This solicitation announces a re-vegetation installation and establishment service contract for the Feather River Mile 01 site. The selected contractor will manage re-vegetation activities on 4,700 square feet of riparian bench and upper bank, providing personnel, equipment, materials, irrigation and maintenance over the establishment period. Services include repairing existing fencing and signage, designing and operating a portable irrigation system, conducting weed and pest control, planting and replanting as needed, and removing infrastructure after establishment. The contract will be awarded as lowest price technically acceptable. Technical submissions and past performance will be evaluated in addition to price reasonableness. A non-mandatory site visit is scheduled for July 14th. Questions are due by July 17th and proposals by August 8th. The soliciting agency is the Department of the Army Corps of Engineers, Sacramento District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sacramento District 1325 J street, Sacramento, CA, 95814
SCOPE OF WORK
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS
SACRAMENTO, CALIFORNIA
SACRAMENTO RIVER BANK PROTECTION PROJECT (SRBPP)
RE-VEGETATION INSTALLATION AND ESTABLISHMENT SERVICE CONTRACT
FEATHER RIVER MILE 01 LEFT BANK
The overall responsibility of the Contractor is to manage and perform the activities necessary to re-vegetate 4700 square feet of the riparian bench and upper bank within the formerly repaired levee area. The contractor shall provide all personnel, equipment, material, tools, supervision, quality control, and other items necessary to ensure that the designated habitats are installed and maintained in order to provide suitable environment for vegetation establishment at this site.
Services include, but are not limited to repairing or replacing any damage to existing Beaver Barrier Fence (BBF) or signage around the entire site, providing portable pumps to draw water directly from the adjacent river for irrigation and designing, installing, repairing and replacing the irrigation system that supplies water to the newly installed vegetation at the frequency stated within this contract. Services also include maintaining the vegetation and site infrastructure for the duration of the establishment period, trimming and herbicide spraying of the grasses, irrigating the installed vegetation, weeding around the woody plants, performing plant surveys and submitting monthly records and year end reports, performing replanting where plant survival falls below designated levels, trash removal, and removing above ground irrigation equipment and Beaver Barrier Fence (BBF) after the establishment period is completed.
File details come from the government source that posted it. Updated .