This Performance Work Statement (PWS) outlines requirements for portable toilet and sink station rental services at Northwest Field, Andersen Air Force Base in Guam in support of MWSS-171 GATR 2501 exercise from January 20 to February 2, 2025.
The contractor must provide 4 portable toilets and 1 sink station at the specified MWSS-171 LSA location (MGRS: 55P BR 68950 07992), with cleaning and restocking every other day. Services include toilet paper replenishment, fresh water and soap for sink stations, proper grey-water disposal, and 24/7 emergency maintenance availability. The contractor is responsible for all labor, supervision, tools, materials, vehicles, equipment, and transportation. Performance standards require 100% delivery and servicing of equipment in accordance with PWS specifications, with oversight from a Government representative and quality monitoring through customer feedback and contracting officer surveillance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_M29000_25_Q_1001_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
PORTABLE TOILET/SINK STATION RENTAL
SERVICE REQUIREMENTS
IN SUPPORT OF MWSS-171 GATR 2501
NORTHWEST FIELD, GUAM
1.0 SCOPE OF WORK. In accordance with the schedule of supplies and services, the contractor shall support users who require portable toilet (POJ) & Sink Station rental/service during exercise GATR 2501. The contractor shall provide portable toilet (PAJ) rental/service support during the period of 20 January - 2 February 2025 on Northwest Field as requested on demand to support of US Forces as outlined in section 2.0 of this performance work statement.
2.0 DESCRIPTION OF SERVICES. The contractor will provide PAJ support as follows from 20 January - 2 February 2025:
Northwest Field (NWF), Andersen Air Forces Base
1. Request (4) PAJ & (1) Sink Station delivered to NWF at the MWSS-171 LSA (MGRS:
55P BR 68950 07992)
2. Request cleaning every other day
3. Request replenishment of toilet paper
4. Request to meet contractor at the gate to coordinate drop off location
a. Additional drop off information will be provided after the contract is awarded
2.1 General Requirements
PAJ
The vendor shall deliver and provide toilet paper. PAJ will be cleaned every other day and restocked with sufficient toilet paper to last for two days. US Marine Corps representation will be consulted prior to installation of equipment. The contractor shall furnish all labor, supervision, tools, materials, vehicles, equipment, transportation, and other items necessary for performance.
SINK STATION
The vendor shall clean and restock every other day with fresh water and soap. The vendor shall dispose of Grey-water generated by the use of the stand-alone portable sink stations in accordance with local regulations and procedures. The Marine Corps will have a Marine at the gate to direct the vendor to the location. The contractor shall furnish all labor, supervision, tools, materials, vehicles, equipment, transportation, and other items necessary for performance
2.2 Additional service required: Contractor shall provide any emergency maintenance as needed and contractor shall be available 24/7 in the event a situation arises.
3.0 LOCAL CONTRACTOR COORDINATION. The Government representative will be responsible for ensuring the selected contractors provide the requested services; overseeing initial installation; and reporting service interruptions to the Government representative.
Assistance with local contractor support representatives can be accomplished by contacting:
TBD ON AWARD
4.0 PERIOD OF PERFORMANCE.
Northwest Field (NWF), Andersen Air Force Base – 20 January - 2 February 2025 Northwest Field Anderson AFB (See 2.0 for specific location and date of installation/service)
5.0 POINTS OF CONTACTS AND AUTHORITIES. The contracting officer is the only person authorized to approve any changes to the requirements of this contract and not withstanding provisions contained elsewhere in this contract, the authority remains solely the contracting officer. In the event the contractor effects any change at the direction of any person other than the contracting officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price as a result of the change.
6.0 CONTRACTUAL RELATIONSHIPS. Contractor personnel shall at all times be under the supervision of the contractor and not under the supervision of the Government or any of its officers or employees. The contracting officer will bring discrepancies or noncompliance with the contract clauses, specifications, or Performance work statement to the attention of the contractors’ supervisor or foreman for necessary corrective action.
7.0 LIABILITY. The U.S. Government accepts no liability for the actions of the contractor or his employees and agents. The contractor shall, if any of the services do not conform to the contract requirements, be required by the U.S. Government to re-perform the services in conformity with the contract requirements, at no additional expense to the Government.
8.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Task or Deliverable Performance Standard
Acceptance Quality Level
Surveillance Method Performance Measure
Portable toilets & Sink Stations
PWS 2.0/2.1/2/2
The performance standard will be met when the requirements for services detailed in PWS 2.0/2.1/2.2 have been accepted by the Government.
Acceptable performance has been met when 100% of the equipment has been delivered & serviced safely in accordance with
PWS.
Customer feedback, Contracting Officer/Government Point of Contact surveillance or feedback of work completed
Accordance with PWS
Maintenance Agreement
PWS 2.0 /2.1 / 2.2
The performance standard will be met when the requirements for the maintenance (should any maintenance of equipment arise) agreement as detailed in PWS 2.0/2.1/2.2 have been accepted by the Government as effectively supporting PWS requirements.
Acceptable performance has been met when 100% of the equipment has been delivered safely in accordance with
PWS.
Customer feedback, Contracting Officer/Government Point of Contact surveillance or feedback of work completed
Accordance with PWS
END OF PERFORMANCE WORK STATEMENT
File details come from the government source that posted it. Updated .