QA05SEP2024.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- QA05SEP2024
About this file
This document appears to be a set of questions and answers related to a federal contract opportunity for M870A4 Semitrailer, Lowbed, Construction Equipment Transporter (SLCET) 40-Ton. The key details are:
The contract contains various Contract Line Item Numbers (CLINs) related to corrosion inhibitor requirements, with the applicable contract sections referenced. CLINs 0091 to 0097 cover corrosion inhibitor for all trailers produced, while CLINs 0231 to 0237 cover an adder for OCONUS shipment of the trailers. The first article test (FPVI) and first article test (FAT) are required within 300 days of contract award, with the FAT duration estimated at 180 days (360 days maximum). The contract has six ordering periods over a total of 2,920 days (approximately 8 years).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Government Response |
| Ref CLINS 0091 to 0097, Corrosion Inhibitor. |
Each corrosion inhibitor CLIN references IAW with contract sections E.5.4, E.5.6, E.5.7, E.5.8, E.5.9.3.3, E.5.9.4, and E.5.9.4.1.
All of these contract sections are CARC paint-related.
What contract paragraph applies to the corrosion inhibitor?
| What is the difference between CLINS 0091 to 0097, Corrosion Inhibitor, and CLINS 0231 to 0237, CPC OCONUS Shipment? | Question: What contract paragraph applies to the corrosion inhibitor? Answer: E.5.10, E.5.10.1, E.5.10.2, E.5.10.3, E.5.10.4, E.5.10.5, E.5.10.6, E.5.10.7. Question: What is the difference between CLINS 0091 to 0097, Corrosion Inhibitor, and CLINS 0231 to 0237, CPC OCONUS Shipment? Answer: CLINs 0231 to 0237 is an adder that applies to trailers post production, inspection and acceptance that are being shipped OCONUS only and applies to corrosion inhibitor requirements. CLINs 0091 to 0097 apply to ALL trailers produced during the life of the contract and apply to CARC paint requirements. | |
| What’s the timeline for production? | Deliver 5 trailers = (1) FPVI and (4) FAT (No later than 300 days after contract award) |
FAT duration estimated to be 180 days (360 days max).
See Section B B.2 Ordering Periods:
The following definitions apply to the entire contract:
B.2.1 First ordering period of the contract is the date of award plus 364 days (365 days in the case of a leap year).
B.2.2 Ordering Period 1 of the contract is 365 days through 729 days after contract award.
B.2.3 Ordering Period 2 of the contract is 730 days through 1,094 days after contract award.
B.2.4 Ordering Period 3 of the contract is 1,095 days through 1,460 days after contract award.
B.2.5 Ordering Period 4 of the contract is 1,461 days through 1,825 days after contract award.
B.2.6 Ordering Period 5 of the contract is 1,826 days through 2,190 days after contract award.
B.2.7 Unexercised Option Period 1 If exercised, the sixth ordering period of the contract is 2,191 days through 2,555 days after contract award.
B.2.8 Unexercised Option Period 2 If exercised, the seventh ordering period of the contract is 2,556 days through 2,920 days after contract award.
File details come from the government source that posted it. Updated .