Q_A_1_-_SRINGER_SPRING_CHIPPING_PROJECT_responses_1_9_24_final.docx

DOCX document 16 KB Posted

Attached to
SPRINGER SPRING CHIPPING Federal contract opportunity
Solicitation number
140L3924Q0103
Issued by
Department of the Interior Bureau of Land Management Nevada Region

About this file

This document is a set of questions and answers related to the SPRINGER SPRING CHIPPING PROJECT solicitation, Solicitation # 140L3924Q0103. The solicitation is for chipping services issued by the Department of the Interior Bureau of Land Management Nevada Region. Key details include:

The project area has defined GPS coordinates for the south and north ends. A site visit is not planned. The work is for chipping only, not mastication. Stumps with rocks or dirt should be cut off and left on site if flush with the ground (up to 6 inches above). Incoming equipment must be washed and free of noxious and invasive weeds. No other specific details about the required products/services, response dates, pricing, or set-asides are provided in this Q&A document.

View the file

Other files for this federal contract opportunity

Other files attached to SPRINGER SPRING CHIPPING, newest first.
File Type Posted
Q_A_2.docx DOCX document
A04_Springer_Spring_Chipping_SOW.pdf PDF
Sol_140L3924Q0103.pdf PDF
B03_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SRINGER SPRING CHIPPING PROJECT

RFQ SOLICITATION # 140L3924Q0008

QUESTIONS & ANSWER

1. Do you have any geo-referenced maps or shape files for the above-named project? If you do could you please send them to me?

A1 – See maps on pages 6-7 of the Statement of Work.

2. Is a site visit planned? If not, are there GPS Coordinates for the location start to finish?

A2 – No site visit for this project. GPS coordinates are as follows:

Here are coordinates for the south end and north end of the project.

Datum: NAD83, UTM south end: 643581, 4170589 north end: 647068, 4175934

3. Can you provide GPS coordinates for the beginning and end of the project?

A3 - Here are coordinates for the south end and north end of the project.

Datum: NAD83, UTM south end: 643581, 4170589 north end: 647068, 4175934

4. I wanted to reach out and find out if this project was for chipping only or if you would accept mastication? If you would allow mastication what would the equipment weight limit be?

A4 – Chipping only due to resource constraints.

5. Stumps have rocks dirt in them. Can these be cut off and left on site or hauled away instead of trying to chip these?

A5 – Stumps that have been torn out of the ground should be chipped and/or removed. Stumps in situ can be cut off and left on site as long as they are flush with ground level (up to 6” above ground level). Treatment of stumps should be built into the contractor’s proposal.

Incoming equipment should be washed and free of noxious and invasive weeds prior to project work.