PWS - Window Tint for MPC - 25 Jun 26.pdf
PDF 306 KB Posted
- Attached to
- Window Tint for MPC
- Solicitation number
- F2Z1236159AG01
About this file
Document Type: Performance Work Statement (PWS)
This Performance Work Statement, dated 25 June 2026, describes the professional installation of frosted window tinting on thirteen (13) designated exterior windows of the Mission Planning Cell (MPC) located within Building 1185 at McConnell Air Force Base. The window film shall be brand name SX-1002 (Clear Sand Blast) or an equal product meeting government requirements for privacy, light diffusion, and facility standards. The final application must be seamless, edge-to-edge without gaps, and free of defects including bubbling, creasing, peeling, or trapped debris. The contractor is responsible for furnishing all necessary labor, supervision, materials, specialized equipment, transportation, and tools, including comprehensive site preparation, surface cleaning prior to application, and final debris removal. All work must be executed between 15 June and 30 September 2026, with the exact daily installation schedule coordinated in advance with the MPC designated Point of Contact to align with operational activation timelines.
The contractor must operate strictly under positive control while inside the classified secure facility. All contractor personnel require REAL ID-compliant identification and must successfully clear base security vetting prior to work initiation. Personnel must remain under continuous, direct visual supervision by an authorized MPC escort at all times and clearly display required visitor badges above the waist. The contractor is solely responsible for ensuring all employees utilize appropriate Personal Protective Equipment and comply with OSHA standards and all applicable federal, state, and local laws. Contractor personnel must strictly adhere to all directives, traffic regulations, and security instructions issued by MPC staff, designated escorts, and McConnell AFB Security Forces Squadron, with failure to comply resulting in immediate removal. The MPC staff will fully sanitize the environment prior to contractor entry, physically securing all classified products, activating the blue alert light system to indicate the presence of uncleared personnel, and assigning authorized escorts for continuous supervision.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
c
PERFORMANCE WORK STATEMENT
WINDOW TINT INSTALLATION
25 June 2026
1. DESCRIPTION OF SERVICES
1.1. The Contractor shall execute the professional installation of frosted window tinting on thirteen (13) designated exterior windows of the Mission Planning Cell (MPC) located within Building 1185 (See Appendix A for exact window locations and dimensions).
1.2. The Contractor shall furnish all necessary labor, supervision, materials, specialized equipment, transportation, and tools required to complete the installation. This includes comprehensive site preparation, surface cleaning prior to application, and final debris removal. The Contractor must ensure that all work is conducted with minimal disruption to the facility and without degrading the operational integrity or physical security of the workspace.
1.3. The Contractor shall operate strictly under positive control while inside the facility. All Contractor personnel will be escorted into the MPC and must remain under continuous, direct visual supervision by an authorized MPC escort at all times. Personnel must clearly display the required visitor badge above the waist at all times while within the facility boundary.
1.4. The Contractor shall comply with all applicable federal, state, and local laws, including Occupational Safety and Health Administration (OSHA) standards. All installation activities must be executed in a manner that strictly prevents any compromise to the security of the classified facility.
2. DESCRIPTION OF WINDOW TINT
2.1. The window film utilized shall be brand name or equal to SX-1002 (Clear Sand Blast) in meeting the government’s requirements for privacy, light diffusion, and facility standards. Offerors proposing an 'or equal' product must provide specifications demonstrating that their proposed product meets or exceeds all salient characteristics. The final application must be seamless, cover the glass edge-to-edge without gaps, and be entirely free of defects such as bubbling, creasing, peeling, or trapped debris.
2.2. All phases of the project, including site preparation, material application, and final government inspection, shall be executed and fully completed between 15 June to 30 September 2026. The Contractor must coordinate the exact daily installation schedule with the MPC designated Point of Contact (POC) in advance to align with operational activation timelines.
3. CONTRACTOR REQUIREMENTS
3.1. The Contractor is solely responsible for ensuring all employees are equipped with and utilize the appropriate Personal Protective Equipment (PPE) necessary to execute the work safely and in full compliance with all applicable installation and federal safety regulations.
3.2. The Contractor shall coordinate directly with the McConnell AFB Visitor Control Center (VCC) to submit all requisite personnel background information prior to the start of work. All Contractor personnel must possess REAL ID-compliant identification and successfully clear base security vetting to obtain authorized access to the installation.
3.3. While operating on McConnell AFB, Contractor personnel must strictly adhere to all directives, traffic regulations, and security instructions issued by MPC staff, designated escorts, and the McConnell AFB Security Forces Squadron. Failure to comply with instructions may result in immediate removal from the installation.
4. SECURITY
4.1. All contracted work to be performed is unclassified; however, it will be executed within a classified secure space. Prior to Contractor entry, the MPC staff will fully sanitize the environment. This includes physically securing all classified products and displays, activating the facility's blue alert light system (indicating the presence of uncleared personnel), and assigning an authorized escort to supervise the Contractor at all times.
APPENDIX A - WINDOW LOCATIONS.
BLDG 1185 MPC WINDOW LOCATIONS
There are 13 windows within the MPC.
Room Number of windows 106 5 105 1 111 1 114 2 122 4
| PERFORMANCE WORK STATEMENT WINDOW TINT INSTALLATION |
| 1. DESCRIPTION OF SERVICES |
| 2. DESCRIPTION OF WINDOW TINT |
| 3. CONTRACTOR REQUIREMENTS |
| 4. SECURITY |
File details come from the government source that posted it. Updated .