Runway Weather Information System Federal contract opportunity
Solicitation number
FA860120Q0162
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Runway Weather Information System, newest first.
File Type Posted
RFQ Sheet RWIS.pdf PDF
RWIS SSJ Signed for redaction.pdf PDF
Solicitation - FA860120Q0162.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28 Aug 2020

Performance Work Statement (PWS) for

Road Weather Information System (RWIS) Maintenance

1.0 Scope

The Road Weather Information System (RWIS) at Wright-Patterson Air Force Base (WPAFB) consists of proprietary equipment and software. Through a series of atmospheric sensors and sensors buried in the runway pavement, data is collected by Remote Processing Units (RPUs) which transmit the data over radio to a Central Processing Unit (CPU). The CPU converts the data which is displayed in tables, charts, and maps. The information provided to the CPU displays the surface temperature and provides the chemical factor of the runway pavement at the sensors. Sensors indicate whether dry, wet, chemicals, or presence of ice. Using this data, new pavement freezing temperatures can be calculated through algorithms contained in the software. The atmospheric sensors record and maintain the history pavement surface conditions. The hardware/software for this system is licensed by Vaisala Inc.

There are seven sensors located on runway (RWY) 05L/23R which collect the runway surface condition information that relay real time information back to one of the two (2) RPU sites located on the airfield. Each site house contains one motherboard which collects all seven (7) sensor readings and transmits real time data back to the main server located in England and provided to the Government through a web-based program called Navigator 2.0.

2.0 Period of Performance

This contract will have a period of performance of a six (6) month base year from 13 October 2020 through 12 April 2021, as well as four (4) 1-year Option Years to follow.

3.0 Requirement

The contractor shall provide extended warranty coverage for the RWIS hardware only.

All initial repair service will be handled by 88 OSS/OSM personnel. This contract shall include three (3) reactive on-site repair visits and one (1) annual preventive maintenance visit. The contractor shall also provide the Navigator Data Management and Communication cellular charges to communicate to the two (2) server sites. Contractor shall provide technical support and monitor the Navigation Data Management system twenty four hours a day, seven days a week (24/7). Contractor shall immediately reset and troubleshoot system and notify the user of status or situation. Catastrophic failure shall be addressed immediately. If contractor determines equipment failure, parts shall be identified and shipped to 88 OSS/OSM for installation.

a. Replacement Parts, Tools, and Instruments: Only new standard parts or parts equal in performance to and interchangeable (without alteration) within new parts shall be used in performing repairs. Installed and replaced parts shall become property of the Government.

b. Point of Contact: The Contractor shall identify a single Point of Contact for service calls.

c. Contractor Response Time: The Contractor shall respond to all service requests by telephone notification/acknowledgement within 24 hours after the call is placed. The Contractor shall assist in maintenance trouble-shooting and repair of equipment via telephone within the first 24 hours. If contractor is unable to troubleshoot and assist 88 OSS/OSM in resolving the issue, contractor shall respond for a reactive on-site repair visit within five (5) business days.

4.0. Special Requirements

Software Maintenance: The contractor shall keep current on all software updates issued by the Vaisala Inc and notify 88 OSS/OSAM and OSS/OSM when software updates are issued. The Contractor shall maintain data updates via remote locations. Onsite will be maintained by OSS/OSM personnel at the direction of contractor. Notification shall include description of change and recommendation if it should be installed. The Contractor shall implement software updates. Installed software updates become property of the Government.

5.0 Installation Access

a. Security Clearance: Requirement for security clearance is not anticipated. If, however, security clearance is determined to be necessary, the Contractor shall ensure that maintenance personnel complete all security forms (personal history, fingerprint card, and other applicable details) within thirty (30) calendar days following notification of the requirement from the Government.

b. Laws and Regulations: All contractor personnel performing work under this contract shall comply with all applicable Federal, State, and local laws, as well as all Air Force and local regulations. Of specific concern are regulations regarding security, wearing of badges, access lists, and safety.

c. Contractor Access: Subject to security regulations, the Government will permit the

Contractor access to the equipment to be maintained.

d. Delivery Procedures for Commercial Vehicles: All vehicles larger than a large pick-up truck are required to be inspected by the Wright-Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the Installation.

Vehicles to be inspected include, but are not limited to, the following:

1. Step van/panel truck

2. Tractor/trailer, box and flat-bed containing cargo

3. Tanker trucks

4. Box trucks

5. Tour buses

6. Garbage/recycled waste trucks

7. Concrete trucks/mixers, dump trucks

8. Cranes, recreational vehicles, petroleum tanker

This inspection will be conducted at Gate 26A located off State Route 235. The following are exemptions to vehicles utilizing the CVDG:

If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration, it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security Numbers, and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kitty hawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.

Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM). Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

File details come from the government source that posted it. Updated .