTOCOLS AND TRANSPORT SYSTEMS SUCH AS, BUT NOT

LIMITED TO, SONET/SDH, IP, ATM, GIGABIT ETHERNET, AND ENCRYPTION. THE

WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL PASS ALL PAYLOAD, PATH, AND

LINE OVERHEAD BYTES TRANSPARENTLY (UNTOUCHED/UNALTERED) AND WITHOUT

MONITORING SDP TO SDP. THERE SHALL NOT BE ANY LINE TERMINATING EQUIPMENT

(LTE) BETWEEN SDP AND SDP.

C. SINGLE MODE FIBER MUST BE TERMINATED TO THE LINE SIDE OF THE FIBER

TERMINATING PATCH PANEL INSTALLED AT BOTH DISA IE1 PROVIDED SERVICE DELIVERY

NODE LOCATIONS.

D. THE TELECOM PROVIDER MUST CONTACT DISA GOC TIER-II ENGINEERING UPON

RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND ACTIVATION PROCESS.

PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB TEAM PHONE:

(C) 618-418-9813, (D) 418-9813 EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-

INTEGRATION-LEAS E-BB-T@MAIL.MIL ALT POC: ORGANIZATIONAL NUMBER (CASA RF

CIRCUIT ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL:

DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL

ONCE TELECOM PROVIDER HAS COMPLETED INSIDE WIRING FROM THEIR FIBER

DISTRIBUTION PANEL INSTALLED IN THEIR DWDM EQUIPMENT SUITE TO THE

GOVERNMENT SERVICE DELIVERY POINT (SDP) AT EACH LOCATION, THEY MUST ENSURE

THE LIGHT LEVEL READINGS (DB LOSS) ARE ADJUSTED TO READ +0.5 TO -7 LOSS.

ADDITIONALLY, THESE LEVELS MUST BE DOCUMENTED ON THE NOTICE OF COMPLETION

(NOC) SENT TO DITCO.

***THE VENDOR MUST TERMINATE SINGLE MODE FIBER AT BOTH LOCATIONS IAW UNIQUE

INSTALLATION FACTORS.***

THE SINGLE MODE FIBER MUST PASS A DOCUMENTED SATISFACTORY 72 HOUR END TO

END TEST IAW ITU STANDARD M.2101 PRIOR TO TURN-UP TO THE GOVERNMENT.

1. VENDOR MUST MEET SVC DATE.

2. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: SINGLE-MODE INTERFACE REQUIREMENT/INTERFACE DATA

RATE: LINE CODING, FRAME FORMAT, PHYSICAL CONNECTOR, 10 GBPS, NRZ,

SCRAMBLED PER ANSI T1.104-1991 (R2003). ALL OPTIONS DEFINED SC CONNECTOR,

SINGLE-MODE FIBER PER ANSI T1.105.06-2002 (SR-0, SR-1, IR-1, IR-2, LR-1, LR-2, LR-3).

(B) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY,

SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.

(C) ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIR ONCE TROUBLE-

CALL HAS BEEN REPORTED.

(D) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO

CIRCUIT.

(E) SINGLE MODE FIBER TERMINATIONS "SC" CONNECTORS.

(F) NO NETWORK INTERFACE UNIT.

(G) DEDICATED PATH.

(H) CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT

OUTAGES.

(I) THE VENDOR MUST CONDUCT A 72 HOUR SATISFACTORY END TO END TEST ON THE

10GB WAVE SERVICE IAW ITU STANDARD M.2101. ADDITIONALLY, THE VENDOR TEST

SET/SETS MUST HAVE THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS

MUST BE EMAILED TO THE ACCEPTING AUTHORITY FOR REVIEW.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL CENTER.

(K) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY

THE DGOC: PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB

TEAM PHONE: (C) 618-418-9813, (D) 418-9813 EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-

INFRASTRUCTURE-INTEGRATION-LEAS E-BB-T@MAIL.MIL ALT POC: ORGANIZATIONAL

NUMBER (CASA RF CIRCUIT ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL:

DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL

(L) THE VENDOR MUST PROVIDE THE LONG HAUL CIRCUIT NUMBER AND THE 1-800

TROUBLE REPORT NUMBER TO THE ACCEPTING AUTHORITY PRIOR TO THE

GOVERNMENT ACCEPTING SERVICE. INSIDE WIRING MUST BE COMPLETED AND TESTED

PROPERLY IAW THE ORDER PRIOR TO TURN-UP TO THE GOVERNMENT. S. REMARKS

CONTINUED:

VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE

FIBER IAW UNIQUE INSTALLATION FACTORS.

INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS.

VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO

REQUIRING ACCESS TO FACILITIES AT BOTH USER LOCATIONS.

FOR UNSATISFACTORY SERVICE OR TO REPORT EQUIPMENT AND/OR CIRCUIT

PROBLEMS INVOLVING DISA PROVIDED TRANSPORT AND/OR EQUIPMENT, PLEASE

CONTACT THE DISN CUSTOMER CONTACT CENTER (DCCC) SCOTT AFB, IL. TOLL FREE: 1-

855-868-9500, COML: 618-418-9500, DSN: 312-418-9500.

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:

10GB. LINE CODE: NRZ. FRAME FORMAT: SCRAMBLED IAW ANSI T1.104-1991 (R2003).

1. TEST AND ACCEPTANCE: FIBER OPTIC 10GB WAVE CIRCUITS SHALL PASS A FULLY

DOCUMENTED SATISFACTORY SOAK TEST BY THE GOC AT SCOTT AFB, IL. PRIMARY: (C)

618-418-8691, (D) 418-8691.

2. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL MEET THE FOLLOWING

PERFORMANCE REQUIREMENTS ON A MONTHLY BASIS. PERFORMANCE

REQUIREMENT/PERFORMANCE SPECIFICATION: NON-DIVERSE/NON-PROTECTED

AVAILABILITY: GREATER THAN OR EQUAL TO 99.5% OR BETTER. MONTHLY SHORT

INTERRUPTION EVENT COUNT (SEIC): LESS THAN OR EQUAL TO 9%. ERRORED SECONDS

(ES): LESS THAN OR EQUAL TO 0.005%. SEVERELY ERRORED SECONDS (SES): LESS THAN

OR EQUAL TO 0.00035. BACKGROUND BLOCK ERROR RATIO (BBER): LESS THAN OR EQUAL

TO 5 X 10-6. BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP): LESS THAN OR EQUAL

TO 1 PER 72 HOURS. JITTER: SEE NOTE 1 (JITTER). BER: LESS THAN OR EQUAL TO 1X10-

12. DELAY (ONE WAY): * LESSER OF 10 MSEC OR (0.01 X D MSEC) *WHERE "D" IS THE SDP-

TO-SDP TRANSMISSION DISTANCE, MEASURED SHORTEST GREAT CIRCLE, IN

KILOMETERS. NEXT ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL

BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT

(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD

SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE

GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE

RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE

CONTRACTOR’S PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

mailto:DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL

File details come from the government source that posted it. Updated .