PWS - MOOG.docx
DOCX document 97 KB Posted
- Attached to
- MOOG Pressure Regulator Repair BPA
- Solicitation number
- FA8224-20-Q-MOOG
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price List - MOOG.xlsx | XLSX spreadsheet | |
| GFP - MOOG.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation - MOOG BPA.docx | DOCX document | |
| SSJ - MOOG.pdf | ||
| CDRL - MOOG.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance-Based Work Statement (PWS) moog pRESSURE rEGULATOR rEPAIR
U.S AIR FORCE
309 Maintenance support group (309 mxsg)
3/30/2020 i
TABLE OF CONTENTS
| 1 | DESCRIPTION OF SERVICES | 1 |
| 2 | BASIC SERVICES | 1 |
| 2.1 | Government Furnished Property | 1 |
| 3 | SERVICE SUMMARY (SS) | 2 |
| 4 | DELIVERABLES | 2 |
| 5 | ADDITIONAL REQUIREMENTS | 2 |
| Appendix A – Acronyms and abbreviations | 3 | |
| Appendix B – Estimated workload data | 4 |
DESCRIPTION OF SERVICES
The 309 Maintenance Support Group (309 MXSG) has a requirement for repair and overhaul of their Moog pressure regulators. The contractor shall provide required personnel, equipment, parts, tools, materials, supervision and services necessary to overhaul and rebuild Moog Pressure Regulators, Model #50-113B, and bring them back to the Original Equipment Manufacturers (OEM) specifications.
BASIC SERVICES
Contractor shall make needed repairs on MOOG pressure regulators and perform testing to ensure they are returned to full operational capability, IAW OEM specifications and this PWS.
Government Furnished Property Upon contract award, Government will ship MOOG pressure regulators (at no cost to the contractor) to the contractor’s location for repair. When Contractor has completed repair to OEM specifications and completes functional test, the Contractor shall ship said pressure regulators back to 309 Maintenance Support Group (MXSG) through certified mail. Pressure regulators will be tracked as government furnished property (GFP) during shipping and repair. See Appendix B.
309 MXSG will assume possession at receipt and inspection.
Contractor shall stop work if additional repairs are required outside of the scope of this PWS and obtain approval to perform the additional repairs through Contracting Officer (CO).
Contractor shall conduct operational test (prior to return), to ensure equipment functions within the OEM specifications. Contractor shall provide 309 MXSG Subject Matter Expert (SME) with a report detailing the results of the operational test. The regulators will meet the minimum 50 psi and maximum 4500 psi. (CDRL A001).
Service Summary (SS)
| Performance Objective |
| PWS Para |
| Performance Threshold |
| Contractor shall perform repair of MOOG Pressure Regulators, to return them to fully operational status, per IAW OEM specifications. |
| 2 |
(Satisfactory) Repair is made to OEM standards and returned within 60 calendar days.
| Contractor shall conduct operational testing to ensure equipment functions within OEM specifications. Contractor shall provide the AMSS and SME with a report detailing the results of the operational test. (CDRL A001) |
| 2.1.2 |
(Satisfactory) Provide Test/Inspection Report (CDRL A001) for 100% of the pressure regulators repaired.
Deliverables Data Items:
DATA ITEM
TITLE
DELIVERY DATE
| A001 |
| Test / Inspection Report |
| As required |
additional requirements Standard commercial warranty applies.
Upon completion of repair, the MOOG pressure regulators shall be shipped and returned to the following address:
309 MXSS
5814 Engine Lane, Bldg. 279 Hill AFB, Utah 84056
Appendix A – acronyms and abbreviations
| Acronym/Abbreviations | Definition | |
| AFI | Air Force Instruction | |
| AFB | Air Force Base | |
| AFMC | Air Force Material Command | |
| AMSO | Acquisition Management Support Office | |
| AMSS | Acquisition Management Support Specialist | |
| CDRL | Contract Data Requirements List | |
| CO | Contract Officer | |
| DoD | Department of Defense | |
| GFP | Government Furnished Property | |
| HAFB | Hill Air Force Base | |
| IAW | In Accordance With | |
| MXSG | Maintenance Support Group | |
| OEM | Original Equipment Manufacturer | |
| PARA | Paragraph | |
| PSI | Pound per Square Inch | |
| PWS | Performance-Based Work Statement | |
| SME | Subject Matter Expert | |
| SS | Service Summary | |
| TO | Technical Order |
appendix B - estimated workload data The below listed Items are to be included in this contract.
| Equipment |
| Description |
| Model |
| QTY |
| MOOG Pressure Regulators |
| Pressure Regulators used on MOOG Test Stands |
| 50-113B |
A22383 11 initial, then as needed image1.jpeg
File details come from the government source that posted it. Updated .