PWS Revised.pdf
PDF 338 KB Posted
- Solicitation number
- 75898
About this file
This document is a Performance Work Statement (PWS) for a Turnkey Gantry-Style Ultrasonic Non-Destructive Testing (NDT) Inspection System for preventative maintenance and calibration services at Robins Air Force Base.
The key details are:
- The contractor shall provide all travel, labor, tools, parts, equipment, materials, and supervision for preventative maintenance and calibration services on two specific Gantry-Style Ultrasonic NDT Inspection Systems located in Buildings 169 and 323.
- The services shall include bi-annual mechanical inspections, software updates, 24/7 phone support, and annual instrument calibration.
- The contractor shall maintain spare parts and provide a spare UT instrument set to prevent downtime.
- The contract is a base year with four one-year option periods.
- The government representatives are Charles Poole and Micah Graves.
- The work will be performed on-site at Robins Air Force Base, Georgia during normal business hours.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Turnkey Gantry-Style Ultrasonic Non-Destructive Testing (NDT) Inspection System for Preventative Maintenance and Calibration
23 August 2024
1.0 DESCRIPTION OF SERVICES. The contractor shall provide all travel expense, qualified technician(s), tools, parts, equipment, materials, disposable supplies, and supervision for Turnkey Gantry-style Ultrasonic NDT Inspection System Service Plan for preventative maintenances and calibrations in Building 169 and 323 for 402nd Maintenance Support Group (MXSG), Robins Air Force Base.
Systems:
Equipment Number Serial Number Location - Robins, AFB
RP12170 9904-1979 Building - 323 WR006172 6624 Building - 169
1.1 Preventive Maintenance (PM). The Contractor shall contact government POC within five (5) days after contract award to schedule the Preventative Maintenances:
Table 1: Preventative Maintenance:
Service Description Frequency
Mechanical Inspect • System mechanical accuracy report performed at calibration service.
• Compensation table adjustments performed with mechanical accuracy test.
• Inspect and tighten timing belts.
• Inspect and lubricate acme and recirculating ball lead screws.
• Check system functionality and perform mechanical accuracy test.
• Verify instrument calibration status.
Bi-Annually (see paragraph 1.1.1)
Software Check • Software bug fixes.
• Provide computer operating system updates as required and evaluate obsolescence.
• Observe operator inspection product to verify system operation.
Bi-Annually
24/7 Phone Support • 24-hour emergency response for telephone, remote internet support and schedule on request
As required
• Preferred customer emergency service response
Instrument Calibration
• Mechanical laser alignment and position compensation table mapping and UT instrument calibration
• System Software Upgrade
ANNUALLY
1.1.1 The contractor shall perform the On-site Bi-annually Mechanical Inspect schedule as following: Building 323 during the 1st and Building 169 during the 3rd quarters of this contract Period of Performance (PoP) years. Contractor shall arrange all visits with POC in paragraph 4.1.
1.2 Instrument Calibration Certificate: Within ten (10) days after completion of the maintenance and calibration, the Contractor shall electronically send the certificates as a PDF to the Government POC in paragraph 4.1. (CDRL A/B/C/D/E 001, Calibration Certificate DI-
QCIC-80798C/T).
1.3 Maintenance Spare Parts Warranty: The Contractor shall warrant all maintenance spare parts manufactured and supplied for material defects in material and workmanship for a period of 90 days following repairs on WR-ALC/ CMXG Turnkey Gantry-style Ultrasonic NDT Inspection System Service Plan for Building 169 and 323.
1.4 Spare Parts Allowance for Tecnatom UT Instrument: The contractor shall provide a set of backup UT instruments. This will allow for rotating annual instrument calibrations to prevent any downtime and provides insurance from unexpected failures. The Contractor shall secure 1(one) each SONIA UCM Control Module and 2 (two) each SONIA FPR-8A UT Module dedicated to the WR-ALC/ CMXG Turnkey Gantry-style Ultrasonic NDT Inspection System Service Plan for Building 169 and 323. The spare UT set can be used in a 3-way rotation between both machines.
1.5 Systems spare parts: The contractor shall purchase spare motors/drives and harmonic gear reducers and linear rail and bearings for emergency repair. The contractor shall secure in a secure location dedicated to the WR-ALC /CMXG Turnkey Gantry-style Ultrasonic NDT Inspection System Service Plan for Building 169 and 323. See PWS 5.1- Spare Parts List.
1.6 Over & Above Work and New Equipment Installations. During the course of the contract, there may be times when services or other system support not forecasted may be required. In addition, Air Force mission requirements may dictate the need for new equipment installations. Under these circumstances, the Government Representative for the organization affected is responsible for notifying the COR and providing specific details of the requirement so the COR can surveil the work if necessary and provide feedback to the Government Contracting Officer. In addition, the Contractor shall prepare and submit a detailed cost estimate identifying the work to be performed to the COR. The COR will provide the estimate to the Government Contracting Officer, who will review the estimate, negotiate a formal quote and authorize the work to be completed. Once the Government Contracting Officer authorizes the work, the Contractor shall schedule a date and time to perform the work with the Government Representative of the organization affected.
At a minimum, estimates for new installations shall contain the following information:
• Specific location of the work
• Information describing the type of work required.
• Equipment to be installed.
• All costs of performing the work to include estimated labor hours, travel, equipment, and material.
• Warranty information
• Preventive maintenance costs and frequency of maintenance once the warranty period expires.
2.0 SERVICES SUMMARY (SS).
Performance Objectives PWS Para. Performance Threshold
PM Mechanical Inspect 1.1.1
To be maintained not past 14 days of schedule unless production request. 2 site visits per year for regular
Instrument Calibration. 1.2 To be maintained not past 14 days of schedule unless production request.
3.0 GOVERNMENT FURNISHED PROPERTY (GFP). NONE
4.0 GENERAL INFORMATION.
4.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for MXSG. Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The following individuals will serve as Government Representatives for MXSG.
Primary Government Representative Alternate Government Representative Charles Poole Micah Graves Unit: 402 MXSG/MXDEQ Unit: 402 MXSG/MXDEQ
4.2 Shipping/Delivery/Period of Performance. The contractor shall coordinate delivery with
Government POC of ALL parts and equipment by email. This requirement consists of Basic year and 4 - one-year options. FOB destination.
4.3 Ship To Address.
Attention: Charles Poole Unit: 402 MXSG/MXDEQ
DODAAC: FD2041
Address:
Building 321, Floor 1, Warehouse
235 RICHARD RAY BLVD
Robins AFB, GA 31098
4.4 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.
4.5 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 169 and building 323 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 7:30 am to 4:00 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel and will provide a 48-hour notice prior to changing any work hours.
4.6 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday.
If the holiday falls on a Sunday, it is observed on Monday.
4.7 Security Requirements.
4.7.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part
Phone: 478-926-8851 Phone: 478-222-4075 Email: charles.poole.6@us.af.mil Email: micah.graves@us.af.mil mailto:charles.poole.6@us.af.mil mailto:micah.graves@us.af.mil
117, National Industrial Security Program Operating Manual (NISPOM), Air Force Instruction (AFI) 31-101, Integrated Defense.
4.7.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 2 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).
4.7.2.5 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA.
Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short-term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).
4.7.3 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB, or another Government facility comply with the OPSEC procedures of the facility.
4.7.4 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.7.5. Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations.
Contractor risk management procedures shall comply with:
Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle
Management, SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and
Electromechanical (EEE) Parts: Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev
5, Security and Privacy Controls for Information Systems and Organizations.
4.8 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.9 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry.
Information may be obtained by calling the following phone number: Commercial 478-222- 1972.
4.10 Quality Management System (QMS): The Contractor shall ensure the quality of services through a quality and/or inspection system. Within 42 days of contract award, the Contractor shall submit a Quality Control Plan (QCP) to the Government Representatives addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The plan shall include the schedule of quality assurance/control inspections planned by the Contractor. (CDRL A002, DI- QCIC-81722/T, Quality Program Plan)
4.11 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.11.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio-based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.12 Environmental Management System (EMS). Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
4.12.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926- 8178.)
http://www.biopreferred.gov/ mailto:78ceg.cev.FrontOfc@us.af.mil
4.12.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:
1. Hover your mouse over the Courses and Transcripts tab.
2. Click on Transcripts
3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
4. When you are on the transcript, click on the blue “Search for Course” button.
5. When the pop up appears enter the course name or course number and press search.
6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.
(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)
4.12.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil.
Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.
4.13 ISO 50001 – Energy Management System. Due to the WR-ALC being ISO 500001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
4.13.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.13.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.13.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.
4.14 Contractor Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:78ceg.cev.FrontOfc@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.14.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil.
The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A003, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.14.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
4.15 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926- 3567 after hours, within four (4) hours after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), Contract Surveillance Management Office (CSMO) Representative and the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
(CDRL A/B/C/D/E 004, DI-SAFT-81563 NOT 2, Accident/Incident Report) http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil
4.16 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.17 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:
https://piee.eb.mil/
4.18 Cybersecurity Requirements. The Contractor shall comply with the following cybersecurity requirements:
1. 48 CFR 52.204-21, Basic Safeguarding of Covered Contractor Information Systems.
2. 48 CFR 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
3. 48 CFR 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls.
4. 48 CFR 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting IT system that is compliant with National Institute of Standards and Technology (NIST) Regulations:
i. NIST Special Publication (SP) 800-171, Protecting Controlled Unclassified Information (CUI) in Nonfederal Systems and Organizations
ii. Data-in-transit using encryption that complies with Federal Information Processing Standards (FIPS) 140-2, Security Requirements for Cryptographic Modules
5.0 APPENDICES
5.1 Spare Parts List:
PART NUMBER DESCRIPTION POSITION QTY
BOTH BUILDINGS
** MOTION LOGIC
CONTROLLER
1 R911173004 CML75.1-3P-900-NA-
NNNN-NW
Main Electrical 1
MOTOR DRIVES AND
CONTROLLER ITEMS
https://piee.eb.mil/
2 R911338054 HCS01.1E-W00008-A-
03-E-S3-EC-NN-L3-NN-
FW
Main Electrical 1
3 R911296724 HMV01.1E-W0030-A-
07-NNNN
Main Electrical 1
4 R911172765 SAFETY GATEWAY -
SLC-3-GS3S00300
Main Electrical 1
5 R911172284 SAFETY CPU MODULE,
SLC-3-CPU000300
Main Electrical 1
6 R911339232 SERVO DRIVE
ACCESSORY, KCU02.2N-
ET-ET*-025-NN-N-NN-
NW
Main Electrical 1
** BEARING RAILS AND
BLOCKS
7 R165111420 Z-Axis Ball Rail Runner Block R165111420
KWD-015-FNS-C1-N-1,
CARBON STEEL, 15 MM,
FLANGED, NORMAL,
STANDARD HEIGHT,
LIGHT PRELOAD,
NORMAL ACCURACY
KWD-035-FNS-C1-N-1,
CARBON STEEL, 35 MM,
FLANGED, NORMAL,
STANDARD HEIGHT,
LIGHT PRELOAD,
NORMAL ACCURACY
9 R162121420 KWD-025-SNH-C1-N-1 -
25MM RAIL BEARING
BLOCK, SLIMLINE
** RACKS AND PINION
10 966673 RPS25 ISO MOUNT
PINION
11 966675 RPS20 PINION 1
12 966661 RPS20 RACK 1
13 966671 RPS 25 SERIES RACK 1
GEARBOXES
14 20092545 TPMP004S-070K-
06KO0-064-G4-KS1
GX 1
15 20092546 TPMA010S-154K-6KO1-
094A-W4
GZ 1
16 20031785 TP010S-MF2-16-0E1-2S YAXIS 1
17 20031859 TP025S-MF2-16-0G1-2S ZAXIS 1
** MOTORS
18 R911389460 KSM02.1B-076C-35N-
M1-HP0-ET-SD-D7-NN-
FW
X-AXIS 1
19 R911378395 KSM02.1B-A18-P-D7-
ET-ENH-SD-ES
+FWA-INDRV-MPB-
20VRS-D5-1-NNNNN
GX 1
20 R911377970 KSM02.1B-A18-P-D7-
ET-ENH-SD-TOFW
+FWA-INDRV-MPB-
20VRS-D5-1-NNN-NN
GZ 1
** MOTOR CABLES
21 R911333881 SERVO DRIVE CABLE,
RKH0212/008.70
BRIDGE 1 AND
2 JUNCTION
TO XAXIS(A)
22 R911372511 SERVO DRIVE CABLE
WITHOUT COMMS,
RKH0021/005.30
BRIDGE 1 AND
2 ZAXIS(A) TO
GX
NEARDRIVE(A)
23 R911172134 SERVO
COMMUNICATION
CABLE RKB0043/006.0
BRIDGE 1 AND
2 ZAXIS TO GX
NEARDRIVE
24 R911371429 SERVO POWER CABLE
RKL4305T/001.00
BRIDGE 1 AND
2 GX POWER
25 R911333881/001.00 ENCODER CABLE
RKG4201/001.00
BRIDGE 1 AND
2 GX ENCODER
** GREASE SYSTEM
26 96G182 LUBRICATION PUMP,
G3-G-24NC-2L0A00-
0D00L000
27 17L983 LUBRICATION PROX
SENSOR, PROX SWITCH
7/16-20 7500PSI
WATER SYSTEM
28 FMM50-1002 FLOW METER - 1/2NPT
- 0-6.6 GPM , 20-30VDC
** AIR KNIFE
29 900135960 PNEUMATIC
DIRECTIONAL VALVE -
VSW-2501-WS-16B-
31W
Z-ARMS 2
** ELECTRICAL / MISC.
30 2907077 UPS COMPLETE- 24VDC
POWER SUPPLY -
QUINT-
UPS/24DC/24DC/40AM
P
31 2904623 POWER SUPPLY -
QUINT 4 -
3AC/24DC/40AMP
32 2320319 7.2ah BATTERY ONLY -
UPS-
33 BI2-EG08-
RP6XV1131
PROX SENSOR -
INDUCTIVE - M8 -
STAINLESS - NC
CONTACT
34 BI2U-EG08-
AP6XV1131
PROX SENSOR -
INDUCTIVE - M8 -
STAINLESS - NO
CONTACT
35 6034867 RECEIVER - L41E-
21MA1A
36 6034866 SENDER - L41S-21MA1A
37 N320-25M FIBER OPTIC CABLE -
15M
38 BAE00EN POWER SUPPLY - BAE
PS-XA-1W-24-038-601
BUILDING 169
** MOTORS
39 R911389526 KSM02.1B-061C-35N-
M1-HP0-ET-SD-D7-NN-
FW
Y-AXIS 1
40 R911389527 KSM02.1B-076C-35N-
M1-HP2-ET-SD-D7-NN-
FW
Z-AXIS 1
** SERVO GEARBOXES
41 20031807 TP025S-MF1-10-0G0-2S X-AXIS 1
SERVO CABLES
42 R911333824 SERVO DRIVE CABLE -
RKH0011/012.70
BRIDGE 1 AND
2 X2 AXIS(A)
TO YAXIS(A)
** BEARINGS
43 R165131420 KWD-035-FNS-C1-N-1 X AND Y AXIS 8
GREASE SYSTEM
44 53160 AUTOMAIC RELEIF
INDICATOR
** WATER SYSTEM
45 97513359 CETRIFUGAL PUMP -
400V,3PH,1CMH
46 SMV30-SVE2 FLOW VALVE - 1/2" 1.5-
10VDC
** ELECTRICAL / MISC.
47 TCL 042-112-DC DC-DC CONVERTER,
12V, 2A, 18-75VDC
48 XCMD2101C12 LIMIT SWITCH - 1 NC 1
NO M12 CONN
49 CMV-C1X-4X INLET MODULAR PLATE
50 CMV-A1L-3A MODULAR VALVE
51 N320-05M FIBER OPTIC CABLE -
5M
52 N320-10M FIBER OPTIC CABLE -
10M
** UT INSTRUMENTATION
53 PE38515/HS-18 18" LONG 10-32 MALE
WITH RG316-DS COAX
BUILDING 323
** MOTORS
54 R914501802 KSM02.1B-061C-35N-
M1-HP0-ET-SD-D7-NN-
FW
Y-AXIS 1
55 R914501803 KSM02.1B-076C-35N-
M1-HP2-ET-SD-D7-NN-
FW
Z-AXIS 1
** MOTOR DRIVES AND
CONTROLLER ITEMS
56 R911338759 ENCODER EMULATION
DRIVE -
HCS01.1E-W0003-A-02-
B-ET-EC-EM-NN-NN-FW
- WITH FW 900197962
57 R911170753 PLC - I/O R-IB IL 24DI
32/HD-PC
58 R911172291 SLC-3-XTIO843021 - I/O
MODULE SAFETY LOGIC
59 R911172292 SLC-3-XTDI80302 - I/O
MODULE
60 R911172294 SLC-A-UE410-4RO4 -
SAFETY RELAY
** SERVO GEARBOXES
61 20031807 TP025S-MF1-10-0G0-2S X-AXIS 1
SERVO CABLES
62 R911333905 SERVO DRIVE CABLE -
RKH0214/018.30
JUNCTION TO
X-AXIS (A)
** BEARINGS
63 R165131220 KWD-035-FNS-C1-N-1 X AXIS 8
WATER SYSTEM
64 97513359 CETRIFUGAL PUMP -
400V,3PH,1CMH
65 QL-950 UV LAMP AND QUARTZ
SLEEVE
66 SMV30-SVE2 FLOW VALVE - 1/2" 1.5-
10VDC
67 LK1024 ELECTRONIC LEVEL
SENSOR
** ELECTRICAL / MISC.
68 2907946 MEASURING
INSTRUMENT - EEM-
MA770-PN
69 2277022 CURRENT
TRANSFORMER - PACT
MCR-V1-21-44-100-5A-
70 2903370 RELAY MODULE - RIF-0-
RPT-24DC/21
71 2910386 TYPE 1 SURGE
PROTECTION DEVICE -
VAL-US-480D/30/3+0-
FM
72 2905744 ELECTRONIC CIRCUIT
BREAKER - CBM E8
24DC/0.5-10A NO-R
73 2907625 CIRCUIT BREAKER- 32A
- TMC 83C 32A - 3POLE
74 2907612 CIRCUIT BREAKER- 6A -
TMC 83C 06A - 3 POLE
75 2907607 CIRCUIT BREAKER- 01A
- TMC 83C 01A - 3POLE
76 2907561 CIRCUIT BREAKER- 04A
- TMC 81C 04A - 1POLE
77 2907576 CIRCUIT BREAKER- 32A
- TMC 81C 32A - 1POLE
78 2907566 CIRCUIT BREAKER- 10A
- TMC 81C 10A - 1POLE
79 1105560 DIGITAL MODULE - AXL
SE DO16/1 NPN
80 2701686 BUS COUPLER -AXL F BK
S3
81 2701422 BUS CONNECTOR - AXL
BS BK
82 1088135 MODULE CARRIER - AXL
F BP SE4
83 1088062 I/O MODULE - AXL SE
A14 1 4-20
84 1088126 I/O MODULE - AXL SE
A04 U 0-10
85 1088127 I/O MODULE - AXL SE
DI16/1
86 GVME05 TESYS GV2 MANUAL
STARTER - 0.63 TO 1
AMP
87 GV2ME14 TESYS GV2 MANUAL
STARTER - 6 TO 10 AMP
88 LC1D09BD TESYS D CONTACTOR -
3P(3NO)- AC-3 440V
24VDC COIL
89 ZB4BW363 ILLUMINATED
PUSHBUTTON - BLUE
90 ZBVB6 BLUE LED
91 ZB4BZ009 CHROME MOUNTING
BASE
92 ZB4BG3 SWITCH - 22MM - KEY -
3POS - KEY REMOVAL
IN POS 2
93 ZBE101 CONTACT BLOCK - N.O.
94 ZBE102 CONTACT BLOCK - N.C.
95 XCMD2102C12 LIMIT SWITCH
96 FEN20-4IOL INDUSTRIAL ETHERNET
SWITCH - Compact IP20 Multiprotocol I/O Station 4-Link Master Channels
97 K30LGRYP MULTIFUNCTION
INIDACTOR LIGHT
98 SSA-EB1PLGR-
12ECQ8
ESTOP WITH
ILLUMINATION - 40MM
- RED GREEN
99 TCL 024-112 DC DC-DC CONVERTER,
12V, 2A, 18-75V
100 JDL40 FUSE - 40A - TIMEDELAY
- PK OF 10
101 AR22VQL-12EAR EMERGENCY STOP -
RED PUSHBUTTON -
40MM - ILLUMINATED
** AIR KNIFE
102 889053900 PROGRESSIVE
METERING VALVE -
MSP-NPT-MS-3-35S-
35S-15S
** UT INSTRUMENTATION
103 ABF.00.250.CTA RF Adapters - Between
Series BNC ADAPTER 50
OHM
| Performance Threshold |
| Performance Objectives |
File details come from the government source that posted it. Updated .