Q & A.pdf

PDF 59 KB Posted

Attached to
PMAA, SWRS, Coller SWA Rio Grand SWA Woods Lake SWA Toilets
Solicitation number
DQ1 PMAA 2016001117 3
Issued by
Rio Grande County, Denver City, Colorado

About this file

This is a Questions and Answers document related to a 2016 vault toilet construction project in the Southwest Region of Colorado. The document addresses two primary inquiries submitted by bidders following the pre-bid conference. The project involves the installation of multiple vault toilets at PMAA, SWRS, Coller SWA, Rio Grand SWA, and Woods Lake SWA locations, with each facility requiring a wheelchair-accessible parking space and pathway to the toilet structure.

The document clarifies that 63 cubic yards of roadbase material will be allocated for constructing wheelchair-accessible parking spaces and paths from those spaces to each toilet facility, with exact locations to be determined in the field by the project manager and compensated under Item 7 of the Bid Schedule. Regarding testing requirements, the contractor is responsible for ensuring adequate foundation conditions to support the vault, building, and associated loads, though formal soils testing is not required. The toilet manufacturer will conduct all necessary concrete testing. The response was provided by Peggy Silcox on March 23, 2016, indicating this information was distributed prior to bid submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers –2016 Vault Toilets – SW Region

No questions were asked during the pre-bid conference.

Other questions received:

1. Where does the 63 CY of roadbase go?

Each vault will have a wheelchair accessible parking space and a path from the space to the toilet as shown on sheet 5 in the drawings. The exact locations will be determined in the field by the project manager and paid under Item 7 in the Bid Schedule.

2. Is concrete or geotechnical testing required?

Concrete testing will be done by the toilet manufacturer. Soils testing will not be required but the contractor will be responsible for being sure that the foundation is adequate for the load of the vault, building and other expected loads.

Peggy Silcox

23 March 2016