PWS - W911QX26RA023.pdf
PDF 180 KB Posted
- Attached to
- Sources Sought Notice - Repair Firing Positions at M-Range at Aberdeen Proving Ground (APG), MD
- Solicitation number
- W911QX26RA023
About this file
This is a Performance Work Statement (PWS) for repair and construction work at M-Range, Aberdeen Proving Ground (APG), Maryland, dated 28 May 2026.
The contractor shall repair five firing positions (foxholes) at M-Range through comprehensive demolition, reconstruction, and infrastructure improvements. The primary tasks include: (1) removal and proper disposal of existing decking and framing from all five foxholes, followed by selective excavation to prepare for construction; (2) installation of reinforced concrete platforms with 4,000 PSI concrete slabs, reinforced concrete continuous footings, and proper rebar reinforcement to meet design specifications; (3) diagnosis and repair of electrical power supply issues at Lane A foxhole, including wiring, junction box, and power connection inspection and replacement; (4) construction of new reinforced concrete stairs for each foxhole measuring 42 inches wide with welded steel handrails and guardrails for safe access, properly graded and anchored for stability; and (5) removal and disposal of all construction debris in compliance with environmental requirements and restoration of disturbed areas to pre-construction conditions. Work shall be performed during normal business hours (0600-1600, Monday-Friday) within secure locations, excluding federal holidays. The contractor must be an independent contractor providing all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary for project completion in compliance with all applicable federal, state, and local codes, regulations, and laws. All contractor personnel must be U.S. citizens capable of obtaining favorable background checks or T1 investigations and able to speak, read, write, and understand English. Deliverables include a pre-construction schedule, 3Rs Safety Training certificates, Accident Prevention Plan, Activity Hazard Analysis, Quality Control Plan with inspection schedules, monthly waste reports, hazardous material inventory, employee list with badge applications, and equipment list—all due within ten days of notice to proceed (except waste reports due monthly and hazardous material inventory due two days pre-commencement and thirty days post-completion).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought - W911QX26RA023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Repair Firing Positions at M-Range
Transformation Decision Analysis Center Aberdeen Proving Ground (APG), Maryland
28 May 2026
C.1. BACKGROUND: The Transformation Decision Analysis Center (TDAC) is the Army's largest in-house analytical capability. The center provides the analytical underpinnings to inform Modernization decisions, while its lifecycle perspective enables it to also focus on near term Readiness and Operational Tools for the Warfighter. Its mission is to deliver objective analysis, experimentation, and data across the entire life cycle to ensure readiness today and a more lethal future force tomorrow.
C.2. SCOPE: The Contractor, as an independent Contractor and not as an agent of the Government, shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to repair five
(5) firing positions at M-Range, Aberdeen Proving Ground, MD. Work shall be completed as defined in this Performance Work Statement (PWS) and in compliance with all code, criteria, regulations, laws of the United States (local, state, and national). If there is a conflict between these documents, the most stringent requirement will govern. The Contractor employees shall remain under the Contractor’s direct supervision at all times.
C.3. SPECIFIC TASKS:
C.3.1. Demolition & Site Preparation:
C.3.1.1. The Contractor shall remove and properly dispose of all existing decking and framing from the five (5) foxholes.
C.3.1.2. The Contractor shall perform selective excavation as required to prepare for the concrete installation.
C.3.1.3. The Contractor shall mobilize and stage all necessary equipment and materials.
C.3.2. Concrete Construction for Foxholes:
C.3.2.1. The Contractor shall install reinforced concrete platforms in place of the existing decking at all five (5) foxholes.
C.3.2.2. The Contractor shall pour and finish 4,000 Pounds per Square Inch (PSI) concrete slabs for durable shooting positions.
C.3.2.3. The Contractor shall construct reinforced concrete continuous footings for structural stability.
C.3.2.4. The Contractor shall ensure proper reinforcement with rebar and finishing to meet design specifications.
C.3.3. Electrical Repairs for Lane A Foxhole:
C.3.3.1. The Contractor shall diagnose and repair the existing power supply issue at Lane A’s foxhole.
C.3.3.2. The Contractor shall inspect wiring, junction boxes, and power connections for any faults.
C.3.3.3. The Contractor shall replace or repair faulty wiring and components to restore power.
C.3.3.4. The Contractor shall conduct final system testing to verify proper functionality.
C.3.4. Concrete Stair Construction for Access:
C.3.4.1. The Contractor shall construct new reinforced concrete stairs for each of the five
(5) foxholes.
C.3.4.2. The stairs shall be 42 inches (”) wide, freestanding, and run perpendicular to the current foxhole lanes.
C.3.4.3. The Contractor shall install welded steel handrails and guardrails for safe access.
C.3.4.4. The Contractor shall ensure stairs are properly graded and anchored for stability and longevity.
C.3.5. General Site Work & Cleanup
C.3.5.1. The Contractor shall remove and dispose of all construction debris in compliance with the requirements in Section C.6.9.
C.3.5.2. The Contractor shall conduct a final walkthrough to verify quality and completion.
C.3.5.3. The Contractor shall restore any disturbed areas to pre-construction conditions.
C.4. TIME OF PERFORMANCE/SCHEDULING:
C.4.1. Access Hours - Normal working hours at APG are from 0600-1600, Monday through Friday. Any work requirements to be performed outside of the restricted areas shall be accessible unless the installation is officially closed. The Contractor shall ensure that all work performed within secure locations are performed during the hours of 0600-1600, and not on federal holidays or when the installation is officially closed. Arrangement for any work being performed outside of normal business hours shall be approved in advance by TDAC Contracting Officer’s Representative (COR). The Contractor employees shall use caution and drive at posted/safe speeds as to not endanger anyone or damage any vehicles in the parking lots or internal roads when performing work under this PWS.
C.4.2. Federal Holidays - The Contractor shall not be required to work on the following Federal holidays when the post shall be closed. When such holidays fall on a Saturday, the preceding Friday is considered a holiday. When such holidays fall on a Sunday, the following Monday is considered a holiday.
New Year’s Day 1 January* Martin Luther King's Birthday 3rd Monday in January Washington's Birthday 3rd Monday in February Memorial Day Last Monday in May Juneteenth 19th June* Independence Day 4 July* Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran's Day 11 November* Thanksgiving Day 4th Thursday in November Christmas Day 25 December*
*Holidays that are not designated as a firm day may not necessarily be observed on the date shown.
C.5. CONTRACTOR PERSONNEL:
C.5.1. Contractor Personnel - The Contractor shall provide personnel to fulfill the requirements outlined in this PWS upon start of performance under this contract. Prior to working on this project, the Contractor shall provide the COR with a list of employees who shall be working under this contract and a list of equipment that shall be used on the APG Installation. All Contractor personnel working under this contract shall be U.S. citizens and capable of getting and maintaining a favorable background check or T1 investigation. All Contractor personnel shall be able to speak, read, write, and understand English. The Contractor, not the Government, shall be responsible for management and quality control actions to meet the terms of the contract. The Contractor employees shall work independently based on the PWS and not under the direction of the Contracting Officer or COR or TDAC Government Representative.
C.5.2. Removal of Personnel - The Contractor shall remove any employee from the job site for reasons of misconduct; for purposes of security, or disregard of applicable safety law, procedures, or regulations; or any employee found to be, or suspected of being, under the influence of alcohol, drugs, or any incapacitating agent(s). The removal of a Contractor employee from the job site does not alleviate the Contractor of the requirement to provide sufficient personnel to perform the services as required by this contract.
C.5.3. The Contractor shall not employ any person whose employment under this contract could in any way result in a conflict of interest with the Government or another Contractor effort.
C.5.4. Personal Appearance: The Contractor shall ensure that personnel working during this performance period shall practice high standards of personal hygiene and maintain a clean, neat appearance while on duty.
C.6.1. The Contractor shall comply with all applicable parts of Unified Facilities Guide Specifications (UFGS) SECTION 01 35 26 GOVERNMENT SAFETY REQUIREMENTS, U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual, Engineer Manual (EM) 385-1-1, applicable Federal Acquisition Regulations (FAR), Defense Federal Acquisition Regulations (DFARS); all USACE Safety Policy and Regulations; and applicable federal, state, and local safety laws, statutes, regulations, executive orders, permits, Army regulations (ARs) (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, and policy. Contractor shall immediately report any conflicts between applicable federal, state, local safety laws, statutes, executive orders, and provisions of Army Regulation 385-10, The Army Safety Program, to the COR.
C.6.2. The Contractor shall submit an Accident Prevention Plan (APP) in accordance with (IAW) UFGS SECTION 01 35 26 GOVERNMENT SAFETY REQUIREMENTS.
C.6.3. Before beginning each activity, task, or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity shall prepare an Activity Hazard Analysis (AHA) IAW UFGS Section 01 35 26 Government Safety Requirements.
C.6.4. Unexploded Ordnance (UXO) may be encountered at work sites at APG.
Contractor and subcontractor personnel shall complete the 3Rs Safety Training – 3Rs Explosives Safety Education Program (https://www.denix.osd.mil/uxo/3rs-training/) prior to commencement of any work on site and annually thereafter. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the Contracting Officer, if a COR is not assigned.
C.6.5. The Site Safety and Health Officer (SSHO) shall meet the qualifications of EM 385-1-1. The SSHO can also be the Contractor Quality Control (CQC) Systems Manager and the supervisor as long as the individual meets the qualifications of each position and ensures safety of personnel, property, and the environment takes precedence over all other matters.
C.6.6. Record of Accidents or Incident: According to 29 Code of Federal Regulations (CFR), Part 1904, AR 385-40, and Aberdeen Proving Ground Regulation (APGR) 385-4, the Contractor shall report accidents resulting in injury, death, or damage to Government property, supplies, and equipment immediately to the COR or Government representative.
C.6.7. The Contractor shall, IAW Occupational Safety and Health Administration (OSHA) Regulation No. 29 CFR 1910, ensure protective equipment, including personal protective equipment is provided, used, and maintained by the Contractor in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact. The Contractor shall provide training to each employee who is required by to use Personal Protective Equipment (PPE).
https://www.denix.osd.mil/uxo/3rs-training/
C.6.8. Activity Hazard Analysis (AHA) C.6.8.1. The Accident Prevention Plan (APP) shall include Activity Hazard Analysis (AHAs) for the project. AHAs shall be completed IAW EM 385-1-1. The Contractor shall submit a group of AHAs covering all anticipated activities/tasks which the Contractor shall encounter while on site performing tasks associated with this task order. AHAs and the APP shall be in the possession of the designated Site Safety Officer or competent/qualified person onsite.
C.6.8.2. AHAs shall be approved by the Contractor’s Corporate Safety Manager prior to submitting to the Government. No work shall be performed unless there is a site specific AHA for the activity to be performed accepted by the Contracting Officer or his/her Government designated authority.
C.6.8.3. If/when the Contractor is tasked to perform work which is not covered in a previously submitted AHA, a separate AHA shall be submitted and shall be approved by the Contracting Officer or his/her Government designated authority prior to commencement of work.
C.6.9. Environmental Requirements
C.6.9.1. Compliance with Environmental Laws and Regulations: The Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement.
Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200- 1, and any specifications within this contract to the COR.
C.6.9.2. Compliance with Green Procurement Requirements: The Contractor shall follow Federal Environmental Protection Agency (EPA) Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable- Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials;
materials that are resource-efficient; materials with the maximum recycled content;
materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.
C.6.9.3. Compliance with License and Certification Requirements: The Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.
C.6.9.4. Notification of Federal and State Regulators: The Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site http://www.epa.gov/cpg https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx of any Federal, State, and/or Department of War (DoW) environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.
C.6.9.5. Inspections of Work Sites: The Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation.
Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it shall not stop or disrupt ongoing contract activities. The inspection shall only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.
C.6.9.6. Reporting Noncompliance: The Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.
C.6.9.7. Verification of National Environmental Policy Act Documents: The Contractor shall obtain from the COR or DGR, a copy of AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by Contractor. These documents include but is not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.
C.6.9.8. Conformance with Environmental Management System: The Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment.
C.6.9.9. Competency Training for Contractor Personnel: The Contractor shall not allow personnel to perform any activities and/or tasks on Army Materiel Command (AMC) installations without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.
C.6.9.10. Generation of Solid Waste: The Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility.
C.6.9.10.1. The Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.
C.6.9.10.2. Prior to removing any waste from the installation for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program (QRP) Manager, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream.
C.6.9.10.3. The Contractor shall submit monthly reports of the quantities of waste removed and recycled to the DGR and/or COR. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight.
C.6.9.10.4. The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.
C.6.9.10.5. The Contractor shall make maximum effort to reduce and prevent waste.
C.6.9.11. Use of Hazardous Materials: The Contractor shall be responsible for all hazardous materials management responsibilities. The Contractor shall submit a hazardous material inventory to the COR and/or DGR. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on Environmental Protection Agency (EPA) toxic chemical list without prior written approval from DGR and/or COR.
C.6.9.12. Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated IAW all regulations and policies as applicable to the Pollutant Discharge Elimination System general permit requirements.
C.6.9.13. Storm Water Management Low Impact Design/Development (LID): The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the Department of the Army (DoA) memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects regardless of size. In support of LID, Contractors shall adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices shall include, but are not limited to:
• Restoring predevelopment hydrology to the maximum extent technically feasible
• Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water
• Managing rainfall at the point where it falls
• Meeting the requirements of the Municipal Separate Storm Sewer System (MS4) permit
• Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division
C.6.9.14. Use of Pesticides: The Contractor shall submit the type and quantity of regulated pesticides to be applied, the application purpose, and location to the DGR and COR for approval ten (10) working days prior to the initial application. The Contractor shall submit the actual quantities applied (DD1532 or equivalent) to the DGR and COR within two (2) working days (48 hours) after each approved application. The Contractor shall utilize Integrated Pest Management (IPM) technology and procedures in strict compliance with all applicable Federal, State, Army, and installation regulations, to include the installation's integrated pest management plan. Pesticide applicators shall be certified and licensed IAW the State where work is being performed and/or Department of War (DoW) regulations. The Contractor shall provide evidence of personnel licenses and certifications to the Contracting Officer and the DGR prior to the initial application of pesticides. Only those pesticides registered with the U.S. EPA and approved by Army Materiel Command Pest Management Consultant shall be utilized and then only in strict accordance with product labeling. The installation reserves the right to prohibit and limit the amount and type of pesticides used.
C.6.9.15. Protection of Work Site Resources: The Contractor shall confine all activities to areas defined by the drawings and specifications. The Contractor shall identify any land resources to be preserved within the work area prior to the beginning of any work. The Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, top soil, and landforms except in areas indicated on the drawings or specified to be cleared. The Contractor shall provide effective protection for land and vegetative resources at all times. The Contractor shall coordinate harvesting of saleable timber with the DGR and/or COR prior to site clearing and grubbing. The Contractor shall notify the DGR and/or COR if any trees are required to be disposed or removed. The Contractor shall not remove or dispose of any tree greater than six (6) inches in diameter unless permission has been granted in writing by the DGR or COR.
C.6.9.16. Prevention of Spills: The Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department). If the Contractor spills or releases any substance listed in 40 CFR 302 into the environment, the Contractor shall immediately report the incident to the COR. The Contractor shall be liable for containment and environmental clean-up of the spill or release of such substance. Spill response, reporting and cleanup shall be performed IAW the Installation Spill Prevention and Response Plan, the APG Hazardous
Waste Management Plan, and with federal, state and local laws.
C.6.9.17. Protection of Sensitive Areas: The Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, or foot traffic) are prohibited.
The Contractor shall also adhere to the following installation sensitive areas requirements:
C.6.9.17.1. Cultural Resources Sites: The Contractor shall not excavate, remove, damage, or otherwise deface any archeological resource located on public lands.
C.6.9.17.2. Endangered Species Habitats: The Contractor shall not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threatened and endangered species.
C.6.9.17.3. Wetlands: The Contractor shall not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps.
C.6.9.18. Corrective Action for Noncompliance: The Contractor shall take immediate corrective action when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This will cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
C.6.9.19. Noise: The Contractor shall make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives shall not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the DGR and
COR.
C.6.9.20. Mercury: Mercury shall be prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers shall be prohibited. The Contractor shall remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition for disposal as directed. The Contractor shall immediately report instances of breakage or mercury spillage to the DGR and COR. The Contractor shall clean mercury spill area to the satisfaction of the Contracting Officer. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.
C.6.9.21. Universal Waste / e-Waste Management: Universal waste including but not limited to some mercury containing building products such fluorescent lamps, mercury vapor lamps, high pressure sodium lamps, Cathode Ray Tubes (CRTs), batteries, aerosol paint containers, electrical equipment containing Polychlorinated biphenyls (PCBs), and consumed electronic devices, shall be managed IAW applicable environmental law and installation instructions.
C.6.9.22. Pollution Prevention / Hazardous Waste Minimization: The Contractor shall minimize the use of hazardous materials and the generation of hazardous waste. The Contractor shall consult with the Environmental Office for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.
C.6.9.23. Ozone Depleting Substances - The Contractor shall not use any products containing Class I Ozone Depleting Substances in the performance of this contract.
C.6.10. Lyme Disease Warning - The Contractor shall ensure that their personnel take all reasonable precautions to avoid contracting Lyme disease, to include using repellents, wearing personal protective clothing, and avoid wearing abbreviated clothing such as shorts, short sleeve shirts, and so forth. The Contractor shall ensure particular attention is given to ticks and Lyme disease prevention when working in grassy areas of APG.
C.7. INTERNAL CONTROLS: The Contractor shall safeguard Government resources according to AR 11-2.
C.8. SMOKING POLICY: The Contractor shall comply with Department of Army policy to maintain a smoke free working environment. Smoking is permitted outside in authorized locations only. Smoking is prohibited within 50 feet of building entrances and near open windows and vents. The Contractor shall comply with AR 600-63 that establishes policies governing smoking in Government facilities.
C.9. PERSONAL/CONTRACTOR-OWNED PROPERTY: The Contractor shall ensure that personal property or Contractor-owned property brought onto the installation is clearly marked to preclude misidentification as Government property. Additionally, the Contractor shall ensure that personal property or Contractor-owned property meets safety specifications as set forth by OSHA, Maryland Occupational Safety and Health (MOSH), and AR 385-10. The Contractor shall ensure that all personal property or Contractor-owned property is removed from APG when contract services are completed.
C.10. DISTRIBUTION STATEMENT
C.10.1 DISTRIBUTION STATEMENT A: Determination of Performance Work Statement (PWS)
C.10.2 DISTRIBUTION STATEMENT F: Deliverables or information generated from this contract are Distribution Statement F or as determined by DD254 or DD1423. Other requests for this document shall be referred to FCDD-DAD-OF.
C.11. ANTI-TERRORISM/OPERATIONAL SECURITY (AT/OPSEC) REQUIREMENTS:
C.11.1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within
30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel.
AT level I awareness training is available at the following website: http://jko.jten.mil.
C.11.2. Locally developed I-WATCH Army Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area. The contractor and all associated subcontractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance, with the results reported to the COR NLT 30 calendar days after contract award.
(https://www.letterkenny.army.mil/ctrresources/ or https://www.swf.usace.army.mil/Missions/Antiterrorism-Community-Awareness/)
C.11.3. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated subcontractor employees shall comply with adjudication standards and processes using the National Crime Information Center Interstate Identification Index(NCIC- III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/ facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, IAW status of forces agreements and other theater regulations.
C.11.4. For contracts that require OPSEC Training. Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained with 30 calendar days of their reporting for duty and annually thereafter. The COR will ensure initial & annual training requirements are met.
C.11.5. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area. Contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
C.12. OTHER SECURITY REQUIREMENTS:
http://jko.jten.mil/
C.12.1. All documentation developed during the course of this Performance Work Statement (PWS) that are deemed property of the U.S. Government shall undergo security review and/or OPSEC review for appropriate distribution statement and dissemination controls. The Government program manager and TDAC Security Office shall approve any reports, documentation, or presentations to be distributed outside of the Government prior to distribution or release of information. The developer shall provide this documentation a minimum of 20 days prior to distribution to allow for review and approval. Only that material which has undergone an OPSEC security review and Public Affairs review and has been approved shall be released into the public domain.
C.12.2. To the extent that the work under this contract requires the Contractor to have access to DoD sensitive information, the Contractor shall after receipt thereof, treat such information as sensitive and safeguard such information from unauthorized use and disclosure. The Contractor agrees not to appropriate such information for its own use or to disclose such information to third parties unless specifically authorized by the Government in writing.
C.12.3. The Contractor shall allow access only to those employees who need the sensitive information to perform services under this contract and agrees that sensitive information shall be used solely for the purpose of performing services under this contract.
The Contractor shall ensure that its employees will not discuss, divulge or disclose any such sensitive information to any person or entity except those persons within the Contractor’s organization directly concerned with the performance of the contract.
C.12.4. The Contractor shall not use foreign nationals on this contract unless approved by the Transformation Decision Analysis Center Security Office. Any foreign nationals must be approved prior to initiating work under this project or subcontract. The following information is required when requesting approval for foreign national support: full name, date of birth, place of birth, citizenship, registration number, port of entry, photocopy of the work visa, permanent resident card or green card, abbreviated Curriculum Vitae, a sole source justification, and description of position in which employee will be utilized. These documents will be submitted to the Transformation Decision Analysis Center Security Office for approval. Previously approved foreign nationals must be re-approved if the nature of their work under this contract differs from that performed under the prior year's contract.
C.12.5. Badges shall not be transferred or shared between employees for entry into restricted areas.
C.12.6. Badges shall be worn only in the restricted area and shall be removed from sight upon exiting the area.
C.12.7. Badges shall not be used as a means of identification outside of the restricted area.
C.12.8. Badges shall be protected in such a manner as to preclude unauthorized access by another individual.
C.12.9. Cameras shall be strictly prohibited in the restricted area, unless approved by the COR and TDAC Security Office Team Leader or other appropriate APG Official.
C.12.10. The Contractor shall turn in the security badge(s) to the COR or authorized representative on the last day of the contract period or the last day of an individual’s employment, whichever occurs first.
C.12.11. Access to Job Site in Secure Location: The Contractor personnel entering the secure area shall have a photographic security badge or be escorted by authorized personnel who possess such a badge. One (1) person with a security badge may escort up to five (5) persons, provided all remain together and within sight of the escort.
Immediately after contract award, the Contractor shall submit badge applications for their employees that do not currently have restricted area badges via the TDAC G3 Physical Security Office. Forms may be obtained from the COR. All personnel and equipment entering secure areas are subject to applicable local and federal regulations.
C.12.12. TDAC Security Badge -
C.12.12.1. TDAC Unescorted Access: Unescorted access into restricted areas shall be granted to Contractor personnel upon receipt of a visit request to the TDAC Security Management Office and the U.S. Army Research Laboratory (ARL) Security Management Office listing a favorably completed investigation or a security clearance. Upon termination of the Contractor employee, the Contractor shall ensure the No-Escort Badge for APG is returned to the COR.
C.12.12.2. The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoW, Headquarters, Department of the Army (HQDA) and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
C.13. QUALITY CONTROL:
C.13.1. Quality Control Plan (QCP) - The Contractor shall develop and submit a QCP within ten (10) days after notice to proceed. All QCP updates shall be approved by the COR or designated Government representative prior to implementation. The basic principle of the plan is that the Contractor is responsible for quality control. The plan shall include:
C.13.2. Quality Control Inspection Schedules - The Contractor shall prepare and maintain QC inspection schedules which show when QC inspections will be made by QC personnel. The Contractor shall submit the QC Inspection Schedules to the COR.
C.13.3. Hold points are required for footings and rebar inspections.
C.14. DELIVERABLES:
C.14.1. The Contractor shall attend a pre-construction meeting and shall provide an anticipated schedule for completion of all work, using the notice to proceed as a start date, within ten (10) days after Notice to Proceed. Provide updated schedules as required by the COR.
C.14.2. 3Rs Safety Training – The Contractor shall provide the 3Rs Explosives Safety Education Program Training Certificates prior to commencement of work on site.
C.14.3. The Contractor shall submit a copy of the Accident Prevention Plan (APP) within ten (10) days after Notice to Proceed.
C.14.4. The Contractor shall submit a copy of the Activity Hazard Analysis (AHA) plan within ten (10) days after Notice to Proceed.
C.14.5. The Contractor shall submit a copy of the Quality Control Plan, including anticipated Quality Control Inspection Schedules, within ten (10) days after Notice to Proceed.
C.14.6. The Contractor shall provide monthly reports of the quantities of waste removed and recycled no later than 5th business days of each month.
C.14.7. The Contractor shall provide a hazardous material inventory two (2) days prior to the commencement of work on-site and thirty (30) days after construction completion.
C.14.8. The Contractor shall provide a list of employees who shall be working under this contract and submit badge applications for employees that do not currently have restricted area badges via the TDAC G3 Physical Security Office within ten (10) days after Notice to Proceed.
C.14.9. The Contractor shall provide a list of equipment that shall be used on the APG Installation within ten (10) days after Notice to Proceed.
Contracting Officer:
5/28/2026
X Orlando R. Hernandez
Contracting Officer (KO) Signed by: USA