This document is a Performance Work Statement (PWS) for a contract to provide 8 non-CDL 16-26' refrigerated trucks, maintenance and towing support, and transportation services to support the 1st Stryker Brigade Combat Team (1SBCT), 4th Infantry Division during a training exercise at Fort Carson, Colorado from August 19 to September 9, 2024.
The key requirements are:
- Provide 8 fully functional non-CDL 16-26' refrigerated trucks
- Provide maintenance and towing support for the trucks
- Deliver the trucks to the 1SBCT Stack DFAC at Fort Carson by 1000 MST on August 19, 2024 and pick them up after the exercise
- Comply with quality control, safety, security, environmental, and training requirements outlined in the PWS
- The contract is a non-personal services contract, with the contractor accountable to the government but not under its supervision
The PWS provides details on the background, objectives, scope, quality control, government property and services, contractor-furnished items, specific tasks, and applicable publications. It also includes performance requirements and an associated performance requirements summary.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUG 22
PERFORMANCE WORK STATEMENT (PWS)
1SBCT Operation Summit Reefer Trucks
19AUG24-09SEP24
Part 1 General Information
1. General: This is a non-personnel services contract to provide 1SBCT, 4ID, Refrigerated Trucks for Operation Summit Exercise 19AUG24-09SEP24. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide 8 Non CDL 16-26’ Refrigerated Trucks, maintenance support, towing support, transportation of the 8 16-26’ Refrigerated Trucks, materials, tools, supplies, supervision, and other items and non-personal services necessary for 1SBCT to utilize the 8 Non CDL 16-26’ Refrigerated Trucks.
1.2 Background: 1SBCT is conducting a large-scale exercise that will take place from 19AUG24-09SEP24 and will be spread out over the Fort Carson training area. 1SBCT will need 8 Non CDL 16-26’ Refrigerated Trucks, to service 4 different locations.
1.3 Scope: The following is an outline of the products to be delivered. This product will be 8 Non CDL 16-26’ Refrigerated Trucks for 1SBCT in support of BDE FTX. The 8 Non CDL 16- 26’ Refrigerated Trucks will be delivered to the BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913 for use and returned to BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913 after the exercise.
1.4 Objectives:
• Provide 8 Non CDL 16-26’ Refrigerated Trucks
• Maintenance and Towing Support
• Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913
• Trucks will be delivered to above location at 1000 MST +/- 10 minutes on 19 August 2024.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within 10 days after date of contract award ,Provide 8 Non CDL 16-26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 5 working days. If the Government has provided comments, the Contractor shall then have 5 working days to submit a Final QCP.
After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 5 working days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items
(Paragraph 1.7 Key Control);
(f) How the Contractor will inventory and track maintenance of all Government Provided
Equipment / Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within 30 days upon completion of each option period or Provide 8 Non
CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 24 hours of identifying those issues. Verbal reports shall be followed up by written reports within 5 days or Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0800 to 1700, and Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.6.3.1 above.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0000 to 2400, the days Monday through Sunday and the facility is open during local or national emergencies, administrative closings, or similar Government directed facility closings.
The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: N/A
1.5.5 Training Holidays: FORSCOM has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday.
However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.5.6 Place of Performance: Fort Carson, Colorado, 80913.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: N/A
1.6.2 Personnel Security Clearance Requirements: N/A
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.6.3.1 Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 3 days after contract award, Provide 8 Non CDL 16- 26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
The log must at a minimum contain the following information full name, position title, social security number, contact telephone number, and contact email address. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log Provide 8 Non CDL 16- 26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 5 days Provide 8 Non CDL 16- 26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 5 days Provide 8 Non CDL 16- 26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.6.3.4 Common Access Cards (CAC) and CAC Log: N/A.
1.6.4 Background Checks: Contractor and all associated sub-contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to U.S background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity
Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within 5 days of receipt by the Contractor, identifying such with the appropriate contract number. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within 24 hours of receipt by the Contractor, identifying such with the appropriate contract number.
When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors that work with or teach youths under the age of 18 years are subject to background checks as determined by the Requiring Activity Manager. As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager current documents required for working on a US installation, no later than no later than five (5) days after contract award. Forwarding correspondence from the Contractors shall identify the associated contract number.
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use.
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.7 Key Control: N/A
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government: Program/Contract Manager/Alternate Program/Contract Manager, and Quality Control Manager. The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than 5 days. The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 24 hours. Qualifications for all key personnel are listed below:
a. Contract Manager and Alternate Contract Manager: CV provided by the Contract Manager and Alternate Contract Manager must demonstrate successful completion of 24 semester hours in mathematical, engineering, and quantitative analysis courses; 15 or more years cost analysis experience; familiarity with Defense Department Data Sources, and Earned Value Management (EVM).
b. Quality Control Manager: The Quality Control Manager must demonstrate a minimum of 5 years’ experience, within the past 10, working as a Quality Control Manager.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.13 Contractor Travel: N/A
1.14 Other Direct Costs (ODCs): Shipping of 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913., towing and repair of 8 Non CDL 16-26’ Refrigereated Trucks from wear and tear.
1.15 Data Rights: N/A
1.16 Non-Disclosure Requirements: N/A
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: N/A
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913. The http://www.dimoc.mil/resources/limitations/
Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase In /Phase Out Period: N/A
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting
Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen
(15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
http://www.usace.army.mil/
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than 5 days Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913. that such notifications were made.
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program:
If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer (KO)/Contracting Officer Representative (COR) of the types and amount of hazardous materials needed to be brought onto the Garrison in order to fulfill their contractual requirements. Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The KO/COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Fort Carson Colorado Installation and applicable United States environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the Department of Public Works (DPW) Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 719-526-5615.
The Contractor shall contact the COR or the Fort Carson Directorate of Public Works- Environmental Division (DPW), 719-726-8941.
Current Environmental Policy (Environmental Battle Book) is available at the Garrison website:
environmental-battlebook.pdf (army.mil)
1.23 Required Training: The following provides information on training requirements.
1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 5 days Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913. After contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 5 days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913 for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 5 days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913 every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 5 days after completion of the training Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 5 days of employment under this Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913. Verification of the training shall be provided to the COR within 5 days after completion of the training Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and https://home.army.mil/carson/application/files/4116/4976/7771/environmental-battlebook.pdf https://jkodirect.jten.mil/ pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months Provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913. Verification of the training shall be provided to the COR within 5 days after completion of the training Provide 8 Non CDL 16- 26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within 5 days after completion of the training Provide 8 Non CDL 16- 26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
1.23.3 iWATCH Training: N/A.
1.23.4 Information Assurance (IA) Training N/A.
1.23.5 Personally Identifiable Information (PII): N/A.
1.25 Notice to Proceed: (If applicable) the notice to proceed will be provided as indicated below. (Contracting Office must identify one)
☐The effective date of contract will constitute the date of notice to proceed
☐A notice to proceed letter will be issued
☐The date of the letter transmitting the contract will constitute the date of the notice to proceed
1.27 Government Property and Services: N/A.
http://www.cdse.edu/catalog/elearning/GS130.html
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract
Government Property - means all property owned or leased by the Government.Government property includes both Government-furnishedand Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate
IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services
3.1 Services: The Government will provide include personnel to receive the drop off and return of 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
3.2 Facilities: N/A.
3.3 Utilities: N/A.
3.4 Equipment: N/A.
3.5 Special Tooling and Test Equipment: N/A.
3.6 Materials: N/A.
3.7 Training: N/A.
3.8 Common Access Cards (CAC): N/A.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall provide 8 Non CDL 16- 26’ Refrigerated Trucks, Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
4.2 Secret Facility Clearance: N/A.
4.3 Materials: N/A.
4.4 Vehicles and Equipment: The contractor shall 4 fully functioning Non CDL16-26’ Refrigerated Trucks.
4.5 Background Checks): The Contractor shall provide Background Checks in accordance with this PWS and as determined by the Government.
PART 5
SPECIFIC TASKS
5.1 Basic Services: 8 fully functioning Non CDL 16-26’ Refrigerated Trucks.
5.2 Tasks:
(a) Contractor Management Reporting (CMR): The contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [NAMED COMPONENT (e.g., Department of the Army)] via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30.
While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website at http://www.ecmra.mil. As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.”
5.3 Service Contract Reporting
5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 8 fully functioning Non CDL 16-26’ Refrigerated Trucks via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address:
www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.
Steps for Submitting a Service Contract Report (SCR)
1. Go to www.sam.gov and log in.
2. Select Entity Registrations and then select Service Contract Reporting.
3. SAM displays your entities which have service contracts and meet the reporting criteria.
Select View by entity to see the service contracts for each entity.
http://www.sam.gov/ http://www.sam.gov/
4. Next, select Add for the service contract against which you want to create a Service Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.
5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:
• Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).
• Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.
6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.
7. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.
Steps for Editing a Submitted Report
1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.
2. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.
STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in corresponding paragraph above.
AQL: 100% Compliant
Provide 8 Non CDL 16- 26’ Refrigerated Trucks,Maintenance and Towing Support Drop off and pick up at Titus rd and Utah Beach, BLDG 2330, 1SBCT Stack DFAC, Fort Carson, CO, 80913.
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)
6.1.2 Department of Defense Security Agreement (DD Form 441)
6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)
6.1.4 Installation Access Control (AE Reg 190-16)
6.1.5 The Army Physical Security Program (AR 190-13)
6.1.6 Contractor Identification (AE Reg 27-715)
6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)
6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)
6.1.10 Information Assurance (AR 25-2)
6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)
6.1.12 Policies and Procedures for Property Accountability (AR 735-5)
PART 7
ATTACHMENT AND TECHNICAL EXHIBIT LISTING
7. Attachment and Technical Exhibit List
7.1 Technical Exhibit A – Performance Requirements Summary
7.2 Technical Exhibit B – Deliverables Schedule
7.3 Attachment 1 – Estimated Workload Data
TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
PERFORMANCE
OBJECTIVE
STANDARD PERFORMANCE
THRESHOLD
ACCEPTABLE
QUALITY
LEVELS (AQLs)
METHOD OF
SURVEILLANCE
PRS#1 -
The Contractor shall ensure equipment is delivered with all necessary original equipment parts IAW the operator’s manual and have a full tank of diesel fuel, if require
PWS. 5.1
The equipment shall be 100% fully functional IAW the operator’s manual upon delivery.
100% 100% Inspection of 8 Non CDL 16-26’ Refrigerated Trucks
Periodic Inspection Inspection of of 8 Non
CDL 16-26’
Refrigerated Trucks
TECHNICAL EXHIBIT B
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Non CDL 16- 26’ Refrigerated Trucks
19AUG24-09SEP24 8x Non CDL 16-26’ Refrigerated Trucks
Truck Pick Up