PX Facility Descriptions.pdf

PDF 138 KB Posted

Attached to
Release of Y-12/PX Pre-Proposal Info from Site Visits Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Energy

About this file

This document provides facility descriptions for Pantex Plant zones and a related special notice for a federal contract opportunity. The Pantex Plant zones described include Zone 12 South, which contains bays, cells, and staging facilities used for nuclear weapon assembly, disassembly, and special operations. Zone 4 MAA staging facilities temporarily store nuclear explosives and components in magazines constructed from the 1940s to 1990s, which will be replaced. Zone 11 facilities contain analytical laboratories and testing capabilities for explosives as well as facilities for component requalification and additive manufacturing with an average age of 58 years. The High Explosive Pressing Facility is a new two-story facility operational since 2012 to replace outdated facilities. The John C. Drummond Center is a modern 343,000 square foot facility housing over 1,100 employees in offices, meeting spaces, and amenities while eliminating $20 million in deferred maintenance costs. The related special notice provides pre-proposal information from September 2020 site visits to the Y-12 National Security Complex and Pantex Plant regarding the management and operating contract opportunity for the two sites.

View the file

Other files for this federal contract opportunity

Other files attached to Release of Y-12/PX Pre-Proposal Info from Site Visits, newest first.
File Type Posted
Y-12_PX SB Goals FY14-21.xlsx XLSX spreadsheet
Y-12 Facility Descriptions.pdf PDF
Y-12_PX Site Visit Attendee List.xlsx XLSX spreadsheet
Y-12_PX Public Site Brief.pptx PPTX presentation

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pantex Facility Descriptions

Zone 12 South consists of Bays, Cells, Staging facilities. Bays are used primarily for the assembly and disassembly of assigned nuclear weapons, assembly and disassembly of joint test assemblies, as well as Special Purpose operations. Special purpose bay operations include radiography, vacuum and leak check, mass properties, painting, and reacceptance activities for pits, canned subassemblies and various mechanical components. Cells are used primarily for the assembly and disassembly of the physics package containing main charge sensitive high explosives and pit, but can also be used for assembly and disassembly of an entire weapon. The (building number removed by OPSEC) facility stages strategic reserve pits in an environmentally pristine atmosphere using an automated storage and retrieval system and performed pit surveillance activities. Multiple Staging facilities are also located in Zone 12 South containing explosives, pits, canned subassemblies, as well as electrical, mechanical and support components utilized in the weapon assembly processes.

The Zone 4 MAA staging facilities consist of 42 Steel Arch Construction (SAC) and 18 Modified Richmond (MR) magazines. The MR and SAC magazines were constructed and modified from the 1940s through the 1990s. MR and SAC magazines are used for the temporary storage of Nuclear Explosives (NE), Nuclear-Explosive-Like-Assemblies (NELA), containerized pits, and Canned Subassemblies (CSA). The Zone 4 MAA staging facilities will be replaced with a modern facility to meet current and future requirements for safe, secure storage.

Zone 11 facilities contain analytical laboratory and testing capabilities for the qualification, evaluation and assessment of the explosives utilized in the weapon stockpile. In addition, Zone 11 contains facilities that are used for developing cutting edge technology for SNM component requalification and additive manufacturing. The average age of these facilities is 58 years.

The High Explosive Pressing Facility (HEPF) is a two story, moderate hazard facility at the Pantex Plant. Construction of the HEPF began in 2012 and intended to replace existing 50+ year old facilities that would could not meet the production demand. The HEPF is now operational and meeting the increase production needs required to provide explosive main charge components for the ongoing life extension programs with improved safety, security, quality.

John C. Drummond Center (JCDC) built just south of the Pantex Plant is a 343,000 square feet, state-of-the-art facility providing office space for more than 1,100 federal and contractor employees. Pantex employees chose to name the facility to honor John C. Drummond, who served as plant manager from 1956 to 1974. The three-story building includes a 360-seat auditorium, 500-seat cafeteria, medical clinic, and employee fitness/wellness center. It features more than 50 conference rooms of various sizes, 11 breakrooms with sweeping views, and large windows throughout. The building was developed and built by Lawler-Wood, STG Architects and Turner Construction with more than 2,000 craftspeople working on-site at various times throughout construction. The JCDC enables elimination of approximately $20 million in deferred maintenance by consolidating administrative functions from more than 52 legacy facilities at the Pantex site into one modern, energy-efficient building.

File details come from the government source that posted it. Updated .