PWS Steam Tunnel.docx
DOCX document 68 KB Posted
- Attached to
- WEST POINT LAUNDRY STEAM TUNNEL Federal contract opportunity
- Solicitation number
- W911SD-23-R-0180
About this file
This memorandum outlines requirements for a new steam tunnel at the Laundry Facility at West Point. The current steam tunnel, installed in 2003, has reached the end of its expected 20-year lifespan. A new steam tunnel is needed to maintain the laundry mission of processing clothing and linens for cadets and the Army medical center without disruptions.
The specifications for the new steam tunnel include side and top steaming of garments, a wire hanger conveyor system replicating the current layout, easily serviced or automatic lint screens, integral steam vent systems to reduce heating of the facility, a programmable control unit for temperature and steam flow, adjustable conveyor speed, a stainless interior to prevent rust transfer, and compatibility with existing electric, plumbing and steam systems. Installation must include removal and disposal of the current steam tunnel, installation of the new equipment, and connection to facility utilities. The selected vendor will also provide shipping, delivery, installation, start-up, demonstration, and a standard one-year parts and workmanship warranty.
This requirement aligns with federal contract opportunity W911SD-23-R-0180 for a new steam tunnel at the West Point Laundry Facility, issued by the Department of the Army Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SD-23-R-0180-0001- WEST POINT- LAUNDRY STEAM TUNNEL-RFIs.pdf | ||
| W911SD-23-R-0180- WEST POINT- LAUNDRY STEAM TUNNEL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
DEPARTMENT OF THE ARMY
LRC WEST POINT
Bldg. 845 Laundry Plant West Point, NY 10996
ASPA-LWP-SSL 3 MAY 2023
Memorandum To: MICC Contract Specialist
Subject: Steam Tunnel PWS/Specs
Requirement: The Laundry Facility requires a new Steam Tunnel to accomplish the mission of laundering clothing and linens for the USMA cadets and Army Medical Treatment Facilities. The equipment will replace the current item which has reached its life cycle expectancy and could cause a delay in the processing of laundry. Steam Tunnels have a life cycle expectancy of 20 years and the current Steam Tunnel was manufactured in 2003. There is only one Steam Tunnel in the Laundry Plant, which is used daily to accomplish the mission and meet terms and conditions of the laundry contract. If the equipment stops working properly, we will be faced with mission failure. To maintain operational tempo with properly maintained equipment, operation must be seamless and result in minimal operational deficiencies. The intent is to purchase the equipment as soon as practical utilizing the following specifications.
Steam Tunnel Specifications:
1. Side and Top steaming of garments before drying
2. Must include wire hanger conveyor system that replicates current layout
3. Easily serviced or automatic lint screens
4. Integral Steam vent system both on inlet and exit to reduce heating up laundry facility
5. User Programable/adjustable control unit for Steam closet temp and steam flow
6. Adjustable conveyor system speed
7. Machine’s interior must be stainless to avoid rust transfer to garments
8. 208 vac, 3 phase
Vendor Requirements:
1. Must complete a site visit to examine current equipment and ensure new equipment will be compatible with all electric, plumbing, and steam, as necessary, and fits into installation space provided.
2. Must remove and dispose of current equipment, including disconnect of all components tied into facility utilities, and install new equipment.
3. The vendor will be responsible for shipping, delivering, uncrating, installation, start-up, electrical, and demonstration of new equipment and removal of packaging and installation materials. Installation to include connection of new equipment to all existing electric, plumbing, and steam.
4. Must include a standard 1-year warranty on parts and workmanship