STATEMENT OF Requirement Jetpack Sorties Single Year.docx

DOCX document 17 KB Posted

Attached to
Jetpack Sorties Single-Year Purchase Order
Solicitation number
PZZDTPS250612
Issued by

About this file

This is a Statement of Requirement and associated Federal Contract Opportunity for Jetpack Sorties for the US Air Force Test Pilot School (TPS). The requirement seeks a vendor to provide 125 individual pilot flights per year, including classroom instruction, jet suit flights (2-3 per person), and comprehensive support services such as pre-flight training, instructors, ground safety staff, and required briefings. The solicitation (PZZDTPS250612) is a full and open competition under the North American Industry Classification System (NAICS) code 611512 "Flight Training" with a size standard of $34,000,000.

The procurement is structured as a Request for Quote (RFQ) with a Lowest Price Technically Acceptable (LTPA) evaluation method. The period of performance is 12 months, with an estimated award date of 30 June 2025 and quotes due by 26 June 2025 at 4:00 PM PDT. Vendors must submit quotes via email to Cole Staron and Brianna Vicsotka, including specific contractor information such as SAM UEI, TIN Number, CAGE Code, and other required documentation. The government intends to award without discussions, expecting vendors to submit their best terms initially.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF Requirement US Air Force Test Pilot School (TPS) Jetpack Sorties Current as of 10 June 2025

1. SCOPE:

The government requires flights in the support of the staff of student qualitive evaluation flights.

2. REQUIREMENT:

· Technology Requirements

· The requirement will include 125 flights (individual pilot uses) per year. Each person flying will receive classroom instruction and several flights (2-3) in the jet suit.

3. SPECIFICATIONS:

· The vendor shall provide and instruct all Test Pilot School students and staff on the safe operations and use of the jet pack equipment.

· Additional support will include the following:

· Jet Pack Flights

· Fuel

· Pre-Flight Training

· Instructors

· Ground safety Staff

· Required briefings

4. Period of Performance: This requirement will be one year long. If the anticipated vendor can meet the requirements, then a potential contractual opportunity will become available.

File details come from the government source that posted it. Updated .