PWS_M29000_25_Q_1007_.pdf
PDF 415 KB Posted
- Attached to
- Guam Portable Toilets
- Solicitation number
- M2900025Q1007
- Issued by
-
United States Marine Corps
About this file
This Performance Work Statement (PWS) details portable toilet and hand washing station rental/service requirements for Exercise LUHO V at Skaggs Camp Blaz, Guam from 5 September to 6 October 2025. The contractor must provide 96 total portable toilets and 35 hand washing stations across multiple locations including Skaggs, Northwest Field, and Naval Base Guam, with specific delivery and service requirements. Key service obligations include cleaning and sanitizing facilities every other day, maintaining sufficient toilet paper, providing 24-hour emergency maintenance, using environmentally safe chemicals, and ensuring all units are fully functional.
The contractor is responsible for delivering, servicing, and removing all portable facilities, with precise placement and timing specified for different grid locations. Additional requirements include obtaining necessary base passes, maintaining confidentiality, complying with force protection measures, and adhering to strict quality control standards. The performance standard limits customer complaints to no more than three during the event, with the contractor required to quickly address any service deficiencies. The point of contact for coordination is GySgt Felicia Bangaru, who can be reached at felicia.bangaru@usmc.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_M29000_25_Q_1007_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE OF WORK STATEMENT
PORTABLE TOILET AND HAND WASHING STATIONS
RENTAL/SERVICE REQUIREMENTS
IN SUPPORT OF LUHO V AT SKAGGS CAMP BLAZ, GUAM
1.0 SCOPE OF WORK. In accordance with the schedule of supplies and services, the contractor shall support users who require portable toilet, hand washing stations, flood lights, dumpster, all-terrain forklift, refrigerator unit, portable showers with water, grey water removal, tables, and chairs rental/service during exercise LUHO V. The contractor shall provide portable toilet, hand washing stations, flood lights, dumpster, all-terrain forklift, refrigerator unit, portable showers with water, grey water removal, tables, and chairs rental/service support during the period 5 September – 6 October 2025 as requested on demand to support of US Forces as outlined in section 2.0 of this performance work statement.
2.0 DESCRIPTION OF SERVICES. The contractor shall provide portable toilet, hand washing stations, dumpster support as follows from 5 September – 6 October 2025:
Services Qty Location Start Date End Date POC
Portable Toilets 70 Delivered to grid 55P BQ 69503
93525 SKAGGS, Guam 5-Sep-25
6-Oct-25
GySgt Felicia Bangaru felicia.bangaru@usmc.mil
Handwash Station 35 Delivered to grid 55P BQ 69503
93525 SKAGGS, Guam 5-Sep-24
6-Oct-25
Dumpsters (20FT) 6 Delivered to grid 55P BR 75528
03585 SKAGGS, Guam 5-Sep-24
6-Oct-25
Dumpster (20FT) 2 Delivered to grid 55P BQ 69503
93525 SKAGGS, Guam 7-Sep-25 6-Oct-25
Portable Toilets 4 Delivered to grid 55P BQ 67747
94447 15-Sep-25
20-Sep-25
Portable Toilets 2 Delivered to grid 5P BQ 69714
93245
14-Sep-25
19-Sep-25
Portable Toilets 10 Delivered to grid 55P BQ
4336387148 Naval Base Guam
18-Sep-25
2-Oct-25
Portable Toilets 10 Delivered to grid 55P BR 69489
08469 Northwest Field
14-Sep-25
16-Sep-25
SKAGGS, Camp Blaz 5 September – 6 October 2025:
General Requirements
1.1 PORTABLE TOILETS. The contractor shall provide (96) western style portable toilets at location stated on the Table above (Section 2.0), at a location to be directed by the government. The contractor shall provide and operate all required equipment in the proper cleaning and disposal of all waste, including removal of grey/black water. The contractor shall ensure that toilet paper is in sufficient quantities not to run out in a 24-hour period. The portable toilets shall have toilet paper dispensers full and at least 2 additional rolls inside the latrine at the completion of each servicing.
The contractor shall furnish all labor, supervision, tools, materials, vehicles, equipment, transportation, and other items necessary for performance. The contractor shall provide 24-hour on call emergency maintenance support to fix any potential issue that arises.
1.1.1 The Contractor shall clean and sanitize all portable latrines once every other day. The cleaning intervals shall be no less than five hours and no more than two days between each of the cleanings.
The Contractor shall repair the sinks, toilets, and toilet seats to ensure it is fully mission capable.
1.1.2 The Contractor shall remove non-sewage trash at each cleaning. No excrement or debris shall remain after cleaning. Contractor shall provide wastewater removal.
1.1.3 The Contractor shall maintain a daily written report of the times and dates each latrine was cleaned and update the cleaning log and initial on each portable latrine at each cleaning.
1.1.4 The Contractor shall only use environmentally safe chemicals in accordance with local laws and regulations.
1.1.5 Support date and times need to be flexible in the case of any changes within a 48-hour window.
2.2 HAND WASHING STATIONS. The contractor shall provide (55) western style portable hand washing stations at location stated on the Table above (Section 2.0), at a location to be directed by the government. The contractor shall deliver clean, sanitized, Western-style, free-standing (4) person hand washing stations, filled with soap, water and paper towel dispenser, inclusive of all required water, refueling services, maintenance, and repairs. Each hand washing station must be able to accommodate (4) persons simultaneously on one unit. Each hand washing station must pass an acceptance inspection before the Government takes possession. The hand washing stations shall also be recovered by the contractor from the respective locations at the conclusion of the lease period.
Hand washing stations shall be delivered to the specified location and placed at the U.S. Government directed area. Installation/placement is complete when the hand washing station is clean, functional, stocked, and ready-for-use.
2.2.1 Maintenance of Hand Washing Stations. The services below shall be provided by the contractor every other day. The site officer in charge or a designated representative shall establish the daily service times and the location of the hand washing stations. The contractor is responsible for obtaining verification of completion for each servicing by the designated U.S.
representative.
a. Maintain a clean interior/exterior of each hand washing station.
b. Empty all sewage and wastewater from each hand washing station.
c. Re-Stock each hand washing station daily with soap, water, and paper towels.
d. Replace/replenish soap, water and paper towels.
e. Provide any and all required scheduled and unscheduled maintenance and service including, wastewater removal, the anchoring of units upon request if they are placed near a flight-line or high-wind area. Contractor must be on call for any repairs and unscheduled maintenance.
f. Provide all supplies and labor necessary to service the leased hand washing stations.
g. The U.S. Government shall have unlimited use during the performance of the contract.
2.2.2 Placement Of Hand Washing Stations. The site officer in charge is authorized to direct placement and position of each hand washing station. Placement can and will be in areas not to interfere with military or airport operations.
2.3 DUMPSTER AND TRASH DISPOSAL SERVICES. The contractor shall provide (8) 20-foot large dumpster delivered and staged on the provided grid coordinates (Section 2.0 Table), exact location to be directed by personnel on site. Trash removed every other day throughout the duration of operations from 5 September 2025 through 6 October 2025, no later than 1100 each day.
3.0 LOCAL CONTRACTOR COORDINATION. The Logistics Coordinator will be responsible for ensuring the selected contractors provide the requested services; overseeing initial installation; and reporting service interruptions to the 4th Marines Supply Chief. Assistance with local contractor support representatives can be accomplished by contacting GySgt Bangaru, Felicia / felicia.bangaru@usmc.mil.
3.1 CONTRACTOR RESPONSIBILITIES. The contractor is required the following:
a. In accordance with the performance of this statement of work for the services outlined in Section 2.0, the contractor will provide all qualified personnel/drivers, supervision, transportation, maintenance, operating cost, equipment to unload, tools, materials, and any other necessary supply or service to accomplish the complete performance of the services requested herein.
b. The contractor shall provide the requested services as defined within the specified timeframes in the quantities specified.
c. The Contractor must be capable of providing the required items within a minimum time of 24 hours from time of notification and shall provide a single Point of Contact (POC) that may be reached at any time, 24-hours a day, 7-days a week, for the scheduling of any necessary services.
d. Immediately notify the Contracting Officer upon contractor determination of inability to perform.
e. The contractor will perform all tasks in accordance with Performance Work Statements within this Agreement.
f. Contractor personnel shall at all times be under the supervision of the contractor and not under the supervision of the U.S. Government or any of its officers or employees.
g. The Contracting Officer will bring discrepancies or noncompliance with the contract clauses, specifications, or Statement of g. Work to the attention of the Contractor’s supervisor or foreman for necessary corrective action.
4.0 PERIOD OF PERFORMANCE.
5 September – 6 October 2025 / SKAGGS grid 55P BQ 69503 93525 14 September – 2 October 2025 / Northwest Field / Urban Training area / Naval Base Guam grid(s) 55P BQ 67747 94447; 55P BQ 69714 93245; 55P BQ 4336387148 and 55P BR 69489 08469.
5.0 POINTS OF CONTACTS AND AUTHORITIES. The contracting officer is the only person authorized to approve any changes to the requirements of this contract and not withstanding provisions contained elsewhere in this contract, the authority remains solely the contracting officer. In the event the contractor effects any change at the direction of any person other than the contracting officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price because of the change.
6.0 CONTRACTUAL RELATIONSHIPS. Contractor personnel shall always be under the supervision of the contractor and not under the supervision of the Government or any of its officers or employees.
The contracting officer will bring discrepancies or noncompliance with the contract clauses, specifications, or Performance work statement to the attention of the contractors’ supervisor or foreman for necessary corrective action.
7.0 LIABILITY. The U.S. Government accepts no liability for the actions of the contractor or his employees and agents.
SAFETY & SECURITY
The contractor and their hired employees shall be responsible for ensuring all safety driving requirements are adhered to and shall not at any time during the performance of the lease agreement place in any danger the Government passengers being transported within the leased vehicles. The Contractor is required to comply with force protection measures as directed by the US Government Representative. Driver will sign for responsibility/condition of the US Military cargo. Driver will drive directly to US Military identified destination without stopping. Upon arrival at destination, US Military Rep and contracted Driver will inspect the cargo to ensure no damage/loss. Upon confirmation, US Military Rep will sign for the cargo, relieving contractor from responsibility.
8.0 BASE PASSES.
The contractor is responsible for all required coordination with the Andersen Airforce Base Military Personnel, to obtain base passes or Area Passes that provide appropriate access for their drivers and vehicles to military facilities.
Upon contract award, contractor must provide the following information to delivery POC, GySgt Felicia Bangaru: felicia.bangaru@usmc.mil
9.0 POINTS OF CONTACTS AND AUTHORITIES
The U.S. Government (Exercise Executive Agent) retains the right to make changes to this Performance Work Statement, prior to contract award, based on factors that are unknown at this time (e.g. funding is formally decreased, direction from U.S. Pacific Command due to changing political conditions, dates shift slightly, etc). The contracting officer is the only person authorized to approve any changes to the requirements of the contract and not withstanding provisions contained elsewhere in the contract, the authority remains solely with the contracting officer. In the event the contractor effects any change at the direction of any person other than the contracting officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price as a result of the change.
10.0 OTHER REQUIREMENTS
10.1 QUALIFICATIONS. All work is to be performed by a competent person, experienced and qualified to provide the required services.
10.2 CONFIDENTIALITY. All work discussed or carried-out of during the period of any performance shall remain strictly confidential. A statement of confidentiality will be signed by the supporting Contractor(s) prior to the start of the first Call.
10.3 CONTRACTING OFFICER AUTHORITY. Only the Contracting Officer has the authority to issue changes to this Performance Work Statement - and the corresponding contract - which affect price, quality, quantity, delivery, or any other aspect that will change the terms and conditions of the contract. The Contracting Officer is the only official who has the authority to modify or terminate the contract, or to obligate Government funds.
10.5 BASE ACCESS. Contractor will coordinate directly with local military bases to ensure their employees meet access requirements and are able to perform the contract on the host nation base.
The US government cannot waive any requirements for access to military bases. The contractor is responsible for delivering items to the location specified in this PWS. Inability to access military or host nation locations is NOT a reasonable justification for failure to deliver. Contractor and employees may be required to attend a security briefing prior to accessing the installation.
10.6 INFORMATION DISCLOSURE. Contractor will distribute to all employees the US government provided social media guidance prior to the start of the exercise. The US will monitor Social Media traffic during the exercise for violations of this guidance by contractor s and/or their employees. Violations of the Social Media Guidance may result in contract termination and/or a contractor being barred from future contracts with the US government.
10.7 INCREASES IN FORCE PROTECTION CONDITIONS. US military personnel may increase security measures at any time during the execution of the contract. Contractor will need to maintain communication with Thai military for access control and the Contracting Office or his/her designated representative to stay aware of possible changes.
10.9 LIABILITY: The U.S. Government accepts no liability for the actions of the Contractor or his employees and agents.
10.10 EMERGENCY. The contractor shall provide a point-of-contact (POC) available 24hours for all emergency requirements. The contractor shall be able to provide a response/support within six (6) hours for all emergency calls relative to this requirement.
10.11 The Contractor shall, at no additional cost to the Government, obtain all licenses and permits required for performance of work and for complying with all applicable local, state, and federal laws, rules, and regulations.
11.0 QUALITY CONTROL & ASSURANCE
11.1 The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with each individual call. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means to assure that the work complies with the requirements of the contract. At a minimum, the contractor shall develop quality control procedures that address the performance standards identified in each individual call.
11.2 The performance standard is that the Government receives no more than three (3) customer complaints during the course of the event. The Contracting Officer will take appropriate action upon receipt of complaints to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions-
Commercial Items), if any of the services are not performed to standard. The contractor shall, if any of the services do not conform to the contract requirements, be required by the Government to re-perform the services in conformity with the contract requirements, at no additional expense to the Government.
(End of Performance Work Statement)
File details come from the government source that posted it. Updated .