PWSFINAL28Apr22.pdf

PDF 328 KB Posted

Attached to
BBU-63 Comparative Analysis Testing Federal contract opportunity
Solicitation number
FA821322R3026
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This performance work statement outlines requirements for a federal contract to provide testing services for BBU-63/B impulse cartridges. The contractor shall conduct closed bomb, universal cartridge test apparatus, and BRU-44 bomb rack tests at their facility. Tests will collect data on pressure, load, force, velocity and other metrics. The contractor must develop test plans and reports, modify the universal cartridge test apparatus, provide inventory reports for government property, and deliver monthly status reports. Tests will be conducted on cartridges from different manufacturers over a range of propellant weights and temperatures. Deliverables are due through September 2023. The solicitation was issued by the Department of the Air Force Materiel Command Lifecycle Management Center and seeks a contractor to provide the testing services outlined in the performance work statement.

View the file

Other files for this federal contract opportunity

Other files attached to BBU-63 Comparative Analysis Testing, newest first.
File Type Posted
FA821322R3026 Amendment 0002.pdf PDF
FA821322R3026 Amendment 0001.pdf PDF
FA821322R3026 Solicitation.pdf PDF
FA821322R3026.pdf PDF
CDRLs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

CUI 1

Performance Work Statement for BBU- 63/B Comparative Analysis Testing

Controlled by: USAF Controlled by: EBHCC CUI Category: CTI Distribution Statement: D POC: Lauren Buckner, 801-586-8737

Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only due to critical technical information as of 10 December 2020. Other requests for this document shall be referred to AFLCMC/EBHCC, 6033 Elm Lane, Hill Air Force Base, UT 84056.

WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25.

CUI 2

0 Contents Part 1: General Information

1.1 Introduction:

1.2 Description of services

1.3 Background

1.4 Scope

1.5 Period of Performance

1.6 General Information

1.6.1 Post-Award Conference or Periodic Progress Meetings

1.6.2 COR/DCMA

1.6.3 Contract Manager

1.6.4 Identification of Contractor Employees ........................................ Error! Bookmark not defined.

Part 2: Government-furnished Equipment and Materials

2.1 General

2.2 Equipment

2.3 Materials

Part 3: Contractor-furnished items and services

3.1 General

Part 4: Specific tasks

4.1 General

4.2 Test Specification Summary

4.2.1 Closed Bomb Test

4.2.2 Universal Cart Test Apparatus

4.2.3 Bomb Ejection Rack

4.3 Test Requirement Summary

4.3.1 Closed Bomb Test

4.3.2 Universal Cart Test Apparatus

4.3.3 FAT using the BBU-44 Bomb Rack

Part 5: Quality Assurance

5.1 Quality Control (QC)

5.1.1 Quality Control Plan (QCP)

5.2 Government Inspection

5.2.1 Non-Conformances

CUI 3

5.2.1.1 Minor Non-Conformance

5.2.2.2 Major Non-Conformance

5.2.2 Non-Conformance Notification

5.2.2.1 First Notice

5.2.2.2 Customer Complaint Record (CCR)

5.2.2.3 Corrective Action Report (CAR)

5.2.3 Government Remedies

5.2.4 Contractor Performance Assessment Reporting System (CPARS) Applicability

5.3 Services Summary

Part 6: Applicable Documents

6.1 General

6.1.1 SP9927150

6.1.2 99271400A

6.1.3 841AS700FT

Part 7: Deliverables

7.1 General

7.2 Data Rights

Part 9: Tables and Figures

Table 1 Test Requirement Summary Table

Table 2 BBU-63/B First Article Test Baseline

Table 3 Deliverables

Figure 1: Modified First Article Test Distribution for Closed Bomb and Universal Cartridge Test Apparatus

Figure 2: Modified First Article Test Distribution for BRU Bomb Rack

Part 10: Definitions and acronyms

CUI 4

Part 1: General Information

1.1 Introduction: The Air Force Life Cycle Management Center (AFLCMC) Munitions Division Components Branch (AFLCMC/EBHCC) is seeking to gather data by contracting for engineering services, specifically test support.

1.2 Description of services: The contractor shall provide all personnel, equipment, tools, materials, supervision, other items, and non-personal services necessary to perform testing of the BBU-63/B impulse cartridge as defined in this PWS except as specified in Part 2 as government-furnished property and services. The contractor shall perform to the standards in this contract. Deliverables are listed in Table 3 and include modified Universal Cartridge Test Apparatus (UCTA) drawings (DI-SESS-81008F), monthly status reports (DI-MGMT-81928), BRU-44 Bomb Rack Randomized Firing Table, BRU-44 Bomb Rack First Article Test (FAT) plan (DI-NDTI-80566A) and report (DI-MISC-80508B), UCTA test plan (DI- NDTI-80566A) and report (DI-MISC-80508B), closed bomb test plan (DI-NDTI-80566A) and report (DI- MISC-80508B) and a Measurement System Evaluation (MSE) (DI-QCIC-81960).

1.3 Background: The BBU-63/B is an electrically fired cartridge used to eject stores from the BRU-44 bomb rack. The FAT procedures currently utilize the BRU-44 bomb rack. Due to the large logistical burden and costs associated with using the BRU-44 bomb rack for FATs, the Air Force Countermeasures SPO would prefer the use of either a Closed Bomb Test or the UCTA for the FAT.

1.4 Scope: The contractor shall provide testing services. Services include: conducting a closed bomb test, a UCTA test, and a FAT with BBU-63/B impulse cartridges to collect data. The FAT method shall be conducted according to the current FAT instructions using the BRU-44 Bomb Rack. The Contractor shall perform their duties at their own facility and transmit data at the appropriate security levels using approved DoD communications methodologies (I.E.NIPRNET/SIPRNET/JWICS as appropriate).

This Performance Work Statement (PWS) outlines the requirements for vendors in conducting the tests needed to determine performance correlation between the Closed Bomb Test, the UCTA, and the FAT.

1.5 Period of Performance: The period of performance is 18 months after contract award.

1.6 General Information

1.6.1 Post-Award Conference or Periodic Progress Meetings: The contractor agrees to attend a post-award conference convened by the contracting activity or contract administration office in accordance with FAR 42.5. The Contracting Officer (CO), contracting officer’s representative (COR) or a Defense Contract Management Agency (DCMA) representative, and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings, the CO will apprise the contractor of how the government views the contractor’s performance, and the contractor will apprise the government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. The contractor shall provide meeting minutes upon completion (DI-ADMIN-81505).

1.6.2 COR/DCMA: The COR/DCMA monitors all technical aspects of the contract and assists in contract administration. The COR/DCMA is authorized to perform the following functions: assure the contractor performs the technical requirements of the contract; perform inspections necessary in connection with

CUI 5

contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including government drawings, designs, and specifications; monitor contractor’s performance and notify both the CO and contractor of any deficiencies; coordinate availability of government-furnished property; and provide site-entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR/DCMA is not authorized to change any of the terms and conditions of the resulting order.

1.6.3 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

Part 2: Government-furnished Equipment and Materials

2.1 General: The government shall provide the equipment and materials listed below. The contractor shall record the government furnished property according to DI-MGMT-80441D and DFARS clauses. The contractor shall record receipt and inventory of the government furnished material according to DI- PSSS-80727A and DFARS clauses.

2.2 Equipment: The government will provide BRU-44 bomb racks for the bomb rack testing. The bomb racks will be provided to the contractor’s facility. Throughout testing, maintenance will be performed on the bomb racks by Government personnel. At the conclusion of the testing, the bomb racks will be returned in the same condition, barring normal wear and tear, to Whiteman Air Force Base.

Equipment will be tracked and controlled by the USG utilizing appropriate systems or forms (e.g. AF 1297) and according to DI-MGMT-80441D. Shipping will be provided by the USG for government furnish equipment and material.

2.3 Materials: The government will provide the 780 BBU-63/B cartridges required to be tested. In addition, 84 cartridges will be provided as spares. Contractor will comply with Explosive safety Protocols

IAW DESR6055.09_AFMAN 91-201.

Part 3: Contractor-furnished items and services

3.1 General: Except for those items specifically stated to be government-furnished in Part 2, the contractor shall furnish everything required to perform this PWS. This includes but is not limited to: the facilities, closed bomb test apparatus, and UCTA.

Part 4: Specific tasks

4.1 General: The tests included below shall be performed on the designated number of units shown in Table 1 for each of the manufacturers, propellant weights, and environmental conditions. Table 2 represents cartridges that will be conditioned according to SP9927150 Rev D Table II Test T3, T4, and T5.

CUI 6

4.2 Test Specification Summary

4.2.1 Closed Bomb Test: A test plan shall be written to the standards of DI-NDTI-80566A and delivered to the government per Table 3. The closed bomb test is a fixed volume pressure vessel with a volume of 322 cc where the BBU-63/B cartridge is placed. The BBU-63/B is functioned within the pressure vessel while instrumentation gathers data described in paragraph 4.3.1. The pressure is safely vented before the cartridge is removed and the test repeated.

The cartridges for this test will be conditioned differently according to Tables 1 and 2 located in Part 9.

Table 1 will have temperature conditioning only and functioned according to SP9927150 REV D 4.5.2.4.

Table 2 will be conditioned according to Figure 1: Modified First Article Test Distribution for Closed Bomb and Universal Cartridge Test Apparatus. After conditioning according to Figure 1, the cartridges will be further temperature conditioned and functioned according to SP9927150 REV D 4.5.2.4.

All quantities are outlined in Table 1 and the Closed Bomb Test will use Test Bomb-Closed 9927140.

The Closed Bomb Test apparatus shall not be temperature conditioned. Cartridges shall be removed from the conditioning chamber and functioned within 3 minutes. The closed bomb test will have a volume of 322 cc.

4.2.2 Universal Cart Test Apparatus: A test plan shall be written to the standards of DI-NDTI-80566A and delivered to the government per Table 3. The UCTA is a government-owned technical data package (TDP) test fixture that upon cartridge function pushes a 480 lb. store along two horizontal rails. Data collected from this test is described in paragraph 4.3.2.

The UCTA is designed to test the ARD-446 and ARD-863 bomb ejection carts. A new breech for the UCTA shall be designed in such a way as to function the BBU-63/B as intended on the BRU-44 with dual outlets for gasses to release. The breech shall be interchangeable and compatible with existing parts to allow for a single UCTA fixture to be configured to test any of the ARD-446, ARD- 863, or BBU-63/B.

The UCTA for Table 1 will have temperature conditioning only and functioned according to SP9927150

REV D 4.5.2.4.

Table 2 will be conditioned according to Figure 1: Modified First Article Test Distribution for Closed Bomb and Universal Cartridge Test Apparatus. After conditioning according to Figure 1, the cartridges will be further temperature conditioned and functioned according to SP9927150 REV D 4.5.2.4.

The UCTA shall follow the same guidelines as Closed Bomb Test for the temperature conditioning. The UCTA shall not be temperature conditioned, only the cartridges. Cartridges shall be removed from the conditioning chamber and functioned within 3 minutes.

The breech of the UCTA shall be designed in such a way as to function the BBU-63/B as intended on the BRU-44 with dual outlets for gasses to release.

The vendor, upon request, will receive government owned plans of the UCTA for reference.

Any design, drawings, or data related to modifications to the UCTA to accommodate the BBU-63/B shall be government owned and adhere to DI-SESS-80776F.

CUI 7

4.2.3 Bomb Ejection Rack: A test plan shall be written to the standards of DI-NDTI-80566A and delivered to the government per Table 3. The BRU-44 Bomb Ejection Rack is what the aircraft uses to hold stores until ready to be separated with the BBU-63/B cartridges. This test includes an Air Force supplied BRU-44 Bomb Ejection Rack and a weight to simulate the store used. The rack is functioned as designed to separate the store from the rack. Data from paragraph 4.3.3 is collected during the test.

The cartridges for this test will be conditioned differently according to Tables 1 and 2. Table 1 will have temperature conditioning only according to SP9927150 REV D Table I (2,400 lb. store only).

Table 2 will be conditioned according to Figure 2: Modified First Article Test Distribution for BRU-44 Bomb Rack. After conditioning according to Figure 2, the cartridges will be further temperature conditioned according to SP9927150 REV D Table I (2,400 lb. store only) and functioned.

The testing order for the Bomb Rack testing shall be randomized as best as possible. Vendor will submit randomized firing tables to the government for approval with the test plan (DI-NDTI-80566A).

4.3 Test Requirement Summary: Reported results shall include but not be limited to the following:

4.3.1 Closed Bomb Test

• Pressure vs Time data: Closed bomb pressure data plotted against time

• Peak Pressure

• Time to Peak Pressure

• Weight of Cartridge

4.3.2 Universal Cart Test Apparatus

• Peak Breech Pressure

• Time to Peak Pressure

• Peak Load

• Time to Peak Load

• Stroke Length

• Action Time Start

• Action Time Stop

• Action Time

• Action Time Integral

• Action Time Impulse

• Average Pressure

• Average Load

• Velocity at EOS (ft/sec)

• Weight of Cartridge

4.3.3 FAT using the BBU-44 Bomb Rack

• Maximum Forward Ejector Force

• Maximum Forward Ejector Force Time

• Maximum Aft Ejector Force

• Maximum Aft Ejector Force Time

CUI 8

• Maximum Total Ejector Force

• Maximum Total Ejector Force Time

• Forward Start Time

• Forward Stop Time

• Aft Start Time

• Aft Stop Time

• Total Start Time

• Total Stop Time

• End of Stroke Time

• End of Stroke Velocity

• Pitch Rate at End of Stroke

• Forward Displacement at End of Stroke

• Aft Displacement at End of Stroke

• Pitch Angle at End of Stroke

• Forward Impulse

• Time Average Forward Force

• Aft Impulse

• Time Average Aft Force

• Total Impulse

• Time Average Total Force

• Split Forward Time Average Force %

• Split Aft Time Average Force %

• Firing Pin heights

• Weight of Cartridge

Part 5: Quality Assurance

5.1 Quality Control (QC): The contractor shall develop, implement and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which they assure themselves work complies with the requirement of the contract.

5.1.1 Measurement System Evaluation (MSE): The contractor shall provide a MSE that describes the Contractor’s equipment and various measurement systems used to provide the data conforming to this PWS per DI-QCIC-81960. The Contractor shall provide the MSE to the Government NLT 30 days after contract award date.

5.2 Government Inspection: Contractor performance is subject to surveillance by the COR to ensure compliance with this PWS to include all elements of the Service Summary. The PWS identifies two types of non-conformances: minor and major. All records of non-conformance and corrective actions will be documented in Corrective Action Reports (CAR), Quarterly Surveillance Reports and Contract Performance Assessment Ratings (CPAR).

CUI 9

5.2.1 Non-Conformances

The Contractor shall identify and control non-conformances through root cause analysis, corrective actions and preventive actions. The Contractor shall focus on proactive identification and transparency of issues, and on eliminating the cause to prevent reoccurrences. The Contractor shall maintain records of non-conformities and actions taken.

The Contractor shall correct and provide response to all Government-identified non-conformances IAW timeframes specified by the CO.

5.2.1.1 Minor Non-Conformance

A Minor Non-conformance is a non-conformance, which by itself may not adversely impact mission, safety of personnel and/or equipment, performance (quality), schedule (delivery), or cost. A Minor Non-conformance normally does not increase risk to the Government.

5.2.2.2 Major Non-Conformance

A Major Non-conformance is a non-conformance that adversely impacts (or has the reasonable potential to impact) mission, safety of personnel and/or equipment, performance (quality), schedule (delivery), or cost. A Major Non-conformance also increases risk to the Government. An example of increasing risk would be significant number of recurring Minor non-conformances, which indicates inadequate preventive measures or corrective actions, thus lowering the Government’s confidence that quality services will be provided on time and at cost.

5.2.2 Non-Conformance Notification

If a non-conformance is found during inspection of the Contractor’s performance, the CO will determine the type of notification based on the category of the non-conformance and pursue non-conformance resolution IAW the contract.

5.2.2.1 First Notice

First Notices provide written notification from the CO to the Contractor of Minor Non-Conformances.

First notices shall include a suspense date for the Contractor’s response. The Contractor shall send the completed first notice response to the CO. If the Contractor fails to respond by the specified due date, the CO will notify the COR to annotate the Contractor’s non-responsiveness. If the Contractor fails to resolve the issue as documented in the notice, the CO may elevate the issue to the next level, and request the COR to complete a Customer Complaint Record (CCR).

5.2.2.2 Customer Complaint Record (CCR)

The CCR provides written notification from the CO to the Contractor of: 1) Minor Non-Conformances not addressed by the Contractor after the CO issued a First Notice, 2) Multiple occurrences of Minor Non- Conformances, or 3) First occurrence of Major Non-Conformances. The CO will issue the CCR to the Contractor with a suspense date for the Contractor’s reply. The Contractor shall send the completed CCR to the CO. If the Contractor fails to respond by the specified due date, the CO will notify the COR to annotate the Contractor’s non-responsiveness. If the Contractor fails to resolve the issue as documented in the notice, the CO may elevate the issue to a Corrective Action Report (CAR).

Corrective/preventive actions initiated and/or completed by the Contractor will be verified by the COR.

CUI 10

5.2.2.3 Corrective Action Report (CAR)

A CAR provides written notification from the Government to the Contractor of significant performance discrepancies. A CAR may be issued when previous notifications of Minor non-conformances failed to result in corrective actions or when a Major Non-conformance exists. CARs shall be issued by the CO to the contractor for their action.

To satisfactorily close-out a CAR, the following criteria must be met;

• the contractor shall meet the suspense date;

• the corrective action must have been found satisfactory by the COR and CO;

• any required updates to the Contractor’s QCP must be made and reviewed by the COR;

• the Contractor’s actions must correct the non-conformance, and if applicable,

• the correction to the non-conformance must be within specified standards.

If the corrective action is deemed unsatisfactory by the COR and CO, the Government reserves the right for further action, up to and including equitable adjustment.

5.2.3 Government Remedies: The CO shall follow Federal Acquisition Requirement (FAR) 52.246-4, “Inspection of Services-Fixed Price” for a contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

5.2.4 Contractor Performance Assessment Reporting System (CPARS) Applicability FAR 42.1502 directs all Federal agencies to collect and report past performance information on services contracts with a value of $1M or more. The CPAR assesses a contractor’s performance and provides a written record on a given contract during a specific period of time. All CPARs are accomplished using the automated Navy Contractor Performance Assessment Reporting System (CPARS) found on the web at <http://www.cpars.gov>. This system requires the contractor to provide a designated representative to receive CPARs.

5.3 Services Summary

Performance

Objective Standard Performance Threshold

SS-1: Provide Deliverables

Contractor provides all reports listed in Table 3 “Deliverables” as described in Paragraph 7.1

Performance is acceptable when all deliverables listed in Table 3 meet the description provided in Part 7.

Part 6: Applicable Documents

6.1 General: Publications applicable to this PWS are listed below.

6.1.1 SP9927150: Specifications of BBU-63/B

CUI 11

6.1.2 99271400A: Specifications for the Closed Bomb Test

6.1.3 841AS700FT: UCTA

Part 7: Deliverables

7.1 General: All reports shall correspond to specific items affected and shall correspond to item specific serial and lot numbers. Individual data points will be collected according to serial and lot numbers. After each test, results will be summarized in such a way to easily determine performance results in each of the required metrics as described in 4.3 and DI-MISC-80508B.

All modifications to the UCTA to accommodate the BBU-63/B shall be summarized with plans delivered to the United States Air Force according to DI-SESS-81008F.

The vendor shall record, report, and summarize all test results, data, observations, and anomalies. A monthly status report will be provided according to DI-MGMT-81928.

The Contractor shall be responsible for delivering all end items specified, unless otherwise directed, by the government. Except where noted, Contractor format is acceptable for this effort as long as all required analysis and data for each test listed under Test Requirements Summary is completed and provided to the government. Deliverables 004, 005, and 006 will include individual data points organized according to serial and lot numbers. Deliverable 007 will include drawings, modifications, and data related to any modifications to the UCTA.

All deliverables will detail analytical methodology, including: commercial or proprietary software required; all cost, benefit, risk, and sensitivity analysis process; and all recommendation criteria. The below deliverables will be provided to the EBHCC Government Impulse Cartridge Program Manager.

7.2 Data Rights: All deliverables shall be provided with the appropriately identified rights (unlimited).

CUI 12

Part 9: Tables and Figures

Table 1 Test Requirement Summary Table

Propellant Propellant

No. Units Tested per Apparatus Type & Temp Total Tests

Closed Bomb Test Universal Cartridge Test Apparatus BRU-44 Bomb Rack*+

From

Nominal Value gm -54 °C Ambient 71

°C -54 °C Ambient 71

°C -54 °C Ambient 71

°C

Ch em rin g

Bl ac kh or n

-20% 24.5096 5 5 5 5 5 5 0 0 0 30

-10% 27.5733 5 5 5 5 5 5 8 8 8 54

0% 30.637 5 5 5 5 5 5 8 8 8 54

10% 33.7007 5 5 5 5 5 5 0 0 0 30

20% 36.7644 5 5 5 5 5 5 8 8 8 54

Ea gl eP ic he r

M -9

-20% 22.5176 5 5 5 5 5 5 0 0 0 30

-10% 25.3323 5 5 5 5 5 5 8 8 8 54

0% 28.147 5 5 5 5 5 5 8 8 8 54

10% 30.9617 5 5 5 5 5 5 0 0 0 30

20% 33.7764 5 5 5 5 5 5 8 8 8 54

Sc ot

Bl ac km ag

-3

0% 25.2 10 10 10 10 10 10 8 8 8 84

Table 1: BBU-63/B Test Requirement Summary

*The number indicated for the BRU-Bomb Rack is the number of tests and not cartridges since a successful test requires two cartridges. The total number of cartridges for the BRU-44 Bomb Rack Test is double the number tests shown.

CUI 13

Table 2 BBU-63/B First Article Test Baseline

Propellan t

Propell ant

No. Units Tested per Apparatus Type & Temp* Total Tests Closed Bomb Universal Cartridge

Test Apparatus BRU-44 Bomb Rack**

From

Nominal Value gm -54 °C Ambient 71

°C -54 °C Ambient 71

°C -54 °C Ambient 71

°C

Chemr ing

Blackhor n 209

0% 30.637 10 10 10 10 10 10 8 8 8 84

EagleP icher M-9

0% 28.147 10 10 10 10 10 10 8 8 8 84

Scot Blackma g-3 0% 25.2 10 10 10 10 10 10 8 8 8 84

Table 2: BBU-63/B First Article Test Baseline

*This table represents cartridges to be conditioned according to Figure 1: Modified First Article Test Distribution for Closed Bomb and Universal Cartridge Test Apparatus and Figure 2: Modified First Article Test Distribution for BRU Bomb Rack.

**The number indicated for the BRU-Bomb Rack is the number of tests and not cartridges since a successful test requires two cartridges. The total number of cartridges for the BRU-44 Bomb Rack Test is double the number tests shown.

Table 3 Deliverables

Deliverable Item # Deliverables Frequency/Dates Data

Rights

PWS

Paragraph Data Item

Description

Closed Bomb Test Plan delivered to AFLCMC/EBHCC via Microsoft Office program or Adobe PDF.

Prior to start of Closed Bomb Test Unlimited

4.2.1 DI-NDTI-

80566A

UCTA Test Plan delivered to AFLCMC/EBHCC via

Microsoft Office program or Adobe PDF.

Prior to start of UCTA Test Unlimited

4.2.2 DI-NDTI-

80566A

BRU-44 Bomb Rack FAT Randomized Firing Table and

Test Plan delivered to AFLCMC via Microsoft Office program or Adobe PDF.

Prior to start of BRU-44 Bomb

Rack Test Unlimited

4.2.3 DI-NDTI-

80566A

UCTA Test Report delivered to AFLCMC/EBHCC via

Microsoft Office program or Adobe PDF.

Due upon completion of test Unlimited

4.3.2 DI-MISC-

80508B

CUI 14

Closed Bomb Test Report delivered to AFLCMC/EBHCC via Microsoft Office program or Adobe PDF.

Due upon completion of test Unlimited

4.3.1 DI-MISC-

80508B

BRU-44 Bomb Rack FA Test Report delivered to AFLCMC/EBHCC via

Microsoft Office program or Adobe PDF.

Due upon completion of test Unlimited

4.3.3 DI-MISC-

80508B

Modified UCTA Drawings delivered to AFLCMC/EBHCC via Microsoft Office program or Adobe PDF.

Due upon completion of test Unlimited

4.2.2 DI-SESS-

81008F

Monthly Status Report delivered to AFLCMC/EBHCC via Microsoft Office program or Adobe PDF.

Monthly Unlimited

7.1 DI-MGMT-

81928

009 Measurement System Evaluation

NLT 30 days after contract award Unlimited 5.1.1 DI-QCIC-

81960

010 Government Property (GP) Inventory Report

The first day of every quarter Unlimited 2.1 DI-MGMT-

80441D

Government Furnished

Material (GFM) by National Stock Number (NSN)

Monthly Unlimited

2.1 DI-PSSS-

80727A

012 Report, Record of Meeting/Minutes

NLT 5 days after Post-award

Meeting and any additional meetings

Unlimited

1.6.1 DI-

ADMIN-

81505

CUI 15

Figure 1: Modified First Article Test Distribution for Closed Bomb and Universal Cartridge Test Apparatus

This figure is a modified First Article Test of SP9927150 REV D 4.5.2.4 Figure 1. The tests that are bolded are the required tests.

CUI 16

Figure 2: Modified First Article Test Distribution for BRU Bomb Rack

CUI 17

Part 10: Definitions and acronyms COR: Contracting Officer’s Representative: A representative from the requiring activity appointed in writing by the CO to perform surveillance and to act as liaison to the contractor.

Defective service: A service output that does not meet the standard of performance associated with it in the PWS.

DCMA: Defense Contract Management Agency

FAT: First Article Test

CO: Contracting Officer

PWS: Performance Work Statement

Quality assurance surveillance plan (QASP): A written document specifying the surveillance method used for surveillance of contractor performance.

Quality control (QC): Actions taken by a contractor to control the performance of contracted services to meet PWS requirements.

Quality control plan (QCP): A plan written by the contractor demonstrating how the contractor shall maintain an inspection system acceptable to the Government covering the services under this PWS

Contracting Officer Representative (COR): A COR is appointed by the CO to perform the actions of Quality Assurance

Quality Assurance: Actions taken by the government to assure contracted services meet PWS requirements.

TDP: Technical Data Package

UCTA: Universal Cartridge Test Apparatus

0 Contents
Part 1: General Information
Part 2: Government-furnished Equipment and Materials
Part 3: Contractor-furnished items and services
Part 4: Specific tasks
4.2 Test Specification Summary
4.3.1 Closed Bomb Test
4.3.2 Universal Cart Test Apparatus
4.3.3 FAT using the BBU-44 Bomb Rack
Part 5: Quality Assurance
5.2.1 Non-Conformances
5.2.1.1 Minor Non-Conformance
5.2.2.2 Major Non-Conformance
5.2.2 Non-Conformance Notification
5.2.2.1 First Notice
5.2.2.2 Customer Complaint Record (CCR)
5.2.2.3 Corrective Action Report (CAR)
5.2.4 Contractor Performance Assessment Reporting System (CPARS) Applicability
5.3 Services Summary
Part 6: Applicable Documents
Part 7: Deliverables
Part 9: Tables and Figures
Table 1 Test Requirement Summary Table
Table 2 BBU-63/B First Article Test Baseline
Table 3 Deliverables
Figure 1: Modified First Article Test Distribution for Closed Bomb and Universal Cartridge Test Apparatus
Figure 2: Modified First Article Test Distribution for BRU Bomb Rack

Part 10: Definitions and acronyms

File details come from the government source that posted it. Updated .