PWS_NOSSP Forecasting Documentation.pdf
PDF 236 KB Posted
- Solicitation number
- N0018923RR030
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Fleet Numerical Meteorology and Oceanography Center
Navy Ocean Sound Speed Prediction (NOSSP) Ocean Modeling System and Forecasting Critical Documentation Support
1.0 INTRODUCTION
The Fleet Numerical Meteorology and Oceanography Center (FLENUMMETOCCEN), under the direction of the Commander, Naval Meteorology and Oceanography Command (METOC), has the mission to collect, interpret, and apply global atmospheric and oceanographic data and information in support of strategic and tactical warfare and peace-keeping initiatives. Located in Monterey, CA, and at Stennis Space Center, MS, FLENUMMETOCCEN runs regularly scheduled numerical predictions of the global atmosphere and ocean. FLENUMMETOCCEN consists of supercomputer systems that run the numerical atmospheric/oceanographic models and other systems, including clusters, which provide data communications, pre- and post-processing, derived applications, and web services. METOC products are then distributed either directly to customers, including active warfighters, or to regional centers and made available to Department of Defense (DOD) activities worldwide.
FLENUMMETOCCEN operates a sophisticated suite of numerical environmental models and customer product applications that exploit all levels of High Performance Computing (HPC).
The systems that comprise FLENUMMETOCCEN's computing suite are called the Primary Oceanographic Prediction System-Meteorology (POPS-Met). FLENUMMETOCCEN processes the world's most complete database of oceanographic and atmospheric observations assimilated several times daily into global and regional METOC models.
2.0 BACKGROUND
The Fleet Numerical Meteorology and Oceanography Center (FLENUMMETOCCEN), under the direction of the Commander, Naval Meteorology and Oceanography Command, runs regularly scheduled numerical predictions of the global atmosphere and ocean. Located in Monterey, CA, and at Stennis Space Center, MS, FLENUMMETOCCEN products are distributed directly to Department of Defense (DOD) activities worldwide.
The Navy Ocean Sound Speed Prediction (NOSSP) Ocean modeling system, Rapid Ocean Atmosphere Modeling Environment-Relocatable (ROAMER) model management system and Navy Ocean Forecasting Tools (NOFT) provide on-demand, multiresolution Numerical Ocean Prediction (NOP) capability.
2.1 Requiring Organization:
The organization requiring the services outlined in the Performance Work Statement (PWS) is:
FLENUMMETOCCEN
7 Grace Hopper Avenue, Stop 1
Monterey, CA 93943-5501
3.0 SCOPE:
The contractor shall support documentation of NOSSP and Ocean Forecasting application software and processes and ensure this documentation is accurate and complete.
3.1 NOSSP
3.1.1 Provide System and Application documentation for NOSSP software, systems, and supporting processes. Create new and update existing documents to reflect modification performed under contract to include:
• In-line documentation in software source code.
• System reference guide.
• Detailed annotated graphical depictions of process flow (flow-charts/wire-diagrams).
• Specifications for Input/Output data, Control files and Output product(s).
• Document any differences between NIPRNET and SIPRNET software and infrastructure.
• Standard Operating Procedures
3.2 Ocean Forecasting
3.2.1 Provide System and Application documentation for Ocean Forecasting software, systems, and supporting processes. Create new and update existing documents to reflect modification performed under contract to include:
• In-line documentation in software source code.
• System reference guide.
• Detailed annotated graphical depictions of process flow (flow-charts/wire-diagrams).
• Specifications for Input/Output data, Control files and Output product(s).
• Document any differences between NIPRNET and SIPRNET software and infrastructure.
• Standard Operating Procedures
4 DIRECTIVES
The contractor shall comply with the following directives, and any updated/future versions as they are released:
• DoD Information Assurance Certification and Accreditation Process (DIACAP) Handbook, 15 July 2008
• ISSM Handbook Version 1.0 – 15 July 2008
• U.S. Navy Risk Management Framework Process Guide, Version 3.0, 10 October
• DoD Instruction 8500.01, Cybersecurity, 14 March 2014 (incorporating Change 1, 7 October 2019)
DoD Instruction 8510.01, Risk Management Framework (RMF) for DoD Information Technology, 12 March 2014 (incorporating Change 2, 28 July 2017)
• DoD Manual 5200.02, Procedures for the DoD Personnel Security Program (PSP), 3 April 2017, (incorporating Change 1, 29 October 2020)
• DODI 5200.46, DoD Investigative and Adjudicative Guidelines for Issuing the Common Access Card (CAC), 9 September 2014 (incorporating change 1, 4 May 2018)
• DoDM 5200.01 Volume 2, DoD Information Security Program: Marking of Information, 24 February 2012 (incorporating Change 4, 28 July 2020)
• DoDM 5200.01 Volume 3, DoD Information Security Program: Protection of Classified Information, 24 February 2012 (incorporating Change 3, 28 July 2020)
• DoDM 5200.01 Volume 4, DoD Information Security Program: Controlled Unclassified Information, 24 February 2012 (incorporating Change 1, 9 May 2018)
• DoD 5220.22, Volume 2, National Industrial Security Program: Security Procedures for Government Activities Operating Manual, 1 August 2018
• DODD 5240.06, Counter Intelligence Awareness and Reporting (CCSR), 17 May 2011 (incorporating change 2, 21 July 2017)
• OPNAVINST 5530.14E, Navy Physical Security and Law Enforcement Program, 28 January 2009 (incorporating change 2, 23 September 2014)
• FLENUMMETOCCENINST 5510.1K, Command Information and Personnel Security Manual, 6 July 2018
• FLENUMMETOCCENINST 5239.3C, Access Policy for Command Information Systems, 24 May 2018
• FLENUMMETOCCENINST 5239.4A, Command Cybersecurity Workforce Implementation Plan, 12 October 2017
• FLENUMMETOCCEN A2 User’s Guide v-3.2, 23 March 2016
5.0 REQUIREMENTS/TASKS
5.1 REQUIREMENTS: Contractor shall maintain existing and new documents in the FLENUMMETOCCEN NOSSP/OcnP documentation library. Documentation requirements include the following for both NIPRNET and SIPRNET, where applicable:
5.1.1 TASKS
Contractor shall create new and maintain existing documentation supporting the following:
5.1.1.1) Maintenance of NOSSP System and OcnP baseline documentation and all modifications to the baseline.
5.1.1.2) OcnP and NOSSP Business Rules, Standard Operating Procedures
(SOPs), Policy, and Guidance for:
• Account request process at the Naval Oceanographic Office (NAVOCEANO),FLENUMMETOCCEN, and DSRC, including example forms.
• Model operations and data management, including file transfers, deliveries, and storage
• Model setup, configuration, implementation, execution including rerunning, and troubleshooting for all model types
• OcnP/NOSSP configuration management
• Model Operations software storage and documentation back-up policy
• NAVOCEANO NIPRNET to SIPRNET Cross-Domain Solution
5.1.1.3) NOSSP System – infrastructure to support automated OcnP nested, data assimilating and non-data assimilating, two- and three-dimensional, tidal and full-physics ocean and wave models and product generation, including documentation of computational resource availability and usage.
5.1.1.4) Rapid Ocean Atmosphere Model Environment, Relocatable (ROAMER) system – FLENUMMETOCCEN-Stennis’s relational database with a web-portal interface to the database and modules, including the Model Monitoring System (MMS) and Model Alert System (MAS), that monitor, use, and refresh the information stored in the database to carry out specific operational functions. Components include:
• ROAMER system and modules
• ROAMER database design and structure
• ROAMER portal - web based interface
5.1.1.5) Model Operations – check lists, system software, automated and manual model operations, production processes, system and error monitoring and logging.
5.1.1.6) Maintain procedures and troubleshooting documentation. Operations troubleshooting documentation contains graphics and system log examples to help Ocean Prediction (OcnP), Model Operations, and Computer System Watch Officer personnel identify, diagnose, and solve model operations problems.
5.1.1.7) System and software tools used by model operations personnel to automatically and manually check the “health and status” of complete model operational system.
5.1.1.8) Request for Service (RFS) modules, interfaces, and SOPs for interface use and RFS management.
5.1.1.9) Automated Product Generation for:
• Standard and optional files and Network Common Data Form
(NetCDF) files
• Standard graphics, Keyhole Markup Language (KML), encrypted American Standard Code for Information Interchange (ASCII) files using wavelet or other compression, and NetCDF products for access via FLENUMMETOCCEN webpages
• Ocean Prediction Products Page, a graphical user interface for accessing OcnP products
• Submarine Support Page, a webpage that hosts automatically generated wavelet files
• Interactive Model Display, an interactive, web-based capability that allows end users to animate model predictions through the forecast period and to view time-series of model predictions at pre-defined locations.
5.1.1.10) Product Delivery – document system software, formats, and SOPs used to move ocean forecasting products to the appropriate internal and external delivery locations:
• Standard and special FLENUMMETOCCEN webpages
• Standard graphics, KML, wavelet, and NetCDF products
• Ocean Prediction Products Page
• Data Archive, both on DoD Supercomputing Resource Center
(DSRC) and internal NAVOCEANO Storage Area Network
(SAN)
• External (to NAVOCEANO network) users
• Custom data services
5.1.1.11) NIPRNET to SIPRNET Cross Domain Solution - System infrastructure
5.1.1.12) Network dependencies and alternate solutions for incoming and outgoing file deliveries, such as Defense, Research, and Engineering Network (DREN), Committee for Operational Processing Centers (COPC), etc.
5.1.1.13) Maintain existing and create new process wiring diagrams in a government-identified format.
5.1.1.14) Document NOSSP Ocean Modeling System Business Rules, SOPs, Policy, and Guidance for:
• Modeling, model operations, and data management, including changes resulting from consolidation of processes and procedures between FLENUMMETOCCEN-Monterey and FLENUMMETOCCEN-Stennis
5.1.1.15) Contractor shall provide all documentation both in digital and hardcopy format.
• Documentation shall follow OcnP standard document formats specified below.
• All documents shall be uploaded and made available in a government-identified location.
• Hardcopies of documentation shall be kept up to date for periods without network availability, such as during hurricanes/emergencies.
5.1.1.16) Contractor shall provide Model Operations Data Flow Diagrams (Wire-Diagrams) updates in Adobe PDF, and/or other file formats as designated by government technical points of contact.
• Model Operations Data Flow Diagrams are a graphic representation of a logic sequence in a formalized structure of specific OcnP model operation processes, data, and file movement using standard symbology and interconnecting lines.
• The purpose of a flow chart is to provide a standard reference and common terminology as the foundation for understanding and/or isolating errors/issues with a model operation process.
5.1.1.17) Contractor shall provide Standard Operating Procedures (SOPs) in MS PowerPoint, MS Word, Adobe PDF, and/or other format as designated by government technical points of contact and shall include:
• Detailed documentation that provides step-wise procedures on how to run the software, ingest data, analyze data, generate products, and deliver products to final destination and to archive.
• Numerous annotated graphical depictions (i.e., screen copies – examples).
5.1.1.18) Contractor shall provide Software System Documentation - Reference Guide in Microsoft Word. Guide provides a detailed description of the “overall software system”, to include:
• Software modules with functions
• Input/output data
• Setup and parameterization files
• Internal data structures
• Database system
• File distribution system
5.1.1.19) Contractor shall provide trouble-shooting guides – examples are:
• Business Rules, Procedures, Guidance, and Policies
• Infrastructure documentation, ocean model documentation
• Model Operations SOPs
• Model Operation System Checklists - troubleshooting guides to assist Model Operations Watchstanders in addressing operational issues
• Forecasting Checklist - troubleshooting guides to assist Model Operations Watchstanders in addressing operational issues
• Model Operations Data Flow Diagrams (Wire-Diagrams)
• DSRC Model/Domain Schedules
5.1.1.20) Document any differences between NIPRNET and SIPRNET software and infrastructure.
Performance Standard:
Documentation will follow generally accepted formatting and grammatical standards.
Assessment Method:
Subject Matter Experts will conduct reviews of documentation prior to acceptance.
5.2 REQUIREMENTS: Contractor shall maintain existing and new documents in the FLENUMMETOCCEN Ocean Forecasting documentation library. Documentation requirements include the following for both NIPRNET and SIPRNET, where applicable. The Contractor shall provide comprehensive documentation services to include:
5.2.1 TASK
Contractor shall create new and maintain existing documentation supporting the following:
5.2.1.1) Maintain Ocean Forecasting Documentation Library for system baseline and all modifications to baseline.
5.2.1.2) Business Rules, Policy and Guidance:
• Ocean Forecaster Assignment and Tracking Process
• Standard metadata and naming conventions
5.2.1.3) Software Suite for Ocean Forecasting – SOPs necessary for use by Ocean Forecasters for product generation:
• ArcGIS Reach-back Cell Oceanography Analysis System (ARCOAS), Esri ArcGIS Desktop framework data and model analysis, viewing, processing, and product generation tool.
• Coastal Forecasting Tools and their components.
• Drift prediction software.
• Observation Quick Look Display Page.
• Ocean, wave, and tidal model setup procedures.
• Acoustic Parameters (APARMS) calculations/Acoustic Path
Availability (APA)
5.2.1.4) Product Generation to include:
• Tactical Oceanographic Feature Assessment (TOFA) and Standard Area Assessment Layer Packs – including Geographic Information System (GIS) Layer Packages, KML, OVLY-2, Text, and MS PowerPoint products.
• Ocean Feature Analysis (OFA) – fronts and eddies, in text, graphical, shapefile, and Over-the-Horizon Gold (OTH-GOLD) format
• Wave Model Products
• Coastal Prediction Products
• Water Sampling Plan
• Object Drift Analysis, Trajectory, and Probability products 5.2.1.5) All documentation shall be provided both in digital and hardcopy format.
• Documentation shall follow Ocean Forecast standard document formats specified below.
• All documents shall be uploaded and made available in a government-identified location.
• Hardcopies of documentation shall be kept up to date for periods without network availability, such as during hurricanes/emergencies.
5.2.1.6) SOPs shall be delivered in Microsoft PowerPoint, Microsoft Word, Adobe PDF, and/or other government-identified format.
• Detailed documentation that provides step-wise procedures on how to run the software, ingest data, analyze data, generate products, and deliver products to final destination and to archive.
• Contains numerous annotated graphical depictions (i.e., screen copies
– examples).
5.2.1.7) Software System Documentation - Reference Guide shall be delivered in Microsoft Word. Guide provides a detailed description of the “overall software system”, to include:
• Software modules with functions
• Input/output data
• Setup and parameterization files
• Internal data structures
5.2.1.8) Document any differences between NIPRNET and SIPRNET software and infrastructure.
All design changes, software changes, and documentation shall be backed-up according to OcnP policies and guidelines.
Performance Standard:
Documentation will follow generally accepted formatting and grammatical standards.
Assessment Method:
Subject Matter Experts will conduct reviews of documentation prior to acceptance.
5.3 Bi-weekly Status Reports The contractor shall provide a bi-weekly status report (BSR) to the TPOC. The BSR shall provide a high level bi-weekly summary of activities and issues uncovered as well as anticipated issues. It shall be accurate and, as a deliverable, stand up to the scrutiny of review. The BSR shall contain the following sections:
• Summary of Accomplishments and Significant Events
• Deliverables Assigned/Milestones/Status
• Deliverables Submitted
• Current or Anticipated Issues
• Government-Identified Topics and Issues
• Summary of Activity Planned for the Next Reporting Period
5.4 Technical Clarification Notice
Technical Clarification Notices (TCN) will be used to clarify areas of support required by this order. TCNs may be used to: prioritize support; further define level, location or schedule of support to be provided; and/or output requirements (e.g., deliverables). TCNs may be generated by either the contractor or the Government, but must be fully coordinated and approved by the TPOC prior to execution. TCNs shall not be used to change the intent, scope, or value of this order.
6.0 DELIVERABLES AND MILESTONES
Deliverables shall be provided by the contractor to the FLENUMMETOCCEN TPOC.
Electronic documents shall be in Microsoft Office, Microsoft Project, or Adobe format unless otherwise agreed to by the Government. Electronic documents will be in an editable form without password protection. The government will review and approve or disapprove deliverables within 7 working days of receipt. The Contractor shall consider the deliverable accepted if a government response has not been provided within the 7 working day review time.
Disapproved deliverables shall be reworked and resubmitted within 5 working days of contractor notification unless the TPOC and contractor mutually agree upon other terms.
The following are contractor responsibilities:
Deliverable Section Frequency Format/Qty Due Date Documentation and final Task Statement Report
5.1
As Required Disk(s), system drive location(s) and MS Office Electronic Submission as appropriate and DI2E/Jira and/or WIKI submission when appropriate
Within 7 days of completion
Documentation and final Task Statement Report
5.2 As Required Disk(s), system
drive location(s) and MS Office Electronic Submission as appropriate and DI2E/Jira and/or WIKI submission when appropriate
Within 7 days of completion
Deliverable Section Frequency Format/Qty Due Date Hard and digital copies of documentation and a final Task Statement Report
5.1 - 5.2 As Required Hard copy, MS Office Electronic Submission, and DI2E/Jira and/or WIKI submission when appropriate
No later than 5 days prior to end of period of performance
7.0 PERIOD OF PERFORMANCE
The period of performance shall be from 29 September 2023 to 28 September 2024 with four 12-month option periods.
8.0 PLACE OF PERFORMANCE
The primary place of performance for up to one contractor at any one time shall be on-site at the FLENUMMETOCCEN facility located at 1002 Balch Blvd, Stennis Space Center, MS 39522.
Additional contractors will have to work off site in contractor provided spaces.
9.0 TRAVEL REQUIREMENTS - TRAVEL IS NOT ANTICIPATED FOR THIS TASK.
10.0 SECURITY REQUIREMENTS
10.1 The contractor shall be responsible for adhering to all Department of the Navy (DoN) and command instructions, guidance, orders, directives, and supplements relative to performing work on NOSSP and Forecasting Documentation.
10.2 The primary place of performance shall be on-site at the FLENUMMETOCCEN, Stennis Space Center facility, which dictates all personnel performing on-site must possess and maintain US Citizenship and an active National Security clearance eligibility of SECRET or higher, based on a current Tier 3 investigation, or Tier 5 investigation. The scope of this work includes IT-II (Limited Privileged) that is considered to be a noncritical sensitive position. The incumbent must be compliant with DOD required training and certification for the IT Workforce.
10.3 The contract holder and actual service provider must have facility clearances at the same level as the individuals required in the Performance Work Statement (PWS).
11.0 GOVERNMENT PROVIDED RESOURCES
11.1 The Government will provide the contractor any government furnished resources required to support performance of the effort in this order. The Contractor shall establish and maintain an inventory control system covering all accountable Government-furnished resources supplied under the order.
11.2 The Government will provide the contractor access to systems and software required to complete the assigned tasks for up to 2 contractors at any one time. The Contractor shall identify and notify the Government of system documentation necessary for the proper performance of this task.
11.3 The contractor shall be furnished with documentation, task working papers, project descriptions, program briefing material and other pertinent information, and other documentation or material required to support performance of the effort in this order.
Information will be provided to the contractor within a reasonable time commensurate with schedules and target completion dates for assigned tasks and activities.
11.4 In performance of services under this order, the contractor may be required to perform operations on, have access to, or handle data and information that contains sensitive, proprietary, privacy information and data. The contractor shall be responsible for safeguarding the information and data while under the control of or available to the contractor and preventing it from being compromised, damaged, lost, or properly disseminated. Unless authorized by the Government, information and data shall not be released outside FLENUMETOCCEN.
11.5 The Contractor and any employee or consultant of the Contractor is prohibited from using US Government facilities, equipment, or information for any purpose except as specifically described herein and related to this order. Contractor personnel shall not divulge or release data or information created or obtained in performance of this order until made public by the Government, except to authorized Government personnel. The contractor shall not use, disclose, or reproduce proprietary data other than as required in the performance of this order.
11.6 The Government will provide contractor with access to the FLENUMMETOCCEN Software Standards Manual and other appropriate documentation.
11.7 The Government will provide required office space and equipment necessary to accomplish prescribed tasks.
11.8 The Government will provide office supplies necessary for completion of tasks.
11.9 Government will provide security access cards to allow contractor access to all spaces required to carry out assigned tasks.
12.0 SKILL OR RELEVANT EXPERIENCE REQUIREMENTS
12.1 Personnel designated will be committed to the project for its duration and cannot be substituted or replaced without the written agreement of the TPOC. The Contracting Officer (KO) is authorized to remove any contractor personnel assigned to this task who are not meeting the task’s requirements. In these cases, the TPOC shall provide the KO written justification supporting a request for removal.
12.2 Personnel must have the following minimum skills and experience:
• 3 years experience:
o Microsoft Word, PowerPoint, Visio, Excel, Open Office on UNIX, Adobe
Acrobat Professional
• 2 years experience:
o Information System Documentation, technical editing, and publication.
• Batchelors Degree or experience in computer science, software engineering, or a physical science:
o Coursework covering computer science or physical science.
9.3 KEY PERSONNEL QUALIFICATION REQUIREMENTS
The contractor shall commit key personnel to this effort for a period of twelve months from the date performance commences. Relief may be provided on a case by case basis by the KO.
The contractor’s replacement employee/s for key personnel shall possess the skill or relevant experience requirements set forth in paragraph 7.0 of this document. Documentation shall be submitted to the KO and TPOC. The KO MUST approve any substitution BEFORE substitution is made.
13.0 CLAUSES:
Privacy Act During performance of this order, the contractor may have access to Privacy Act data. Should this occur, the contractor shall safeguard all privacy information, and ensure this data is accessed and maintained IAW applicable laws and regulations.
Non-Disclosure Agreement:
The Business Sensitive Information Non-disclosure Agreement is required for this order.
Data Rights:
The Government shall have unlimited rights under this agreement to all information and materials furnished by the contractor performing work under this PWS. This shall include documentation thereof, reports and listings and all other items pertaining to the work and services pursuant to this agreement. The Government has the right to inspect the work and will have access to, and the right to make copies of the above mentioned items. All digital files, data and other items generated in performance of this effort shall become the property of the Government.
14.0 QUALITY CONTROL
The Contractor is solely responsible for the quality of services provided. The Contractor is also liable for Contractor employee negligence, and any fraud, waste or abuse.
15.0 HOURS OF OPERATION
The Contractor shall provide services during normal working hours excluding Federal holidays.
Normal working hours are 0730-1700, Monday through Friday, unless requirements dictate otherwise. An after- hours response may be required in some cases and will be at the COR’s discretion and arrangements made with the contractor ahead of time. Exceptions can be permitted by the COR upon request and at the COR’s discretion.
16.0 CONTRACTOR IDENTIFICATION
IAW DFAR 211.106, there shall be a clear distinction between government employees and service contractor employees. Service contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel.
They must also display distinguishing badges or other visible items of identification for meetings with government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
17.0 POINTS OF CONTACT
FLENUMMETOCCEN COR, Quality Assurance Monitor and WAWF Acceptor:
Keith Willis
FLENUMMETOCCEN
1002 Balch Blvd, Stennis Space Center, MS 39522 228-688-4785 keith.d.willis.civ@us.navy.mil
FLENUMMETOCCEN Contract Administration:
Christopher Swope, Contract Specialist
FLENUMMETOCCEN
7 Grace Hopper Avenue, Stop 1 Monterey, CA 93943
(831) 657-1469 christopher.d.swope4.civ@us.navy.mil
| 1.0 INTRODUCTION |
| 2.0 Background |
| 3.0 SCOPE: |
| The contractor shall support documentation of NOSSP and Ocean Forecasting application software and processes and ensure this documentation is accurate and complete. |
| 4 DIRECTIVES |
| DoD Information Assurance Certification and Accreditation Process (DIACAP) Handbook, 15 July 2008 |
| ISSM Handbook Version 1.0 – 15 July 2008 |
| U.S. Navy Risk Management Framework Process Guide, Version 3.0, 10 October 2019 |
| DoD Instruction 8500.01, Cybersecurity, 14 March 2014 (incorporating Change 1, 7 October 2019) |
| DODI 5200.46, DoD Investigative and Adjudicative Guidelines for Issuing the Common Access Card (CAC), 9 September 2014 (incorporating change 1, 4 May 2018) |
| DoDM 5200.01 Volume 2, DoD Information Security Program: Marking of Information, 24 February 2012 (incorporating Change 4, 28 July 2020) |
| DoDM 5200.01 Volume 3, DoD Information Security Program: Protection of Classified Information, 24 February 2012 (incorporating Change 3, 28 July 2020) |
| DODD 5240.06, Counter Intelligence Awareness and Reporting (CCSR), 17 May 2011 (incorporating change 2, 21 July 2017) |
| OPNAVINST 5530.14E, Navy Physical Security and Law Enforcement Program, 28 January 2009 (incorporating change 2, 23 September 2014) |
| FLENUMMETOCCENINST 5510.1K, Command Information and Personnel Security Manual, 6 July 2018 |
| FLENUMMETOCCEN A2 User’s Guide v-3.2, 23 March 2016 |
| 5.0 REQUIREMENTS/TASKS |
| 8.0 PLACE OF PERFORMANCE |
| 9.0 TRAVEL REQUIREMENTS - Travel is not anticipated for this task. |
| 10.0 SECURITY REQUIREMENTS |
| 12.0 SKILL or RELEVANT EXPERIENCE REQUIREMENTS |
| 9.3 KEY PERSONNEL QUALIFICATION REQUIREMENTS |
| 13.0 Clauses: |
| 14.0 Quality Control |
| 15.0 Hours of Operation |
| 16.0 CONTRACTOR IDENTIFICATION |
| 17.0 POINTS OF CONTACT |
File details come from the government source that posted it. Updated .