PWS -Sewer Pump Station SB 1131 v2 Released.docx
DOCX document 64 KB Posted
- Solicitation number
- W912CN25QA007
About this file
This Performance Work Statement (PWS) details the requirement to troubleshoot and repair the Sewer Lift Station's automatic float switches at Building 1131, Schofield Barracks, Oahu, Hawaii. The contractor will provide labor, transportation, supplies, and equipment to identify and resolve issues with the float switches, junction box, and control panel, including replacing components as needed.
Key objectives include producing a comprehensive service report with a cost assessment, system condition summary, and written estimate for additional repairs to restore full operational status. The work must be performed during normal government working hours (7:30 a.m. - 4:00 p.m., Monday through Friday), excluding federal holidays. The contractor is required to follow all applicable local, state, and federal regulations, including safety standards, and must comply with environmental, safety, and access control requirements specific to US Army Garrison Hawaii installations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Troubleshoot and Repair the Sewer Pump Station at Building 1131, Schofield Barracks, on the Island of Oahu, HI
07/18/2024 v1 11/21/2024 v2
Performance Work Statement (PWS)
Troubleshoot and Repair the Sewer Pump Station at Building 1131, Schofield Barracks, on the Island of Oahu, HI
1. Scope The Contractor shall provide all labor, transportation, supplies, and equipment to troubleshoot and repair the Sewer Lift Station’s automatic float switches (see T.E.#1, T.E.#2 and T.E.#3) at Schofield Barracks, Area X, Building 1131, Island of Oahu, Hawaii to determine any further issues and replace floats and associated wiring to junction box and control panel refer (T.E. #2) to operational. The Contractor shall provide a service report that includes a cost assessment of the service, a summary of the system's current condition, and a written estimate for the additional repairs needed to restore the system to full operational status. The Contractor shall follow all applicable local, state, and federal regulation, including safety standards to fulfill this requirement.
2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer (KO) immediately.
2.2 Business Relations
The Contractor will successfully integrate and coordinate all activities needed to execute the requirement. The Contractor shall manage the timeline, completeness, and quality of problem identification. The Contractor shall seek to ensure customer satisfaction and maintain the professional and ethical behavior of all contractor personnel.
2.3 Contract Administration and Management
The Contractor must maintain communication between the support operations at the Directorate of Public Works (DPW) Service Contract Branch, DPW Engineering Division Subject Matter Expert (SME) and the Contractor's corporate offices. The Contractor shall respond to the Government's request for this contractual action promptly.
2.4 Subcontract Management
The Prime Contractors shall notify the Contracting Officer Representative (COR) if the Prime Contractor add any subcontractors necessary to integrate this work. The Prime Contractor shall be responsible for any Subcontract management and work performed on this requirement and shall be responsible and accountable for Subcontractor performance on this requirement. The prime Contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Cross teaming may or may not be permitted.
2.5 Contractor Personnel, Disciplines, and Specialties
The Contractor will accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The Contractor will provide the necessary resources and infrastructure to manage, perform, and administer the contract.
2.6 Location and Hours of Work
The work for this requirement is located at Schofield Barracks, Area X, Building 1131, Island of Oahu, Hawaii. This contract shall be performed during Government’s normal working hours, 7:30 a.m. – 4:00 p.m., Monday through Friday, excluding Federal Holidays. In no event shall the Contractor perform work outside the normal working hours without obtaining written approval from the Contracting Officer (KO).
2.7 Federal holidays: The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
| New Year’s Day | Labor Day | ||
| Martin Luther King Jr.’s Birthday | Columbus Day | ||
| President’s Day | Veteran’s Day | ||
| Memorial Day | Thanksgiving Day | ||
| Independence Day | Christmas Day | ||
| Juneteenth National Independence Day |
3. Performance Requirements The following section specifies the Performance Objectives and Performance Elements for the contract.
Objective:
Troubleshoot and repair the sewer lift station automatic float switches and replace floats and associated wiring to junction box and control panel at Schofield Barracks, Area X, Building 1131.
Deliverable:
A001- The Contractor shall provide a service report that includes a cost assessment of the service, a summary of the system's current condition, and a written estimate for the additional repairs needed to restore the system to full operational status.
Performance Standards
A) STD: The Contractor shall refer to (T.E. #1, #2 and #3) for the all the components necessary to accomplish this requirement.
Acceptable Quality Level (AQL). The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.
5. Performance Requirement Summary (PRS)
| Statements |
| Standards/AQLs |
| Incentive/Remedy |
Objective:
Troubleshoot and repair the sewer lift station automatic float switches and replace floats and associated wiring to junction box and control panel at Schofield Barracks, Area X, Building 1131, Island of Oahu, HI.
Deliverable A001- The Contractor shall provide a service report that includes a cost assessment of the service, a summary of the system's current condition, and a written estimate for the additional repairs needed to restore the system to full operational status.
STD: The Contractor shall refer to (T.E. #1, #2 and #3) for all the components necessary to accomplish this requirement.
AQL: 0%
Zero Deviation from performance standard.
Trends of less-than-acceptable performance could result in non-conforming reports issued to the Contractor or additional time needed to accomplish this requirement at no additional cost to the Government.
6.0 OTHER INFORMATION.
6.1 EMERGENCY PLANNING COMMUNITY RIGHT TO KNOW ACT (EPCRA) HAZARDOUS SUBSTANCES (HS).
(a) Contractors using EPCRA HS in the performance of any work while on USAG-HI installations are responsible for complying with the provisions of EPCRA regulations and submitting applicable reports (TIER II/TRI) to Federal and State regulatory agencies as applicable.
(b) Copies of reports for substances used in connection with work performed on USAG-HI installations shall be provided to the DPW Environmental Division, Attention: EPCRA Program Manager, STOP 253, 3rd Floor, 948 Santos Dumont Ave., Wheeler Army Airfield, phone 808-656-2878.
(c) Chemicals regulated under EPCRA HS are defined in EPA document EPA 550-B-98-017, Title III List of List, Consolidated List of Chemicals Subject to the Emergency Planning and Community Right to Know Act and Section 112(r) of the Clean Air Act Amended.
(d) The contractor is responsible for knowing which chemicals it uses or transports that are contained on the list. For convenience, the contractor may review a copy of the EPA document at the Directorate of Public Works (DPW) Environmental Division. The document can also be downloaded from the U.S. Environmental Protection Agency (EPA) at: http://www.epa.gov/oppt/pubs/genpub.htm.
(e) The contractor must maintain copies of Material Safety Data Sheets (MSDS’s) of all chemicals used in the performance of any work while on USAG-HI installations. MSDSs must be readily available at the site location where the work is being performed.
(f) The contractor can request the list and locations of EPCRA HS currently utilized on USAG-HI installations by contacting the DPW Environmental Division EPCRA Program Manager. The contractor must provide name, company, contract number, date the contract was awarded and provide a description of the contract. A database of locations of chemicals will then be forwarded upon review and approval of request. Contractors working on USAG-HI installations are encouraged to review this database, which will provide information where potentially hazardous chemicals are stored.
(g) All spills of substances containing EPCRA HS will be immediately reported to the Directorate of Public Works Spill Response line at 808-656-1111 and the USAG-HI, Public Affairs Office at 808-656-3160 or 808-542-9489 (after hours). The Contracting Officer must be notified during the first business hour immediately after. All waste generated from EPCRA HS being utilized will be immediately reported to the DPW Environmental Office, phone: 808-656-2878.
(h) All Contractors utilizing substances containing EPCRA HS will perform the following prior to contract start.
(1) Review the Installation Spill Prevention, Control, and Countermeasures (SPCC) Plan and the Installation Hazardous Waste Management Plan – USAG-HI Regulation 200-4 available from the DPW Environmental Division. Upon review, the contractor or designated responsible employee shall sign a certification statement that they have reviewed and understand the contents of these documents.
(2) Provide a listing and MSDS copies of oil and Hazardous Substance (HS) products projected to be utilized in the performance of any work while on USAG-HI installations to the DPW Environmental Division. The estimated average and maximum quantities of each material anticipated to be on-site at any given time shall also be provided to the DPW Environmental Division EPCRA Program Manager, STOP 253, 3rd Floor, 948 Santos Dumont Ave., Wheeler Army Airfield, phone 808-656-2878 and to building 6040 East Range for material to be bar-coded. The contractor must ensure the product listing is current and updated as frequently as necessary and/or at a minimum, on an annual basis by 1 January of each year.
(3) Provide the name, office phone number, and cellular phone number of a company spill response point of contact. The point of contact must be trained in spill response.
(4) Provide a copy of an agreement with a hazardous materials spill response company in the event of a spill.
(5) Provide copies of employees training certificates on environmental and spill response training.
(6) Appoint a primary and alternate Environmental Compliance Officer in writing.
(7) Develop a notification procedure in the event of a spill to include phone numbers of response personnel, support agencies, National Response Center, State Hazard Evaluation Emergency Response Office and Civil Defense.
(8) Accomplish all spill notifications as required by the U.S. Environmental Protection Agency and State of Hawaii to the Hazard Evaluation Emergency Response Office, Local Emergency Response Commission and National Response Center. Copies of written spill notifications shall be provided to the DPW Environmental Division.
(9) All spills caused by the contractor will be cleaned up under supervision of the contractor and a qualified hazardous materials spill response company, at no cost to the government, in accordance with all applicable laws and regulations and to the satisfaction of the DPW Environmental Division.
(10) The contractor shall pay for disposal cost of all contaminated materials to include but not limited to soil, sorbent materials, disposable equipment and other materials contaminated by the spill. Ensure all disposals are in accordance with all applicable laws and regulations at authorized disposal facilities.
6.2 SPILLS OF PETROLEUM/OIL/LUBRICANTS OR HAZARDOUS MATERIALS/HAZARDOUS WASTE.
(a) The contractor will prepare and maintain a site-specific spill plan, including notification procedures for spills/releases. The spill plan will include phone numbers of response personnel, support agencies, National Response Center, State Hazard Evaluation Emergency Response Office and Civil Defense. The contractor will provide a copy of the spill plan to DPW Environmental Division upon request.
(b) The contractor shall provide immediate response to stop, contain, and clean-up all spills of oil and other hazardous substances that result from his performance under this contract.
(c) The contractor must report all spills immediately to the DPW Spill Response line at 808-656-1111 in accordance with the Installation SPCC Plan. Additionally, the contractor shall notify the COR of the incident during normal business hour or the first business hour following the incident.
(d) The contractor will accomplish all spill notifications and written spill reports as required by the U.S. Environmental Protection Agency, State of Hawaii Hazardous Evaluation Response Office, Local Emergency Planning Commission and National Response Center, in accordance with applicable laws and regulations.
(e) The contractor will provide a copy of spill notifications and written reports to the DPW Environmental Division.
(f) All spills caused by the Contractor will be cleaned up under the supervision of the Contractor and/or a qualified hazardous waste/materials spill response company, at no cost to the USAG-HI, in accordance with all applicable laws and regulations and to the satisfaction of the DPW Environmental Division. If cleanup is not accomplished in a timely fashion, or to the satisfaction of the DPW Environmental Division, the Government will assist with the final cleanup, and the Contractor will provide appropriate reimbursement of cleanup costs.
(g) The contractor will pay for all clean up, management, and disposal cost of all contaminated materials to include but not limited to soil, sorbent materials, disposable equipment and other materials contaminated by the spill. The contractor will ensure waste disposal is accomplished in accordance with all applicable laws and regulations and at an authorized/permitted treatment and disposal facilities.
(h) The contractor will pay any fines or penalty charges associated with a citation issued by federal, state or local officials as a result of the accident.
(i) Contractors handling bulk fuel must be trained to do so, and mobile fuel operations must be approved by the DPW Environmental Division.
(j) Off-Post Spills. The contractor shall be responsible for and pay for cleanup of off-post spills in accordance with directions received from appropriate local authorities (e.g., Honolulu Fire Department, State Civil Defense, etc.). Off-post spills in connection with work performed under this contract shall also be reported to the DPW Spill Response line at (808) 656-1111 and the COR.
(k) Discovery of other than contractor-caused spills. The contractor shall report any spills of hazardous materials to the DPW Spill Response line at 808-656-1111 and the COR upon discovery.
6.3 HAZARDOUS WASTE (HW) and NON-REGULATED WASTE (NRW).
(a) The Contractor will comply with the Environmental Compliance and Protection Program Policy Memorandum USAG-HI-4.
(b) The Contractor will determine, based on generation of hazardous waste(s) resulting from their operation/activities their respective hazardous waste generator status. The contractor is responsible to manage HW and NRW generated on-site from inception to disposal in accordance with all applicable, federal, state, and local regulations. All costs associated with disposal are borne by the Contractor.
6.4 RECYCLING PROGRAM.
(a) The contractor will comply with USAG-HI Policy Memorandum 11, Solid Waste Management and Recycling, requiring diversion of solid waste to the fullest possible. More information can be found on the installation sustainability and environmental management website at: https://home.army.mil/hawaii/index.php/my-fort/services/recycling-center
(b) Identify a recycling POC to DPW Environmental Division to include name, phone number and email address.
(c) Report quantities of refuse disposed and recycled to DPW Environmental Division as part of the work performed under this contract as applicable.
6.5 NATURAL AND CULTURAL RESOURCES PROGRAM.
(a) The contractor will comply with USAG-HI Range Standard Operating Procedures (SOPs). All personnel who use the ranges must complete a mandatory pre-brief covering issues associated with Natural and Cultural Resources.
(b) The contractor must be cognizant of the potential environmental impact and liability their actions could have, if specified procedures are not followed on Army lands. The contractor must be aware that USAG-HI manages more than 100 threatened and endangered species including plants, snails, birds, bats, insects and their critical habitat and over 1,300 prehistoric archaeological sites, including temple structures, stone markers, fishing shrines, habitation sites, caves, rock shelters, mounds, burial platforms, earth ovens, stone walls and enclosures, agricultural terraces, irrigation canals, petroglyphs and trails.
(c) The contractor shall take every precaution to prevent starting wildfires at training areas and must put them out if they do occur. The contractor must report all wildfires to range control immediately at 808-655-1434.
(d) The contractor must be familiar with the policy and restrictions regarding the types of ammunition that can be used under the different Burn Indices (BI) and on the different ranges.
(e) The Contractor must comply with the non-smoking policy and only allow smoking in designated areas.
(f) The contractor must comply with the range best management practices to prevent the spread of invasive plant species from one training area to another by always washing vehicles, gears and equipment before starting new training activities.
(g) The contractor will stay out of areas marked with Seibert Stakes. Seibert stakes are placed along roads and within vegetated areas to advise personnel of unsafe or hazardous range or training conditions and/or environmentally sensitive off-limit areas.
(h) The contractor will refer to the installation sustainability and environmental management website at: https://home.army.mil/hawaii/index.php/garrison/dpw/natural-resources and https://home.army.mil/hawaii/index.php/garrison/dpw/cultural-resources for additional information.
6.6 NATIONAL ENVIRONMENTAL POLICY ACT (NEPA).
As applicable, and upon request by the Government, the contractor will comply with the NEPA process, notify the DPW Environmental Division and complete a Record of Environmental Consideration (REC) for actions such as, but not limited to:
(1) Actions that could impact historic structures, cultural and natural resources
(2) Minor renovation or new construction
(3) Actions that introduce new training vehicles, maneuvers, and weapons
(4) Replacing or removing floor tiles, ceiling tiles, sound proofing material, lighting fixtures, carpet, serving line equipment, natural gas unit
(5) Installing interior doors, windows, partitions, security cameras, rerouting ductwork
6.7 SELF-HELP PROJECTS.
(a) While performing work and/or occupying facilities on any US Army Garrison, Hawaii (USAG-HI) installations, the contractor will consult with the DPW Environmental Division before beginning any self-help projects for guidelines on how to comply with historical property requirements and for verification of potential asbestos, lead-based paint and other environmental health hazards associated with the proposed self-help project.
(b) You can read more about asbestos and lead-based paint at: https://home.army.mil/hawaii/application/files/3615/5562/1128/AsbestosLeadPaint-2017-GW.pdf
6.8 ENERGY AND WATER CONSERVATION.
(a) Upon request by the Government, the contractor will appoint a Unit Energy Conservation Officer (UECO) and Building Energy Monitor (BEM) and fully participate in the Garrison's energy and water conservation program.
(b) Appointed BEM and UECO must attend the training class provided by the DPW Engineering Branch.
(c) The appointed UECOs and BEMs are responsible for ensuring energy-saving measures are being enforced in each building and to provide regular reports to DPW Engineering Branch showing how well the contractor is doing at conserving energy.
(d) More information can be found on the installation sustainability and environmental management website at: https://home.army.mil/hawaii/index.php/garrison/dpw/environmental-a-z
6.9 PRECAUTIONS FOR THE PROTECTION OF EXISTING UTILITIES (INCLUDES COMMUNICATIONS) AND FACILITIES.
(a) Contractors are required to ensure necessary precautions and obtain required permits to protect government utilities and facilities. Contracts involving dredging, excavating, blasting and grading operations, demolition of structure and the moving of heavy and/or bulky equipment shall be subject to the following procedures and conditions:
(1) The Contractor shall obtain a written concurrence of the existing conditions and locations of utilities for his operations from the COR prior to beginning work and request the best information available on the location of Engineer facilities. Contractor shall verify locations of all utilities identified by the Government which affect his work.
(2) The Contractor shall be required to obtain a written clearance for his operations prior to beginning work and shall have locations of signal underground facilities staked out in the field from the 30th Signal Battalion/Network Enterprise Center-Hawaii (NEC-HI), EMC, IMG (Army Telephone, Data/LAN): Bldg. 600, Room 157, 148 Curtis Loop, Wheeler Army Airfield. Mr. Eugene Brown, (Primary AO) 808- 656-6656; Marion F. Robinson, Jr., (808) 656-1765 (Alt AO). Business Hours: Mon - Fri. 0830-1700.
(3) If any cable/conduit is uncovered or damaged during excavation process, immediately contact:
(i) the JHITS trouble desk, 808-659-1444
(ii) the NEC-HI RNOSC, 808-655-2999, with detailed information on situation
(iii) the NEC-HI POCs (above) with reported dates, times and details.
(4) The Contractor shall also obtain a written clearance for gas line for these operations from The Gas Company (Tel: 808-594-5575) prior to beginning work and shall have locations for underground facilities staked out in the field by Gas Company personnel.
(5) Additional Digging Information: At least five days prior to digging please call the number below. Government Agency and Contact Person: Hawaii One Call Center Phone Number: 1- 866-423-7287.
(b) The Contractor shall be liable for damages resulting from his failure to comply with (1), (2), (3) or (4) above.
6.10 AMC-LEVEL PROTEST PROGRAM.
(a) If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC.
(b) The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO.
(c) The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:
Headquarters U.S. Army Materiel Command Office of Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840
(d) The AMC-level protest procedures are found at: http://www.amc.army.mil/connect/legal-resources/ If Internet access is not available, contact the Contracting Officer or HQ, AMC, to obtain the AMC-Level Protest Procedures.
6.11 ACCESS TO ARMY INSTALLATIONS – PERSONNEL AND VEHICLES.
ACCESS TO ARMY INSTALLATIONS – PERSONNEL AND VEHICLES.
The Government recognizes the important roles companies like you play in our day-to-day operations. That is why USAG-Hawaii is enhancing the current access control solution called the Automated Installation Entry (AIE) Program. This program supports the security requirements while offering a streamlined access procedure for vendors, contractors, sub-contractors, suppliers and service providers. This program is available to new and existing personnel who require access to USAG-Hawaii and are not authorized to receive a Department of Defense CAC and desire a streamlined entry into the installation. Sponsorship and participation at each USAG-Hawaii location (e.g., Schofield Barracks, Wheeler Army Airfield, Fort Shafter, Tripler Army Medical Center, Pililaau Army Recreation Center and Pohakuloa Training Area) is required.
AIE Credential holders may access the installation through any of the USAG-Hawaii Gates that size allows and will only be subject to random inspections.
Companies that choose not to participate in the AIE Program will have limited access through the Schofield Barracks Lyman gate, Fort Shafter’s Buckner Gate and Tripler Army Medical Center Main Gate. All employees will be required to go through the inspection area and will be subject to the standard access control procedures, security screenings, and/or vehicle inspections.
*Access control changes can occur at any time due to security requirements Companies that service USAG-Hawaii facilities may initiate enrollment in the AIE Program by contacting the Contracting Officer’s Representative (COR).
If you have questions regarding the AIE Program at USAG-Hawaii, please contact Security Branch Operations, at 808-656-0232.
AIE Program Enrollment Process for Background Check and Process to obtain AIE Badge
Enroll your company by contacting the COR who will be the Sponsor. The COR will provide the excel spreadsheet for the list of contractor employee information. The following information is required from the contractor: last name, first name, date of birth, status, social security number, company name, and contract number. The COR will complete the Sponsor information and provide the list to the Directorate of Emergency Services (DES) Access Control Division. The DES will conduct the background check to vet personnel prior to arrival to pick up their AIE Badge and will ensure a more efficient process while saving time. The AIE Program performs background screening and credentialing.
DES will contact the COR (Sponsor) once the background checks have been validated to schedule a time for the contractor employees to go to one of the registration locations and complete the process to obtain the AIE Badge.
Contractor employees should bring an acceptable form of identification (see List A and List B) to the appointment. Upon arrival, a photo will be taken to complete the process. Employees will be issued their AIE Badge, which they will use for access to the installation.
Forms of Acceptable Identification for picking up your credential:
List A - One (1) needed
U.S. Passport (unexpired)
Permanent Resident Card or Alien Registration Receipt Card (Form I-551)
Unexpired foreign passport, with I-551 stamp or attached Form I-94 indicating unexpired employment authorization
Unexpired Employment Authorization Document that contains a photograph (Form I-766, I-688, I688A, I-688B)
List B – Two (2) needed
Driver’s license or ID card issued by a state
ID Card issued by federal, state or local government agencies or entities
School ID card with a photograph
Voter’s registration card
U.S. Military card or draft record
Military Dependent’s ID card
U.S. Coast Guard Merchant Mariner Card
Native American tribal document
Driver’s license issued by a Canadian government authority
U.S. Social Security card issued by the Social Security Administration
Certification of Birth Abroad issued by the Department of State (Form FS-545 or Form DS-1350)
Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal
U.S. Citizen ID Card (Form I-197)
ID Card for use of Resident Citizen in the United States (Form I-179)
Unexpired employment authorization document issued by DHS (other than those listed under List A)
6.12 DOD LEVEL I ANTITERRORISM (AT) STANDARDS.
Pursuant to Department of Defense Instruction Number 2000, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a Federally controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion.
Standard Contract Language Provision/Contract Clause Applicability and/or additional SOW language. Detailed information on each of these items are stated below. Applicable items to this contract action are indicated below.
__x__ 1. AT level I Training (general).
__x__ 2. Access and general protection policy and procedures.
_____ 2a. For contractor requiring Common Access Card (CAC).
__x__ 2b. For contractor that do not require CAC, but requires access to DoD facility or installation.
_____ 3. AT Awareness training for contractor personnel traveling overseas.
___x_ 4. iWatch training.
_____ 5. Army Training Certificate Tracking System (ACTS) registration for contractors who require access to government information systems.
_____ 6. For contracts that require a formal OPSEC program.
___x__ 7. For contracts that require OPSEC training.
______ 8. For Cyber Awareness (Information assurance (IA) /information technology (IT) training).
______ 9. For Cyber (Information assurance (IA) /information technology (IT) certification).
______ 10. For contractors authorized to accompany the force.
______ 11. For contract requiring performance or delivery in a foreign county.
______ 12. For contracts that require handling or access to classified information.
______ 13. Threat Awareness Reporting Program.
______ 14. For contracts that require delivery or food and water.
Applicable items to this contract action are indicated below.
See below for definitive language for each of the items listed above.
1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://jko.jten.mil/
2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
2b. For contractors that do not require CAC but require access to a DoD facility or installation. Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190 13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
4 iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
iWATCH within the Army is a nation-wide modern version of a neighborhood watch program focused on the threat of terrorist activity. It is an antiterrorism awareness program that the contractor’s workforce, while on Army installations, must all be familiar with to promote and enhance reporting suspicious activity or behavior. The program has two elements: “passive” and “active.” The passive element is an individual’s situational awareness of his or her surroundings. The active element of IWatch involves individuals taking action to report suspicious behavior or activities to law enforcement for more investigation.
5. For contracts that require a formal OPSEC program. The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.
6. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
6.13 SAFETY REQUIREMENTS.
(a) The Contractor shall implement a safety program conforming to the requirements of Federal, State and Local laws, rules and regulations. The program shall include, but is not limited to, the following, as applicable:
(1) U.S. Department of Labor Occupational Safety and Health Standards, at: http://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910
(2) U.S. Army Corps of Engineers, Safety and Health Requirements Manual Engineering Manual 385-1-1, 15 SEP 08, “https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/”
(3) Unified Facilities Criteria, Fire Protection Engineering for Facilities, UC 3-600-01, 8 Aug 2016, https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-600-01
(4) Air Force Instruction 32-2001, Fire Emergency Services Program, 30 Sep 2010, https://www.wbdg.org/FFC/ANG/ANGI/AFI_32-2001.pdf
(b) The contractor must submit a safety plan and job hazard analysis in accordance with EM 385-1-1, 30 Nov 2014, for all construction projects. The safety plan shall be submitted within 30 days of award or 7 working days prior to commencement of on-site work, whichever occurs first.
(c) For service, supply, and research and development contracting actions. Compliance with this manual shall be a contract requirement for such activities unless technical representatives (in coordination with safety and health professionals) advise that special precautions are not appropriate due to extremely limited scope of services or similar. However, it is understood that this manual in its entirety may be too complex for the type of work being performed under these contracts. These contractors may reference Appendix A, paragraph 11 of Health Requirements Manual Engineering Manual 385-1-1, 30 Nov 2014, "https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/” for limited scope Accident Prevention Plan (APP).
6.14 ACCIDENT PREVENTION AND SAFETY REQUIREMENTS.
(a) The contractor is responsible for implementing standard commercial practices for accident prevention and safety practices and compliance with para.b of this clause when performing the requirements stipulated in the statement of work or performance work statement of this contract. Therefore, upon commencement of work, the Contractor shall initiate an accident prevention and safety program applicable to the work to be performed under this contract. Further, the Contractor shall conduct a safety orientation for all employees immediately following their employment under this contract. The Contractor shall provide all occupational health services to his employees. Contractor employees shall be instructed to notify the Contractor's Project Manager of potential or existing occupational health hazards that require attention.
(b) The Contractor shall comply with the requirements of the Department of Labor Occupational Safety and Health Act (OSHA) and the Hawaii Occupational Safety and Health Law as administered by the Division of Occupational Safety and Health, Department of Labor and Industrial Relations, State of Hawaii.
(c) Government emergency vehicles and medical personnel may be used in emergency situations affecting Contractor personnel whose life may be in danger. Government facilities may be used in these instances as the first point of treatment. Transfer to other than Government medical treatment facilities shall be affected as soon as possible and as determined by attending medical authorities. Contractor employees and not the Government will bear all medical expenses.
(d) The Federal OSHA (Public Law 91-596) requires the reporting of all occupational injuries and illnesses. This OSHA requirement applies to all Contractors as well as subcontractor personnel.
(1) When required, the Government will prepare for the Contractor DD Form 689, Individual Sick Slip (in trip) for presentation to the medical treatment facility.
(2) DA Form 285, "United States Army Accident Investigation Report" be furnished by the Government, will be utilized by the Contractor to report all occupational injuries and illnesses whether there is lost time or no lost time, in accordance with Army Regulations 385-40.
(3) The Contracting Officer’s Representative of the Contracting Officer or his authorized representative will investigate the accident and complete DA Form 285 within seven (7) calendar days and forward the original and two (2) copies of the form through the Contracting Office to the Installation Safety Officer.
6.16 REQUIRED INSURANCE.
(a) Insurance -- Work on a Government Installation, in solicitations and contracts if a fixed-price contract is contemplated, the contract amount is expected to exceed the simplified acquisition threshold, and the contract will require work on a Government installation, unless –
(1) Only a small amount of work is required on the Government installation (e.g., a few brief visits per month); or
(2) All work on the Government installation is to be performed outside the United States and its outlying areas.
(a) The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
AMOUNT
| TYPE |
| PER PERSON |
| PER ACCIDENT |
| PROPERTY |
Comprehensive General Liability:
$500,000
| Comprehensive Automobile Liability |
| $200,000 |
| $500,000 |
| $20,000 |
Workmen's Compensation and Liability Insurance: As prescribed or required by law, with minimum employer liability limit of $100,000 for accidental bodily injury or death, or for occupational disease.)
(b) Prior to the commencement of work, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.
(c) The Contractor agrees to insert the substance of this clause, including this paragraph (c) in all subcontracts hereunder.
(d) It is the contractor’s responsibility to insure the following changes are incorporated into their submitted Certificate of Insurance:
1. The Contract Number must appear in the body of the Certificate of Insurance.
2. The Certificate holder name shall read:
Army Materiel Command Regional Contracting Office, Hawaii 413th CSB
3. The certificate shall be provided to the following address
413th Contracting Support Brigade Regional Contracting Office, Hawaii Contracting Operations Division 742 Santos Dumont Avenue Bldg 108, 3rd Floor (Wheeler Army Airfield) Schofield Barracks, HI 96857
(e) For all contractors using the ACORD form dated earlier than October 2009, the Certificate of Insurance cancellation statement shall be revised as follows: Delete the words “endeavor to” and “but failure to do so shall impose no obligation or liability of any kind upon the insurer, its agents or representatives.” The Certificate of Insurance cancellation statement shall then read: “Should any of the above-described policies be cancelled before the expiration date thereof, the issuing insurer will mail 30 days written notice to the certificate holder named to the left.”