This document is a Performance Work Statement (PWS) for a federal contract opportunity to engineer, furnish, install, and test the necessary infrastructure components for a complete system to support the installation of fiber optic cable and network equipment at RSS #3 at Eglin AFB, FL.
The key requirements include installing a 12-strand single mode (SM) fiber and 2-strand SM fiber from an existing NEMA box to the NIPR and IDS cabinets, installing 32 NIPR, 24 SIPR, and 145 designated user network drops using OM3 plenum fiber optic cable, and installing cable trays and raceways. The contractor must also perform site preparation, system installation, configuration, testing, and provide as-built documentation. The applicable documents include industry standards and government specifications. The related federal contract opportunity is Solicitation FA2823-24-Q-A031 for the "LAN Drop" requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SITE VISIT INSTRUCTIONS - Signed.pdf | ||
| Clauses and Provision FA282324QA031.pdf | ||
| COMBO RSS 3 LAN Drops.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
(PWS) , RSS #3 (
Organization:
Address: RSS#3(
Eglin AFB, FL 32542
1.0 Requirement / Description of Services
Engineer, Furnish, Install, and Test (EFI&T) all necessary infrastructure components for a complete system to support the installation of a 12-strand single mode (SM) and 2-strand SM fiber from the Nema box outside of RSS #3 and the installation of 32 Non-secure Internet Protocol Router (NIPR), 24 Secure Internet Protocol Router (SIPR), 145 designated user network cables and network equipment to support network connectivity within RSS #3.
Specific Task Objectives:
Outside Plant (OSP)
• Install one indoor/outdoor rated 12 strand single mode fiber and one 2 strand SM fiber for IDS connectivity from the existing fiber connections inside a NEMA box located outside of the RSS #3. Terminate the 12 strand single mode fiber in the existing FODP to a 12 strand SM Fiber Optic Splice Cassette with LC, UPC, Duplex, Single-Mode (OS2) Connectors. Terminate the 2 strand SM fiber for IDS with splice on LC connectors at the existing FODP and user end. Install two 2 inch conduits one for the 12 strand and one for the IDS system from the NEMA box to the point of entry on the outside wall of . Continue to install the conduits along the wall to the other side of the RSS and run one conduit into the NIPR Cabinet and terminate in a 1U FODP with a 12 strand SM Fiber Optic Splice Cassette with LC, UPC, Duplex, Single-Mode (OS2) Connectors and run one conduit to the IDS panel.
Inside Plant (ISP)
• Install new fire-retardant backboards and new wall mount/floor mount cabinets (Specified by SCOII: see Example Standard Air Force NIPR/SIPR Data/Voice Wall-Mount Rack Elevation pages) with dedicated power and grounding for the NIPR, SIPR and user networks. Install Telecommunications Grounding and Bonding Connections: Contractor shall determine materials/install telecommunications copper Primary Busbar (PBB) and conductors suitable for indoor installation in accordance with ANSI/TIA-607 to nearest A/C power panel. The following items shall
13 June 2024 be attached to the PBB…cable tray, cable ladder, racks, cabinets, metal conduits.
• Install 32 NIPR drops Green OM3 Plenum duplex fiber optic tight buffered or MIC indoor cable(s). Install 1 new 2U FODP, terminate FO cable in NIPR cabinet using four 24 strands MM Splice Cassettes with LC, PC, Duplex 50 μm (OM 3). Terminate at user end using splice on LC connectors.
• Install 24 SIPR drops Red OM3 Plenum duplex fiber optic tight buffered or MIC indoor cable(s). Install 1 new 2U FODP, terminate FO cable in SIPR cabinet using four 24 strands MM Splice Cassettes with LC, PC, Duplex 50 μm (OM 3). Terminate at user end using splice on LC connectors.
• Install 145 designated user network drops colors provide by customer, OM3 Plenum duplex fiber optic tight buffered or MIC indoor cable(s).
Install new FODPs size provided by customer, terminate FO cable in cabinet designated by customer using thirty 24 strand cassettes MM Splice Cassettes with LC, PC, Duplex 50 μm (OM 3). Terminate at user end using splice on LC connectors. User drop placement identified on floor plan and at the time of survey.
• Install 200 feet of 12 inch solid bottom cable tray and 200 feet of 4 inch solid bottom cable tray from the network cabinet locations around the wall to the work area locations. 4 inch cable tray is for Core services and 12 inch cable tray for user networks, velcro each colored network in separate bundles using color coded velcro. Install with required grounding/bonding to cable tray, cable tray with solid bottom insert added may be used.
Utilize cable tray for horizontal distribution to the maximum extent possible (80 to 90 percent of the horizontal cable length). Install 1-inch EMT from work area outlet to the cable tray. Work area outlet consists of 1 deep device box and 1 face plate corresponding to the comm layout provided.
The provided floor plan illustrates our customers’ preliminary requirement.
(See Attachment 1)
The provided rack elevation for this project’s floor mount co-location cabinet.
(See Attachment 2)
RSS #3 Overlay (See Attachment 3)
2.0 General Technical Requirements
The following design criteria provides additional requirements and guidance for Eglin AFB installations. These specific requirements are to be implemented by means of all applicable publications and documents referenced within this guide:
2.1. Inside Plant:
Common Patch Panel configuration with Modular style terminations. Site survey will be used to determine best arrangement to fit customer needs and system standards. Ladder rack and cable tray will be included in the TR design to properly facilitate cable routing. All cabinets, racks, ladder rack and cable tray will be grounded per Industry Standard, ANSI 607.
2.2. Telecomm Outlets/Jacks:
Single Gang Outlet Box - Flush Mount. (Single Gang Faceplate Mounting Bracket for Low Voltage Applications, 1-1/4" Maximum Wall Thickness, Finish:
Pre-galvanized.)
Single Gang Outlet Box - Surface Mount. (Single gang two-piece screw together outlet box. Box accepts Pan-Way® Screw-On Faceplates or any NEMA standard single gang faceplate. For use with Pan-Way® LD profile raceway.
5.19in L x 3.45in W x 1.75in H (131.9mm x 87.7mm x 44.4mm). Breakouts for 1/2in, 3/4in, or 1in diameter conduit, International White)
Single Gang 4 Port Faceplate. (4 port minimum. Mini Com Classic series single gang downward sloped faceplate that accepts four modular jacks, Off White)
Data Jack. (The Category 6, RJ45, 8-position, 8-wire, UTP Mini-Com® universal jack module has TG-style termination. Off white)
Blank Inserts. (Mini-Com® 1-port blank module, reserves space for future use, White)
Surface Mount Raceway System. Tamper resistant two-piece latching surface raceway. Supplied with pre-punched mounting holes and factory applied adhesive tape. Available in 6', 8', and 10' lengths, Off White. Compatible with surface mount outlet box. Additionally, all surface mounted raceway systems shall be screwed to the wall to prevent adhesive from detaching from mounted surface.
2.3. Telecommunications Cabling:
Riser CAT 6. (CAT6+ (600MHz), 4-Pair, U/UTP-Unshielded, Riser-CMR, Premise Horizontal Cable, 23 AWG Solid Bare Copper Conductors, Polyolefin Insulation, X Spline, Ripcord, PVC Jacket)
Plenum CAT 6. Copper Cable, Giga SPEED XL 2071E, 23 AWG, 4 Pair, Unshielded, UTP, Solid Bare Copper Conductor, FEP/PVC, CMP, white jacket)
2.4. Cat 6 Connector Block (Patch Panel):
24/48 Port. Constructed for maximum strength and durability. Supports both T568A and T568B wiring configurations using an easy-to-read color-coded wiring label. Rack-mount modular panels shall include an integrated cable management requirement for cable routing and strain relief. Provide a complete modular system from patch panel to work area outlet.
Strain Relief Requirements. All Strain relief bars shall consist of a metal bar that mounts to the rear of a standard EIA 19" rack to support a minimum of 24 cables exiting from the back of a patch panel with a 2-inch to 5-inch inward mounted offset. Cables shall be secured with integrated adjustable clips, hook and loop strips or cable ties. Optional quick release brackets shall provide an easy way to remove the strain relief bar without the use of tools.
3.0 Singularly Managed Infrastructure with Enterprise Level Security (SMI-ELS) Infrastructure Implementation and Operation
3.1 Network Services and Solutions
3.1.2 Site Preparation and Installation Services
The contractor shall perform site preparation and installation activities to support implementation of required services and solutions under this contract at any AF, DoD, or other Federal Agency location.
3.2 Requirements Analysis and Conceptual Design
3.2.1 Site Survey
The contractor shall perform site surveys at required locations. The findings of the site survey and any actions required in preparation for system installation shall be documented.
3.2.2 Installation
The contractor shall engineer, install, configure, modify, relocate, or remove Communication and Information (C&I) systems for operational use. The systems and equipment installations or modifications must comply with established architectures. The contractor shall perform validation and verification testing on the system, assist users in configuring the system to meet their system requirements and provide all applicable operating manuals/system management guides. Further, the contractor shall provide pre-cutover and post-cutover on-site training IAW with TOs. The government will identify personnel who will receive this training. The training shall provide for in-depth hands-on maintenance, operations, and database administration.
3.2.3 Inside Plant
The contractor shall, (as required by each TO), install and configure all the components for inside the plant (e.g., power, groundings, racks, fiber optic distribution panels, equipment, internal cabling, comm. closet, etc.). The contractor shall install and test all cable and components IAW accepted industry standards, unless superseded by a Government approved IS indicated within the TO. Electrical and communications cable, conduits, and circuits shall be installed IAW the National Electric Code (NEC). The contractor shall clearly label each end of every individual cable in accordance with the floor plans or engineering drawings. The contractor shall provide attached labels that are durable and legible. For any deviations to the specific installation specification, the contractor shall submit a proposal to the CO for approval.
3.2.4 Tools and Testing Support
The contractor shall provide all tools, installation materials and test equipment required to perform any required product installation and maintenance as called for by the TO. All tools and test equipment shall remain the property of the contractor. Any damage caused by the contractor to existing site facilities or equipment which might occur during site preparation, installation, testing or cutover of the system will be repaired at the expense of the contractor unless otherwise directed by the government. The site shall be restored to the original condition which existed prior to the event unless otherwise directed. The TO will specify testing and inspection requirements. The contractor shall demonstrate that the system design meets the reliability/availability/maintainability requirements of the TO.
4.0. DELIVERABLES
As-Built Documentation. Contractor format for deliverables is subject to Government acceptance. The installer shall provide accurate As-Built documentation of the entire install (i.e. rack elevations, cable route drawings, etc).
All deliverables shall be produced using recommended software tools/versions as accepted by the Government.
Example Standard Air Force NIPR/SIPR Data/Voice Wall-Mount Rack Elevation
Example Standard Air Force NIPR/SIPR Data/Voice Rack Elevation
5.0 Test and Acceptance Documentation.
The Contractor shall submit test reports within 3 duty days prior to final test and acceptance. The test reports shall show the tests performed to verify compliance with the specified performance criteria. Test reports shall include record of the physical parameters verified during testing. The contractor shall correct any errors or performance deficiencies detected by testing. The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.
APPLICABLE DOCUMENTS
Refer to 96 Communications Squadron Systems Wire and Cable Specifications, dated most recent.
National Electrical Code (NEC) Chapter 8 Article 800 dated most recent.
Unified Facilities Criteria (UFC) 3-580-01 dated most recent.
TIA-526-14-B, TIA-568-C, TIA-569-B, dated most recent.
Attachment 1
Attachment 2: Floor Mount Rack Elevation
Attachment 3: RSS #3 Overlay