PWS MLB MHE.pdf
PDF 146 KB Posted
- Attached to
- CG YARD MLB MHE Service Requirement
- Solicitation number
- 52000PR250020307
About this file
This Performance Work Statement (PWS) details maintenance requirements for material handling equipment used by the U.S. Coast Guard's Mobile Logistics Branch (MLB) in Baltimore, Maryland. The contract objectives include performing quarterly and annual preventative maintenance on four pieces of material handling equipment, with a critical requirement to ensure no more than one equipment unit is down for maintenance at any given time. The contractor must conduct regular inspections, document maintenance activities, and submit monthly progress reports, with work primarily performed between 0700-1600 EST, Monday through Friday.
The contract is a one-year base period from September 30, 2025 to September 29, 2026, with the contractor responsible for furnishing all necessary materials, equipment, and services. Key contractor responsibilities include performing minor repairs, maintaining quality control, adhering to government facility access and identification protocols, and ensuring professional conduct. The contract will be awarded on a best value basis, with deliverables subject to review by the Contracting Officer's Representative (COR), who will have two business days to review and approve or request corrections on submitted documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MLB Equipment List.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECUITY (DHS)
PERFORMANCE WORK STATEMENT
FOR
Various Material Handling Equipment
1.0 GENERAL
1.1 BACKGROUND
The Mobile Logistics Branch (MLB) acts as a Deployable Support Element and is tasked with establishing Forward Operating Bases in support of Coast Guard operations. MLB also is responsible for providing processing, packaging, and delivery of material to the Coast Guard overseas Remote Stock Location. The material handling equipment referenced in the statement are an integral part of the MLB’s operations. There are four (4) pieces of material handling equipment of varying ages, manufacture and model numbers that require consistent upkeep and maintenance (see equipment list for additional information). Without these pieces of equipment, MLB’s operations would be hindered.
1.2 SCOPE
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items for non-personal services necessary to perform maintenance services as defined in this Performance Work Statement.
1.3 OBJECTIVE
The Contractor shall be responsible for maintaining operational capability for all material handling equipment listed on the material handling equipment list at the USCG MLB in Baltimore Maryland.
The objective of this responsibility is to ensure that no more than one (1) piece of equipment being down for no more than 1 (one) week at any given time. The objective is supported by the tasks listed in this PWS, which have been designed to achieve and sustain operational capability.
1.4 GENERAL INFORMATION
Quality control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is how they assure themselves that their work complies with the requirement of the contract.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE: PREVENTATIVE MAINTENANCE (PM)
2.1.1. Perform quarterly PM services on all equipment listed on the material handling equipment list in accordance with the manufacturer specifications. This includes changing oil, filters, fluids, as well as adjusting and checking brakes, lights, and safety devices. Additionally, any other minor maintenance tasks specified by the manufacturer should be completed.
2.1.2. Perform annual PM services in accordance with manufacturer specifications. This includes but is not limited to repairing/replacing hydraulic hoses and leaks, inspecting, repairing/replacing tires, brakes, bearings, filters, hoses, fluids, safety lights and equipment. These tasks are considered major or mandatory maintenance replacements and should be conducted as required by the manufacturer.
2.2 TASK TWO: PM CHECKLISTS
2.2.1. Contractor shall document and record details of each preventative maintenance inspection.
2.2.2. COR approval signature is required at the time of inspection on all PM checklists.
2.3 TASK THREE: UNSCHEDULED REPAIRS
2.3.1. Contractor shall perform minor repairs not previously identified during inspections in timely manner. They shall provide troubleshooting advice and, if necessary, schedule a visit to perform the required minor repairs. For the purpose of this contract, minor repairs are defined as any request for service that are not covered under normal preventative maintenance.
3.0 CONTRACTOR PERSONNEL
Contractor personnel assigned to the maintenance and repair tasks shall possess the necessary qualifications and expertise in accordance with the level of maintenance and repair required for the stated equipment.
3.1 Employee Access
Contractor employees shall contact COR via email or telephone 24 hours prior to arrival on base. If prior notice is not possible, contractor employees must coordinate same day arrivals with COR for escort on base. All contractor vehicles must have proof of state registration and current proof of insurance.
3.2 Employee Identification
Contractor employees visiting Government facilities shall wear clothing or other items (ex. badge) that, at minimum, displays the Contractor name and employee’s photo. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view, above the waist at all times.
3.3 Employee Conduct
Contractor employees shall comply with all applicable Government regulations, policies, and procedures (ex. fire, safety, sanitation, environmental protection, security, off limit areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the USCG or DHS. The COR shall ensure Contractor employees understand and abide by DHS Security established rules, regulations, and policies concerning safety and security.
3.4 Removing Employees for Misconduct or Security Reasons
The Government Facility Commander may remove any Contractor employee from USCG facilities and bar that employee’s re-entry for misconduct or security reasons. The Contracting Officer may recommend that the Contractor remove any Contractor Employee for performance reasons, when a Contractor Employee is not performing to the requirements of this contract. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee for performance reasons.
4.0 SECURITY
Contractor access to classified information is not required under this PWS.
4.1 PERIOD OF PERFORMANCE
The period of performance for this contract is a one-year base period from September 30, 2025 and will expire September 29, 2026.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be the SFLC MLB, located on the USCG Yard Base at the following address: 2401 Hawkins Point Road, BLDG 5A (ICP), Baltimore, MD 21226.
4.3 HOURS OF OPERATIONS
The Contractor Employees shall generally perform all work between the hours of 0700 and 1600
EST, Monday through Friday (except Federal Holidays). However, there may be occasions when contractor employees may need to work other than normal business hours to repair equipment in a timely manner. The COR shall approve any deviation from the hours listed in this PWS.
4.4 PROGRESS REPORTS
The contractor shall submit a monthly progress report to the Contracting Officer and COR via electronic mail. This report is due on the last day of each month and shall include a summary of all contractor work performed, any outstanding repairs, and contractor concerns or recommendations for the previous reporting period.
5.0 GOVERNMENT TERMS AND DEFINITIONS
COR: Contracting Officer’s Representative
DHS: Department of Homeland Security USCG: United States Coast Guard SFLC: Surface forces Logistics Center MLB: Mobile Logistics Branch
6.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
7.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.
8.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an email that includes documented reasons for non-acceptance, If acceptable. If the deliverable is deemed acceptable, the COR will send an email to the Contractor notifying that the deliverable has been accepted.
8.1. The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reason(s) for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
8.2. the COR will have two (2) business days to review deliverables and make comments. The Contractor shall have two (2) business days to make corrections and redeliver.
8.3. All other review times and schedules for deliverables shall be agreed upon by the parties based on the final approved Project Plan. The Contractor shall be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor shall work with personnel reviewing the deliverables to assure that the established schedule is maintained.
9.0 DELIVERABLES
The Contractor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to the next deliverable ort event in this PWS.
ITEM PWS
REFERENCE
DELIVERABLE/EVENT DUE BY DISTRIBUTION
1 2.2.2 Cor Approved PM Checklist
2 business days after inspection
COR, Contracting Officer
2 4.5 Progress Report Last day of month
COR, Contracting Officer
File details come from the government source that posted it. Updated .