About this file
This document is a schedule of items for a federal construction contract opportunity issued by the Department of Agriculture Forest Service. The solicitation seeks bids to reconstruct a boat ramp and related facilities at the Cinnabar Boat Ramp located in the Custer Gallatin National Forest in Montana. Services required include site clearing, excavation, installation of geosynthetics, placement of riprap and aggregate base, equipment rental if needed, temporary traffic control, and relocation of an existing toilet facility. Optional bid items include expansion of a parking lot with aggregate surfacing and construction of a reinforced concrete boat ramp. Bidders must provide unit pricing for each item and the total fixed price for the project. Award will be made to the responsible bidder offering the lowest price meeting specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q0092 Att. 005 - Maps and Drawings.pdf | ||
| Q0092 Att. 003 - Forest Service Supplemental Specifications.pdf | ||
| Q0092 Att. 002 - Statement of Work.pdf | ||
| 1282B123Q0092 Solicitation.pdf | ||
| Q0092 Att. 004 - Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI – CinnabarBoatRamp Project
SECTION B - SERVICES AND PRICES
Disaster Relief Cinnabar Boat Ramp
CUSTER GALLATIN NATIONAL FOREST
GARDINER RANGER DISTRICT
PARK COUNTY, MONTANA
Boat Ramp
Item Number Description Method of
Measurement Pay Unit
Estimated Quantity Unit Price Total
15101 Mobilization LSQ LS ALL $ $
15713 Soil erosion and pollution control LSQ
LS ALL $ $
20101
Clearing and Grubbing, Disposal Method Tops and Limbs Method k, Stumps Method f, Logs Method i. LSQ
LS ALL $ $
20401* Excavation, Removal Method A CQ Cubic Yard 770 $ $
20414* Disposal of Excess Material CQ Cubic Yard 650 $ $
20701* Geosynthetics, type Geotextile Class 1 CQ Square
Yard 290 $ $
25101* Placed Rip Rap, Class 5 CQ Cubic
Yard 305 $ $
30201* Aggregate base, Compaction FSSS
204.11 Method 2 CQ Cubic
Yard 30 $ $
62201 Equipment Rental (if needed) EA HR 16 $ $
63502 Temporary Traffic Control LSQ LS ALL $ $
TOTAL $
Toilet Relocation
Item Number Description Pay
Unit Estimated Quantity Unit Price Total
20804 Structure Excavation - Move Toilet LSQ LS ALL $ $
TOTAL
SOI – CinnabarBoatRamp Project
Option Item 1 – Parking Lot Expansion – 4” Aggregate Surfacing
Item Number Description Method of
Measurement Pay Unit
Estimated Quantity Unit Price Total
20401 Excavation, Removal Method A LSQ Cubic Yard 38
20414 Disposal of Excess Material LSQ Cubic Yard 38
60102* Aggregate base, Compaction FSSS
204.11 Method 2 CQ CY 38
Option Item 2 – Concrete Boat Ramp
Item Number Description Pay
Unit Estimated Quantity Unit Price Total
60102* Concrete Ramp, reinforced, 6" thickness, boat ramp CQ CY 17
TOTAL CINNABAR RAMP Project
Note: Items marked with an (*) indicate contract quantity.
Basis of Award - The bidder must bid on all items. Only bids to the nearest cent will be accepted.
The Contracting Officer reserves the right to request a further breakdown of the above if needed in order to make a fair and reasonable determination for contract award.
File details come from the government source that posted it. Updated .