This memorandum outlines requirements for a new steam tunnel at the Laundry Facility of the United States Military Academy at West Point. The current steam tunnel, installed in 2003, has reached the end of its expected 20-year lifespan and must be replaced to ensure continued laundering capabilities for cadets and medical facilities. The new steam tunnel must include side and top steaming functions, a wire hanger conveyor system replicating the current layout, easily serviced or automatic lint screens, integral steam venting on inlet and exit to reduce facility heating, programmable temperature and steam flow controls, adjustable conveyor speed, and a stainless steel interior. Vendors must conduct an on-site evaluation of the existing equipment and space, remove and dispose of the current steam tunnel while disconnecting all utilities, install the new steam tunnel connecting to facility electric, plumbing and steam, and provide a standard one-year parts and workmanship warranty. This requirement corresponds to federal contract opportunity W911SD-23-R-0180 for a new steam tunnel at the West Point Laundry Plant through the Department of the Army Mission and Installation Contracting Command at Fort Eustis.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

DEPARTMENT OF THE ARMY

LRC WEST POINT

Bldg. 845 Laundry Plant West Point, NY 10996

ASPA-LWP-SSL 3 MAY 2023

Memorandum To: MICC Contract Specialist

Subject: Steam Tunnel PWS/Specs

Requirement: The Laundry Facility requires a new Steam Tunnel to accomplish the mission of laundering clothing and linens for the USMA cadets and Army Medical Treatment Facilities. The equipment will replace the current item which has reached its life cycle expectancy and could cause a delay in the processing of laundry. Steam Tunnels have a life cycle expectancy of 20 years and the current Steam Tunnel was manufactured in 2003. There is only one Steam Tunnel in the Laundry Plant, which is used daily to accomplish the mission and meet terms and conditions of the laundry contract. If the equipment stops working properly, we will be faced with mission failure. To maintain operational tempo with properly maintained equipment, operation must be seamless and result in minimal operational deficiencies. The intent is to purchase the equipment as soon as practical utilizing the following specifications.

Steam Tunnel Specifications:

1. Side and Top steaming of garments before drying

2. Must include wire hanger conveyor system that replicates current layout

3. Easily serviced or automatic lint screens

4. Integral Steam vent system both on inlet and exit to reduce heating up laundry facility

5. User Programable/adjustable control unit for Steam closet temp and steam flow

6. Adjustable conveyor system speed

7. Machine’s interior must be stainless to avoid rust transfer to garments

8. 208 vac, 3 phase

Vendor Requirements:

1. Must complete a site visit to examine current equipment and ensure new equipment will be compatible with all electric, plumbing, and steam, as necessary, and fits into installation space provided.

2. Must remove and dispose of current equipment, including disconnect of all components tied into facility utilities, and install new equipment.

3. The vendor will be responsible for shipping, delivering, uncrating, installation, start-up, electrical, and demonstration of new equipment and removal of packaging and installation materials. Installation to include connection of new equipment to all existing electric, plumbing, and steam.

4. Must include a standard 1-year warranty on parts and workmanship