This performance work statement outlines requirements for installing storm door motors and repairing high-speed doors at a Puerto Rico Air National Guard facility. The contractor must install three Cookson door openers with control stations and covers on existing manually operated doors. Additional requirements include troubleshooting and repairing non-working high-speed doors, conducting preventive maintenance inspections, and providing all necessary parts, tools, equipment, and cleanup. The related federal contract opportunity is a solicitation from the Department of the Army National Guard seeking offers for storm door maintenance and repairs. The performance work statement provides technical specifications that will be used to evaluate contractor performance on the requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) for
156th Civil Engineering Squadron Puerto Rico Air National Guard (PR ANG)
Storm Door Motors
1.0 General.
1.1 Scope. Provide and install storm door motors for Bldg. 3 Fire & Emergency Services. These motors open and close protective doors and allow FES to maintain response capability during hurricanes.
1.2 Background. The Strong Bonds Program is meant to provide communication tools for married, singles, and families.
1.3 Period of Performance (PoP). The Period of Performance shall be no more than 60 days after contract award.
1.4 General Information.
1.4.1 Quality Control (QC). The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the Contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary
1.4.2 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days.
New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day
1.4.3 Place and Performance of Services. The contractor shall provide services between the hours of 0730-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government facility/installation closings. The contractor, shall at all times, maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.3.1 Unscheduled gate closures by Security Forces may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented.
Contractors are not compensated for unexpected closures or delays. Vehicles operated by Contractor’s personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable
Puerto Rico Air National Guard (PR ANG) motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.4 The Contractor’s employees shall become familiar with and obey the regulations of the installation; including, fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All Contractor’s employees shall carry proper identification with them at all times. The Contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance.
1.4.5 Security Requirements. The Contractor shall comply with all applicable installation/facility access and local Security Forces procedures, which may be obtained from the COR. The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Security Office. The Contractor shall ensure compliance with all personal identity verification requirements as directed by DOD and/or local policies. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. The Contractor shall coordinate all on-site activity, as required, in conjunction with the COR and the appropriate installation/facility representatives. Installation Entry Access List (EAL) is required fifteen to thirty (15-30) calendar days ahead for processing, prior to base access approval being granted, along with DD Form 369, Police Record Check and driver’s license copy.
Additionally, Contractor’s personnel will be responsible to coordinate any escorting required for temporary workers, as determined by Security Forces. Contractors are not compensated for failure to comply with Security Forces policies and procedures for entry.
1.4.5.1 Anti-terrorism Level 1 (AT) Awareness Training. All Contractor’s employees requiring access to any installation/facility and controlled access areas shall complete AT Level 1 within ten (10) calendar days after contract start date and within ten (10) calendar days of new employees commencing performance. The Contractor shall submit certificates of completion for each affected Contractor and sub-contractor employee, to the COR or KO if a COR is not assigned, within ten (10) calendar days after completion of training. AT Level 1 is available at http://jko.jten.mil/course/atl1/launch.html.
1.4.5.2 Photos. Only key Contractor’s personnel are authorized to take pictures of the construction area. Careful planning must be taken to ensure no aircraft, facilities or military personnel appear in pictures inadvertently.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.5 Special Qualifications. The contractor shall ensure all employees possess all required licenses for operating heavy equipment, welding licenses, Material Handling Equipment (MHE) (i.e. forklift) and any others, in the performance of this contract. The Government does not provide training to Contractors.
Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified to provide services.
Puerto Rico Air National Guard (PR ANG)
1.6 Identification of Contractor Employees. All contractor personnel are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed. The contractor shall retrieve all identification media (including vehicle passes) from their employees who depart employment for any reason.
1.7 Combating Trafficking in Persons. The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in any forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy and the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
Contractor shall complete the following online training within 5 calendar days after contract award:
Course number is N-US189-HB; available at: http://jko.jten.mil.
1.8 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms.
2.1 Definitions.
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 ORDER POINT OF CONTACT (POC). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as
Puerto Rico Air National Guard (PR ANG) long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non- manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privet of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 Acronyms
AAR After Action Report AC Area Commander AEI Army Enterprise Info Structure AFARS Army Federal Acquisition Regulation Supplement ANG Air National Guard AR Army Regulation ATCTS Army Training Certification Tracking System AUP Acceptable Use Policy BBP Better Business Practice CDM Concept Development Meeting CERFP CBRNE Enhanced Response Force Packages CBRN Chemical Biological Radiological Nuclear
Puerto Rico Air National Guard (PR ANG)
CCIRs Commander’s Critical Information Requirements CCE Contracting Center of Excellence
CFR Code of Federal Regulations CM Contract Manager CNGB Chief National Guard Bureau COMSEC Communications Security CONUS Continental United States (excludes Alaska and Hawaii) POC Order Point of Contact COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf CPX Command Post Exercise CRTC Combat Readiness Training Center CST Civil Support Team CUI Controlled Unclassified Information DA Department of the Army DC Displaced Civilians DHS Department of Homeland Security DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense DSCA Domestic Support to Civil Authorities EMAC Emergency Management Assistance Compact EMI Emergency Management Initiative ENDEX End Exercise EXCON Exercise Control FAR Federal Acquisition Regulation FEMA Federal Emergency Management Agency FPCON Force Protection Condition FPM Final Planning Meeting FSRT Fatality Search & Recovery Team FTE Full Time Equivalent FTX Field Training Exercise HIPAA Health Insurance Portability and Accountability Act of 1996 HQDA Headquarter Department of Army HRF Homeland Response Force HSEEP Homeland Security Exercise & Evaluation Program IA Information Assurance IAPS Incident Action Planning Support IC Incident Commander ICS Incident Command System IMT Incident Management Team IPM Initial Planning Meeting IT Information Technology JELC Joint Event Life Cycle
Puerto Rico Air National Guard (PR ANG)
JET Joint Enabling Team JFHQ Joint Forces Headquarters JISCC Joint Incident Site Communications Capability
JITEC Joint Interagency Training and Education Center JLLIS Joint Lessons Learned Information System JMETs Joint Mission Essential Tasks JOC Joint Operations Center JTR Joint Travel Regulation JTS Joint Training System JTF Joint Task Force JTIMS Joint Training Information Management System KO Contracting Officer LNO Liaison Officer MOA Memorandum of Agreement MPM Mid-Planning Meeting MSR Monthly Status Report NACI National Agency Check Inquires NGB National Guard Bureau NGRF National Guard Reaction Force NIMS National Incident Management System NLT Not Later Than OCI Organizational Conflict of Interest OCONUS Outside Continental United States OCT Observer Controller Trainer ODC Other Direct Costs OPSEC Operations Security PCO Procuring Contracting Officer PRANG Puerto Rico Air National Guard PRNG CYP National Guard Child and Youth Program PII Protection of Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SB Strong Bonds SFE Special Focus Exercise SME Subject Matter Experts STARTEX Start Exercise TAR Travel Authorization Request TE Technical Exhibit TTX Table Top Exercise WAWF-RA Wide Area Workflow-Receipt and Acceptance
Puerto Rico Air National Guard (PR ANG)
3.0 Government Furnished Property, Material, Equipment, and Services (GFP/M/E/S). The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract.
3.1 Property: None.
3.2 Materials: None.
3.4 Services: None.
3.5 Utilities: None.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E). The Contractor shall provide the meeting package, lodging, and food service as described in this PWS.
4.1 General: The contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1
5.0 Requirements.
5.1 Install three (3) Cookson MGH Logic Operators (Door Openers) with 3 Button Station and Cover to motorize the existing manually operated doors for existing 18' W X 18' H RSD.
5.1.1 Conversion and Installation of Motor and Cover, including electrical work and conduit as needed from existing facility circuits.
5.1.2 Test and ensure functionality and ensure users are trained/familiar with operation.
5.1.3 Repair, replace, or seal and holes, damage, or broken components caused by the installation process.
5.1.4 Provide all applicable use manuals and maintenance guides.
5.2 Troubleshoot existing SG 400 High Speed Security Doors (non-working) and return to normal operation.
5.2.1 Repair no-operative door #1 currently stuck in closed position.
5.2.2 Repair doors #2 & #3 random openings and trouble codes
5.2.3 Ensure all doors operate using door mounted controls, remote buttons located in the communications center (communications console), individual remote controls, and via manual operation.
Puerto Rico Air National Guard (PR ANG)
5.3 Conduct preventive maintenance and inspection for high speed, and storm door equipment in accordance with manufacturer’s instructions and recommendations.
5.4 Scissor lift rental and equipment freight to be included in the final price.
5.4.1 Provide all parts, tools, and supplies needed to complete installation, troubleshooting, repairs, and preventive maintenance.
5.4.2 Clean and remove all debris remaining for installation, troubleshooting, repair, and preventive maintenance.
Technical Exhibit 1 Performance Requirements Summary
This Performance Requirements Summary includes performance standard. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Discipline
Task
Performance Standard
Acceptable Quality Level
(AQL)
Surveillance Method/By
Whom
5.1 Motors a. Electrical Operation Open &
Close (x3)
b. Manual Operation Open & Close (x3)
c. Safety stop functionality (x3)
100%
98%
Daily
5.2 Installation
a. Door mounted push button operation open/close (x3)
b. Communications Console button operation open/close (x3)
c. Individual remote control operation (x3)
5.3 Speed
Door Repairs
a. Properly functioning doors
b. Inspection and testing
5.4 Equipment & Site Cleanup
a. Proper safety equipment used for high reach operations
b. Needed tools and equipment provided
c. Work site cleaned and all debris removed