This document is a Questions & Answers (Q&A) file for Project 24-2529, involving the Swanson Pickle Lift Station and Force Main, issued by Muskegon County. The Q&A addresses a specific inquiry regarding the force main project, focusing on fiber relocation and underground communication line clearances. The document provides detailed answers about the existing fiber relocation, which will be moved 30 feet south of the right-of-way centerline from approximately Station 61+00 to Station 91+00, covering a distance of 3,000 feet.

The Q&A specifies technical requirements for the force main construction, mandating that it must be constructed within 0.5 feet of the proposed alignment as indicated on the project drawings. Additionally, the document emphasizes that existing underground communication lines must not be in direct contact with the proposed force main. The Q&A is dated 04/16/2024 and references Addendum #1, indicating that the information is part of an ongoing bid or contract process for the wastewater infrastructure project supporting agribusiness in southeast Muskegon and the City of Coopersville.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers - 1

Project 24-2529 - Swanson Pickle Lift Station and Force Main

Buying Organization Muskegon County

No Question/Answer Question Date

Q1 Question: Force Main

What are the station locations and the total length of the fiber relocation? What is the minimum allowable clearance between the proposed force main and the UG communication lines?

Answer: Answer also contained in Addendum #1.

A1 As indicated on the Drawings, the existing fiber will be relocated by others to 30' south of right-of-way centerline from approximately Sta. 61+00 to Sta. 91+00 (3,000 ft).

A2 The force main must be constructed to within 0.5 ft of the proposed alignment as indicated on the

Drawings. Existing underground communication lines must not be in contact with the proposed force main.

04/16/2024