PWS_Redacted.pdf

PDF 465 KB Posted

Attached to
I025934/35/52/58 Dom Rep Federal contract opportunity
Solicitation number
83310121Q0021
Issued by
Export Import Bank of the US

About this file

This document contains a notice of intent to award a sole source contract and a statement of work for asset recovery services. The Export Import Bank of the United States intends to award a firm fixed price contract on a sole source basis to Henriquez & Vasquez LLC located in Florida and the Dominican Republic. The contractor will assist EXIM in collecting outstanding amounts owed on claims I025934, I025935, I025952, and I025958. Services will include asset searches, site visits, negotiations, litigation, documenting agreements, embargoing assets, and executing upon assets. Interested parties must register in SAM and can provide information until February 24, 2021, but no RFQ is available as this is a sole source non-competitive award permitted by FAR. The place of performance will be Washington, DC and Florida/Dominican Republic.

The statement of work provides additional details on the required tasks. The contractor must have experience locating and executing on hidden assets in the Dominican Republic and complying with Dominican law. Tasks include due diligence, default recovery on a contingency basis, and litigation with approval of expenses. Performance standards address compliance, timeliness, accuracy, and communication.

View the file

Other files for this federal contract opportunity

Other files attached to I025934/35/52/58 Dom Rep, newest first.
File Type Posted
Justification_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To recover a s s e t s , institute legal proceedings and/or provide credit restructuring related to the claim(s), involving the d e b t o r and guarantor(s).

5.0 APPLICABLE DIRECTIVES

1. EXIM Bank’s AMD procedures

2. Industry practices as observed by peer institutions including Federal

Agencies, foreign ECAs, and multilateral development banks

6.0 GOVERNMENT FURNISHED INFORMATION OR PROPERTY

EXIM Bank will notify Contractor by email from the COR as to the specifics of each case to be recovered.

7.0 SPECIFIC REQUIREMENTS/TASKS

Task Introduction:

Contractors shall analyze the specifics of the case, consider recovery strategies and implement actions based on the potential recoveries and risks with the aim of maximizing collections on behalf of the EXIM Bank.

Contractor will instruct debtor to remit recovered funds directly to EXIM designated accounts.

In the event the Contractor receives directly recovered funds, the Contractor shall remit the funds in their entirety (without deduction of expenses or collection fee) promptly to EXIM’s designated account.

EXIM reserves the right to cease work on case in the event that:

1. EXIM determines the Contractor’s work is unsatisfactory

2. The Contractor requests release from the Case

3. It is determined to be in the best interest of the Government

Task 1 – The Contractor shall provide Case Analysis/Due Diligence:

a. The Government shall send a copy of the collection claim file via email.

b. The Contractor shall perform due diligence and analyze the specifics of the case, consider recovery strategies and recommend actions based on the potential recoveries and risks with the aim of maximizing collections on behalf of EXIM Bank.

c. The Contractor shall ensure there is no conflict of interest between the firm and the debtor. If so, Contractor shall immediately make EXIM Bank aware of this conflict within 5 business days via email. No work shall be completed by vendors where a conflict of interest is present.

d. The Contractor shall conduct a preliminary research /evaluation of the case, including, but not limited to, asset search, credit analysis and legal actions registered against the obligor.

e. The Contractor shall submit invoicing for this Task 1 effort no earlier than submission of due diligence report. Compensation for this is the negotiated fee.

Task 2 – The Contractor shall recover Defaulted Debt per Contingency Fee Basis

a. The Contractor shall attempt extrajudicial collection of the debt within 10 business days of the Recovery Officer’s authorization to proceed and report the results of such attempts to the Recoveries Group, Asset Management Division.

b. The Contractor shall provide a written brief (preferably in English) via email to EXIM Bank’s COR on a frequent basis, at a minimum on a quarterly basis for active cases. The reports should discuss the life cycle of the cases and enable the COR to understand the particular situations surrounding the progress of the case. The COR will also monitor the work of the Contractor through periodic site trips.

c. The Contractor shall provide a Collected Funds report not later than fifteen (15) calendar days after notifying COR notification of incoming funds and identify fee to be received based on percentage of all monies actually collected in accordance with the Assignment email.

d. Contractor understands compensation for Task 2 services is limited to the negotiated contingency fee percentage. No expenses will be reimbursed unless approved by COR.

These expenses are to be determined on a case by case basis.

Task 3 – The Contractor shall conduct Litigation

a. Prior to taking legal action and incurring related costs, the Contractor shall request and obtain in writing the approval from the Recoveries Group, Asset Management Division and EXIM Bank’s Office of the General Counsel through the Litigation Request Form.

Once authorized, the Contractor shall file legal proceedings against the Debtor [and the Guarantors].

b. The Contractor shall provide a break-down of anticipated work/cost on a Litigation Request Form. The Government will review the Form to determine the acceptability of request/cost. Once the Contractor is authorized by EXIM Bank to pursue litigation against a debtor, work of this nature can be completed by the Contractor.

c. Contractor understands compensation for Task 3 services is divided in two sections: 1.

Legal expenses, approved in advance; 2. Negotiated contingency fee percentage applied to the total amount collected. (See Task 2 paragraph d.)

d. Contractor understands EXIM may direct that litigation be commenced soon after assignment of case if deemed to be in the best interest of the Government.

8.0 CONTRACTOR QUALIFICATIONS

a. Work is to be completed in the Dominican Republic and Contractor shall have experience in: locating assets, in particular hidden assets if any, and embargoing (placing liens) and executing upon such assets; drafting / negotiating restructuring agreements appropriate for debtors of the type in this matter, and litigating the collection matter at all levels of courts through the debtor’s country.

keeping, good communicatio n.

Dominican Republic Law, thoroughness and accuracy.

Regular and ad-hoc meetings between contractor and Government as needed performed as the Event occurs.

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

Unsatisfactory (less than 90%).

Conflict of Interest notification

Complete, accurate and timely

100% accuracy.

All deliverables as described in the PWS and specified in the approved Schedule of Deliverables

Surveillance by EXIM Bank COR will be performed as the Event occurs.

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

Positive or negative CPARS rating

Task 2:

Recovery of Defaulted Principal/Co ntingency

Timeliness, complete and thorough record keeping, good communicatio n.

100% Compliance with Dominican Republic Law, thoroughness and accuracy.

Regular and ad-hoc meetings between

Surveillance by EXIM Bank COR will be performed as the Event occurs.

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

CPARS rating contractor and Government as needed

Marginal (between 91% and 93%

Written Brief for active Cases

Complete, accurate and timely

All cases accounted for

100% accuracy.

All deliverables as described in the PWS and specified in the approved Schedule of Deliverables

Surveillance by EXIM Bank COR will be performed as the Event occurs.

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

CPARS rating

Collected Funds report

Complete, accurate and timely

Accurate accounting of expenses.

100% accuracy.

All deliverables as described in the PWS and specified in the approved Schedule of Deliverables

Surveillance by EXIM Bank COR via portfolio monitoring of existing outstanding claims as well as site visits.

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

CPARS rating

Unrecovered cases might be recalled back to EXIM Bank’s portfolio and Contractor instructed to “Cease and Desist” from any further recovery efforts.

Task 3:

Provide Litigation

Timeliness, complete and thorough record keeping, good

100% Compliance with Dominican Republic

Surveillance by EXIM Bank COR will be performed as

Exceptional Very Good Satisfactory Marginal Unsatisfactory communicatio n.

Law, thoroughness and accuracy.

Regular and ad-hoc meetings between contractor and Government as needed the Event occurs.

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

Litigation Request Form with break-down of anticipated work/cost

Complete, accurate and timely

Clear breakdown of projected expenses.

100% accuracy.

All deliverables as described in the PWS and specified in the approved Schedule of Deliverables

Surveillance by EXIM Bank COR will be performed as the Event occurs.

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

CPARS rating

Business Relations

Professional and respectful of all parties

Regular and ad-hoc meetings between contractor and Government

Semi-Annual Performance Evaluation

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

Managemen t of Key Personnel

Appropriate credentials for the work involved Attends scheduled meetings if needed

Available for ad-hoc meetings as necessary for contractual concerns

Regular and ad-hoc meetings between contractor and Government as needed

Semi-Annual Performance Evaluation

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Exceptional (greater than 99%)

Very Good (between 98% and 96%);

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

File details come from the government source that posted it. Updated .