Scope Sheet
| EXHIBIT LINE ITEM NUMBERS (ELINs) | |
| CONTRACT: | PUMP AND MOTOR CONTINGENCY (PACKAGE 1) |
| CONTRACT NO: | |
| CONTRACTOR: | |
| SHIP: | USS DECATUR (DDG-73) |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-5344 | 4-220-0-E, NR-3 SEAWATER COOLING PUMP (PUMP ONLY) | 1 | | |
| ELIN 0001 | | | |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO DISCONNECT AND REMOVE THE EXISTING NR-3 SEAWATER COOLING PUMP FROM THE FOUNDATION AND ASSOCIATED PIPING. AFTER OVERHAUL, INSTALL THE PUMP ONTO THE FOUNDATION AND CONNECT ASSOCIATED PIPING. RECORD, RETAIN, AND REUSE EXISTING PIPING AND PUMP FOUNDATION FASTENERS.
**SEE NOTES 2 AND 3** 1 $0.00 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-5344 | 4-220-0-E, NR-3 SEAWATER COOLING PUMP (PUMP ONLY) | 1 | | |
| | ELIN 0002 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR-3 SEAWATER COOLING PUMP IN ACCORDANCE WITH TECH MANUAL S6226-DN-MMA-010 TO INCLUDE FEARINGS, CASE AND BEARING RINGS, SEALS, GASKETS, O-RINGS, MECHANICAL SEAL, SHAFT SLEEVES, LOCKNUTS AND LOCKWASHERS. | 1 | $0.00 | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-5344 | 4-220-0-E, NR-3 SEAWATER COOLING PUMP (PUMP ONLY) | 1 | | |
| | ELIN 0003 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD), CRANE SUPPORT, AND TRANSPORTATION OF THE NR-3 SEAWATER COOLING PUMP FROM THE FOUNDATION TO SHOP FOR OVERHAUL, AND BACK ONTO THE FOUNDATION AFTER REPAIR | 1 | $0.00 | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-5344 | 4-220-0-E, NR-3 SEAWATER COOLING PUMP (PUMP ONLY) | 1 | | |
| | ELIN 0004 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE ALIGNMENT AND ADJUSTMENTS OF THE OVERHAULED NR-3 SEAWATER COOLING PUMP. PROCURE NEW DOWEL PINS AND INSTALL AFTER COMPLETION OF ALIGNMENT AND ADJUSTMENTS PROCEDURE. | 1 | $0.00 | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-5344 | 4-220-0-E, NR-3 SEAWATER COOLING PUMP (PUMP ONLY) | 1 | | |
| | ELIN 0005 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHIPBOARD OPERATIONAL TESTING OF THE OVERHAULED NR-3 SEAWATER COOLING PUMP, BALANCED MAGNETIC COUPLING, AND NR-3 SEAWATER COOLING PUMP MOTOR. | 1 | $0.00 | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-5344 | 4-220-0-E, NR-3 SEAWATER COOLING PUMP (PUMP ONLY) | 1 | | |
| | ELIN 0006 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO DRAIN AND DISPOSE ANY LIQUID IN SUPPORT OF THE OVERHAUL OF THE NR-3 SEAWATER COOLING PUMP | 1 | $0.00 | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EA01-5344 | 4-220-0-E, NR-3 SEAWATER COOLING PUMP (PUMP ONLY) | 1 | | |
| ELIN 0007 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF NEW AND DISTURBED SURFACE | 1 | $0.00 | $0.00 |
TOTAL $0.00
| Milestone Events | |
| Purchase Order Start Date: | 08 NOVEMBER 2021 |
| Remove and Transport to Shop | 08 NOVEMBER TO 15 NOVEMBER 2021 |
| Repair and shop test | 16 NOVEMBER TO 06 DECEMBER 2021 |
| Install and OPTEST Pump: | 07 to 10 DECEMBER 2021 |
| Purchase Order End Date: | 10 DECEMBER 2021 |
| NOTES: |
| 1. Refer to Technical Manual S6226-DN-MMA-010 for detailed procedures on the overhaul, testing, adjustments, and operational testing. |
| 2. The Contractor shall remove and off load the Nr-3 Sea Water Cooling Pump no later than 15 November 2021. |
| 3. The Contractor shall procure and install new Pipe Gaskets and associated PUMP Unit Fasteners and Seals. |
| 4. The Contractor shall use the existing coupling from the old Pump & Motor Unit as part of the installation and testing |
Over and Above
| | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order. | ESTIMATED AMOUNT | UNIT OF ISSUE | FBLR for ELIN 0008. MATERIAL HANDLING RATE FOR ELIN 0009 | TOTAL |
| ELIN 0008 | ADDITIONAL WORK - LABOR | | | | |
| NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 100 | HR | $0.00 | | | |
| ELIN 0009 | ADDITIONAL WORK - MATERIALS | | | | |
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. | 30,000.00 | DOLLARS, US | 0% | | | |