PWS Snowplow attachment install -June 13 2025.pdf
PDF 119 KB Posted
- Solicitation number
- Not on record
About this file
This Performance Work Statement (PWS) details the retrofit of two dump trucks with snowplow attachments for Cannon Air Force Base in New Mexico, dated June 2025. The contractor is required to comprehensively modify the trucks, including removing existing dump equipment, installing new hydraulic systems, mounting electronic dual spreader control valves, and adding snowplow attachments with specific components like hardened cutting edges, rubber snow deflectors, and fiberglass visibility whips. Key requirements include preparing trucks' interior and exterior, installing new control systems in the cab, ensuring all systems meet manufacturer standards, demonstrating fully operational equipment without leaks, and providing test results and warranty documentation to the 27th Special Operations Civil Engineering Squadron (27 SOCES).
The PWS specifies that vehicles can be taken to a vendor location within 300 miles of Cannon Air Force Base, and the contractor must comply with all federal, state, and local laws and industry standards. The detailed scope of work includes precise installation instructions for hydraulic systems, control mechanisms, mounting hardware, and supplementary equipment like lights and wiring harnesses, with an emphasis on driver safety, operational convenience, and equipment functionality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAM Post Single Source justification KO Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
RETROFIT 2 DUMP TRUCKS FOR SNOWPLOW
ATTACHMENTS
Cannon Air Force Base, New Mexico
Date: June 2025
1. DESCRIPTION OF SERVICES. The contractor shall provide all labor, personnel, equipment, tools, materials, vehicles, supervision, qualifications and other items and services necessary to retrofit 2 dump trucks with snowplow attachments. The contractor shall perform the requirements of this PWS in compliance with all federal, state, and local laws and industry standards.
1.1 The Contractor shall:
a. Prepare the trucks' interior and exterior for installation of new hydraulic systems.
b. Remove existing dump pump, reservoir, valving and controls; return to 27 SOCES.
c. Install universal mounts, replace OEM light duty front bumper with 12' channel return original to 27 SOCES.
d. Install hydraulic systems, including high and low pressure lines, quick disconnects at termination points and new 35 gallon reservoir with filter and shut off valve.
e. Install electronic dual spreader control valve with enclosure for exterior mounting, with cab interior digital valve controls for spinner and conveyor speed, including wiring harness.
Components are to allow cab operator to change conveyor and spinner speeds in real time from within the cab utilizing new air control pedestal floor mounted console in cab for dump up/dump down control and push button controls for spreader auger, spinner and blast function.
f. Seal any vehicle body penetrations against weather leakage.
g. Install controls and switches so they are convenient and safe for driver's operation.
h. Install new plows onto mounts, including replaceable hardened cutting edge, rubber snow deflectors, adjustable height hard adjustable height replaceable hardened steel running shoes, curb shoes, and fiberglass visibility whips.
i. Install control wiring and mount lights on fenders.
j. Ensure all systems are working to manufacturer's standards.
k. Demonstrate fully operational attached equipment that is free of any leaks.
l. Provide a paper copy of all test results to 27 SOCES.
m. Provide written warranty details, conditions and applicable time frame.
n. Vehicles can be taken to vendor location within 300 miles from Cannon Air Force Base.
| PERFORMANCE WORK STATEMENT (PWS) |
| FOR |
File details come from the government source that posted it. Updated .