PWS Sources Sought.pdf
PDF 135 KB Posted
- Attached to
- CEMS REAC
- Solicitation number
- FA5004CEMSREAC
About this file
This Performance Work Statement (PWS) outlines requirements for 24/7 maintenance and technical support of Continuous Emissions Monitoring System (CEMS) and CEMADAS equipment at Eielson Air Force Base, Alaska. The contractor must maintain and support specific environmental monitoring equipment for boilers 5A and 6A at the Central Heat and Power Plant, including the CEMDAS V1.0.62 system, multiple California Analytical Instruments (models 700, ZRE-2, 650, ZPA-2), Perma Pure Sample Pumps, Maple Systems Touch Panel, and Allen Bradley Compact Logix processor.
ESC Spectrum Corporation must provide comprehensive service including two annual onsite preventative maintenance visits, 24/7 emergency telephone support, unlimited business hours support, cylinder gas audits with reports, 72-hour onsite emergency response, expedited parts shipment, and annual CEMDAS software support to meet EPA and Alaska Department of Environmental Conservation requirements. The system must operate without external internet connectivity, with updates performed via CD or other external devices. The work involves compliance with federal, state, and local environmental regulations while maintaining continuous emissions monitoring and reporting capabilities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
1.0 GENERAL SCOPE
The contractor shall provide all personnel, labor and supervision necessary to provide continuous, 24 hour a day 7 days a week, maintenance of hardware and software support to the CEMS and CEMADAS equipment monitoring and reporting environmental emissions for boilers 5A and 6A required of the Central Heat and Power Plant at Eielson Air Force Base, Ak. The contractor shall comply with all commercial and industry standards and all applicable federal, state and local laws, regulations and procedures.
2.0 GENERAL INFORMATION
2.1 Contractor will provide maintenance/technical support for the following environmental monitoring and controls equipment (CEMS-CEMDAS)
2.1.1 CEMDAS V1.0.62
Continuous Emissions Monitoring Data System: Sn 9K03DH2
2.1.2 California Analytical Instruments 700 series
Serial Number: 2109022
2.1.3 California Analytical Instruments ZRE-2
Serial Number: A3E5365T
2.1.4 Two (2) Perma Pure Sample Pump 4S-9PA
Serial Numbers: 4S09081603 & 4S09081605
2.1.5 California Analytical Instruments 650
Serial Number: F06001
2.1.6 California Analytical Instruments ZPA-2
Serial Number: N7G2168
2.1.7 Maple Systems Touch Panel HMI 5043L
Serial Number: 1701104052
2.1.8 Allen Bradley Compact Logix L32E Processor
2.1.9 Upgraded DAHS Software and equipment as required
2.2 Contractor will provide ESC Spectrum Corporation complete service to include:
2.2.1 Two Onsite Visits per year to provide continued preventative maintenance training to plant personnel of Continuous Emissions Monitoring and Data Acquisition systems equipment, including analyzers and probes. This includes but is not limited to flow check, filter replacements, media replacements/upgrades and cleaning. Annual tune-up and overhaul as required as well.
2.2.2 Provide 24/7 emergency telephone support for system problems that occur outside of the normal business hours
2.2.3 Ensure unlimited telephone support during normal business hours to answer questions relating to the Operations and Maintenance of existing CEMS-CEMDAS systems.
2.2.4 Perform required Cylinder Gas Audits (2 per year) and provide a written report withing 30 days of completion of on-site activities.
2.2.5 Ensure field service engineer is on-site within 72 hours of the determination that on-site support is required.
2.2.6 Contractor will provide emergency parts shipment (expedited shipment and delivery) of in-stock parts for any emergency.
2.2.7 Provide annual CEMDAS proprietary software support of Data Acquisition System to ensure continued updates required of the Environment Protection Agency and Alaska Department of Environmental Conservation
3.0 SUPPLEMENTAL INFORMATION
3.1 The Following personnel are representatives for this project:
3.2 The government will not provide temporary internet and network communication requirements for access to the CEMS-CEMDAS network equipment on an “as needed” basis. A dedicated external internet to facility is not permitted, updater/upgrade must be accomplished vis CD or other external devices.
File details come from the government source that posted it. Updated .