This is a Performance Work Statement (PWS) for wastewater removal services at Kaloko-Honokohau National Historical Park (KAHO) in Kailua-Kona, Hawaii, issued by the National Park Service Pacific Western Region.
The contractor shall provide comprehensive sewage removal and disposal services including pumping, cleaning, and restocking of five portable toilets and one 5,000-gallon holding tank. Service frequency requirements are: two portable toilets at Kaloko Picnic Area (twice weekly), two portable toilets at 'Aiopio Beach Area (twice weekly), one portable toilet at the NPS Maintenance Yard (once weekly), and the holding tank at Hale Ho'okipa Visitor Center (every three weeks). The contractor must furnish all personnel, equipment, supplies, and disposal services, including pumper trucks and operators. Portable toilet services include pumping wastewater, refilling with biodegradable non-formaldehyde deodorizer, restocking minimum two rolls of recycled toilet paper per unit, and thorough cleaning of spills. The holding tank must be completely emptied, capped, and waste transported to appropriate wastewater treatment facilities in compliance with state and county regulations. Non-recurring services include lift station pumping and emergency additional pumping as needed. All services must be performed Monday through Saturday, 5:00 a.m. to 4:00 p.m. HST, with no Sunday operations or work on federal holidays.
The contractor is responsible for obtaining all necessary permits, licenses, and insurance. All equipment and vehicles must be maintained in safe, professional condition and inspected by NPS personnel. The contract requires a quality control plan with checklists and a designated contract manager available during work hours. Performance thresholds allow no more than three missed scheduled portable toilet services and two missed holding tank services annually, validated through NPS inspection. The contractor must comply with invasive species prevention requirements, including pressure washing all vehicles and equipment before park entry. Work must be confined to designated roads and driveways to protect historical and archaeological resources. The government will appoint a Contracting Officer Representative (COR) to conduct quality assurance inspections and manage day-to-day contract activities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_B_Superintendent_s_Compendium_-_Kaloko-Honok_hau_National_Historical_Park_(U_S__National_Park_Service).pdf | ||
| Appendix_C_Aerial_maps.docx | DOCX document | |
| Wage_Determination.pdf | ||
| Appendix_A_Estimated_work_load_data.docx | DOCX document | |
| Sol_140P8226Q0028.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (PWS)
FOR
WASTE WATER REMOVAL SERVICES PUHO NHP
Kaloko Honokohau NHP Kailua-Kona, Hawaii, 1/22/2026 Prepared by: Ryan Swindler National Park Services (NPS) Pacific Western Region (PWR) – Interior Region 12
1.0 DESCRIPTION OF SERVICES
The Contractor shall provide sewage removal and disposal services at Kaloko-Honokohau National Historical Park (KAHO), located on the west side of Hawai‘i Island in Kailua-Kona.
The Contractor shall remove sewage from the following locations:
1. Kaloko Picnic Area: two (2) portable toilets
2. ‘Aiopio Beach Area: two (2) portable toilets
3. NPS Maintenance Yard: one (1) portable toilet
4. Hale Ho‘okipa Visitor Center: one (1) 5,000-gallon holding tank The Contractor shall perform pumping, cleaning, and restocking services for five (5) portable toilets and shall pump the 5,000-gallon holding tank.
Portable toilets at Kaloko Picnic Area and ‘Aiopio Beach Area shall be serviced twice per week. The portable toilet at the maintenance yard shall be serviced once per week. The holding tank shall be pumped once every three (3) weeks.
The contractor shall accomplish the required services by providing a pumper truck, operator and disposal services for the duration of the contract. The contractor shall provide all management, tools, equipment, and labor necessary to ensure the disposal of wastewater accumulated in the 5 portables and 5000 gallon holding tank.
The Contractor shall perform services at KAHO using designated roads (map attached). The portable toilets and holding tank are inside the park boundary (map attached) behind park gates.
1.1 BACKGROUND
The park visitation exceeds 350,000 people per year. The park relies on contracted wastewater removal services to provide restrooms for park visitors and staff. The biweekly portable toilet pumping service and every three-week holding tank pumping has adequately met the park’s needs in the recent past, provided that service is performed consistently in accordance with the established schedule.
1.2 SCOPE
1.2.1 REOCCURRING SERVICES
The Contractor shall furnish all personnel, supervision, equipment, supplies necessary to pump, service and haul sewage from the five (5) Park owned portable toilets and one (1) septic holding tank.
The portable toilets located at Kaloko Picnic Area and ‘Aiopio Beach Area shall be pumped and serviced 2x per week The portable toilet located at the park maintenance yard shall be pumped and serviced once per week. Holding tank to be pumped every 3 weeks. All service visits shall occur on approved by the COR days.
1.2.1.A PORTABLE TOILET
Each service shall include:
· Pump wastewater from portable holding tanks and refill with a biodegradable, non-formaldehyde, liquid deodorizer solution. Tanks must be refilled with a sufficient amount of liquid so that the recirculation flush filter is completely covered to ensure proper flushing. Contractor shall provide SDS sheets for liquid deodorizer used for the service to the park point of contact prior to the start of contract.
· Thoroughly clean up any spills within or around the portable toilets that may occur during the service. All surfaces contaminated with wastewater or other chemicals must be thoroughly cleaned and disinfected.
· Furnish toilet paper and restock a minimum of two (2) new rolls in each portable toilet. Toilet paper provided shall be made with recycled paper material.
· Immediately clean any spills occurring during service
· Report any spill exceeding five (5) gallons immediately to the COR and perform full remediation at no additional cost to the Government
1.2.1.B HOLDING TANK
The Contractor shall:
· Pump and haul wastewater from 5000 gallon holding tank.
· Empty the holding tank on each visit up to 5000 gallons
· Replace manhole covers and access covers after each pumping and between pumping if multiple trips needed
· Haul waste to wastewater treatment plant for proper disposal in compliance with State and County regulations.
· Maintain Park security by locking all gates traveled through immediately. Gates only to be left unlocked if Park staff are on location or if gate was already open upon arrival
1.2.2 NON-REOCCURRING SERVICES
· Pump Lift station and sludge removal. Up to 500 gallons
· Additional pumping of portable toilets occurring outside of normally scheduled service
· Additional pumping of 5000 gallon holding tank occurring outside of normally scheduled service.
1.2.3 WASTEWATER COLLECTION
The Contractor shall ensure that collected sewage is safe for transport and there is no leakage from tanks, pipes or pumps. The Contractor will maintain park security by locking all gates traveled through immediately. Gates only to be left unlocked if Park staff is on location or if gate was already open upon arrival.
1.2.4 WASTE DISPOSAL
The Contractor shall dispose of all waste from collected tanks at appropriate waste processing facilities.
1.3 Permits, License & Insurance
The Contractor shall be responsible for obtaining and holding all the necessary permits, licenses and insurance required to accomplish these services, including final disposition.
1.4 CONTRACTOR PROVIDED EQUIPMENT AND SUPPLIES.
The Contractor shall provide and maintain all equipment and vehicles necessary to perform the requirements of this contract. The Contractor shall not perform any cleaning, repair and/or maintenance requirements of equipment on site. Maintenance and repair of Contractor containers, vehicles or their privately owned vehicles shall not be accomplished on site. Contractor equipment and vehicles shall be maintained to present a neat, professional appearance. Contractor equipment and vehicles shall be used solely for the intended purpose of performing services in this performance work statement during normal hours of operation.
All equipment used in the performance of this contract shall be in good operable condition. Equipment found to be unsafe and unable to function as designed shall not be used in performance of this contract. The Contracting Officer (CO) or COR may inspect the Contractor’s equipment at any time while on government property and may direct the removal of any unsafe or unusable equipment from those locations.
The Contractor shall provide adequate numbers of equipment items and vehicles to effectively fulfill the scope of this contract. In addition, the Contractor shall maintain or have backup capability to provide continued service in the event primary equipment or vehicles are unsatisfactory or down for extended maintenance or repairs. Equipment failure shall not alleviate the Contractor from performing any requirement contained in this contract.
2.0 CONTRACT PERFORMANCE
2.1 SERVICE SUMMARY (SS):
The Contractor shall document each service visit, including date, time, location, and estimated volume removed, and shall provide records to the COR upon request. The contract service requirements are summarized in the performance objectives below. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SS provides information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.
| Performance Objective |
| PWS Paragraph |
| Performance Threshold (Per Year) |
| Method of Surveillance |
| Portable toilet pumping |
| 1.2.1 |
| No more than three (3) validated missed scheduled service per year |
100% Inspection NPS personnel
| Holding tank pumping |
| 1.2.1 |
No more than two (2) validated missed service per year
100% Inspection NPS personnel
| 2.2 | CONTRACTOR WORK SCHEDULE |
| 2.2.1 | Schedule Submission & Approval |
Portable toilet services shall be provided at a regularly scheduled, approved by the COR times. Kaloko and Aiopio twice per week. NPS maintenance yard once per week. Service shall occur on the same days of each week. The Contractors must notify NPS with schedule changes or delays.
Holding tank pumping services shall be provided every 3 weeks at a regularly scheduled time. Service shall occur +/- 3 days of 3 weeks from the previous pumping. The Contractors must notify NPS with schedule changes or delays.
2.3 PROGRESS MEETINGS
The Contracting Officer (CO), Contracting Officer Representative (COR), other government personnel, as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summary of unsatisfactory inspections and customer complaints and shall provide insight into any identified trends, root cause analysis, and performance improvement plan.
2.3.1 Progress Meeting Minutes
The CO will develop meeting minutes and distribute those minutes to the Government team and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.
2.4 CONTRACTOR’S QUALITY CONTROL
The Contractor shall develop and maintain a quality program to ensure the services described by this PWS are performed in accordance with commonly accepted commercial practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2.0, Service Summary.
2.4.1 Contractor’s Quality Control Plan (QCP)
The Contractor shall develop and maintain a Quality Control Plan that, at a minimum, communicates: (1) What will be monitored; (2) How monitoring will take place; (3) When monitoring will take place; (4) Who will conduct monitoring; and, (5) How monitoring efforts and results will be documented.
2.4.2 Contractor’s Quality Control Checklist(s)
The Contractor shall develop and maintain one or more Quality Control Checklists that align with the Contractor’s QCP and capture, at a minimum, the following: (1) Tasks; (2) Validation of acceptability of tasks; (3) Inspector name; (4) Inspection method; (5) Inspection date; and, (6) Inspection time.
2.5 QUALITY ASSURANCE
The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this PWS. The CO will appoint a primary and alternate representative for management of the day-to-day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the Contractor after contact award. The COR may inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS.
2.6 GOVERNMENT REMEDIES
The Contracting Officer (CO) will follow FAR 52.212-4 Contract Terms and Conditions-Commercial Items, for the contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
| 3.0 | CONTRACTOR PERSONNEL |
| 3.1 | CONTRACT MANAGER |
The contractor shall establish a contract manager or alternate(s) that can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to discuss contract related matters. The contractor shall provide the CO the telephone number(s) where performance validation results and complaints can be reported. This information will be kept updated by the contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.
3.2 CONTRACTOR PERSONNEL APPEARANCE
Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection. All contractor personnel shall always be fully clothed while performing the services of this contract. "Fully Clothed" is deemed to mean that a shirt (or T-shirt), trousers, closed-toe shoes and personal protective equipment, if required, shall always be worn. Tact, diplomacy, and courtesy shall always be used during contact with the community.
3.3 EMPLOYEE RESTRICTIONS
The Government is authorized to restrict employment under the contract of any contractor employee or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
4.0 GENERAL INFORMATION
4.1 DAYS AND HOURS OF OPERATION:
The Contractor shall perform the required services during regular park business hours, Monday-Saturday, from 5:00 a.m. to 4:00 p.m HST.
Sunday: No work will be performed on Sundays
4.2 HOLIDAYS & CLOSURES
No work shall be performed on Holidays. Contractor shall make every effort to schedule work on days other than those noted below.
| New Year’s Day | Labor Day | ||||
| Martin Luther King Jr.’s Birthday | Columbus Day | ||||
| Washington’s Birthday | Veterans Day | ||||
| Memorial Day | Thanksgiving Day | ||||
| Juneteenth National Independence Day | Christmas Day |
Independence Day
| 5.0 | INSTALLATION ACCESS |
| 5.1 | WORK RESTRICTIONS & RESOURCE PROTECTION |
The NPS is the steward of unique resources found within the national parks. The NPS is committed to protecting natural, cultural, historical, archaeological, and other resources found within the parks and the adjacent lands.
All work shall be done on designated driveways and roads. Container Shall be picked up and retrieved from specific location designated by park staff. Containers shall not be dropped in any location other than designated location. All driving and maneuvering shall be done on designated roads and driveways. There are historically significant sites adjacent to roads and driveways, deviation from the designated driving surfaces will result in damage to valuable sites. Contractors will avoid backing or driving onto vegetation
5.1.1 Preservation of Natural Features
The contractor shall comply with the following work restrictions:
1. Prevent damage to natural surroundings.
5.1.2 Invasive Species Prevention
a. General: The introduction of non-native species including invasive weeds and plants; invasive pests such coqui frogs and frog eggs, little fire ants (LFA), and insects including termites; other vertebrae species such as rats, mice, and reptiles; and diseases that spread through contaminated soil can threaten the park’s rare and endangered plants and animals or can create new populations of non-native species not traditionally found in the park. Ensure all vehicles, equipment and machinery are clean and free of invasive weeds and plants, invasive pests, and ROD spread through soil.
b. Vehicles, Equipment, & Machinery: To prevent the spread of invasive species, the contractor shall comply with the following:
1. Vehicles, waste containers, and machinery must be thoroughly pressure washed and visibly free of dirt, mud, plant debris, and invasive pests.
2. The interior and exterior of vehicles, equipment and machinery must be free of rubbish. The interiors of vehicles and the cabs of machinery must be vacuumed clean.
3. All vehicles, equipment, and machinery will be subject to inspection by NPS personnel.
4. All vehicles, equipment, and machinery that do not pass inspection will be turned away. The vehicle will not be allowed into the park for at least 48 hours.
5. All vehicles, equipment, and machinery leaving the park for any reason must be cleaned prior to re-entry into the park and will require re-inspection.
6. All vehicles, equipment, or machinery being stored at a private residence are to be kept in a pest-free area, preferably in a garage, on pavement, and not under trees. Such vehicles, equipment, or machinery will be subject to additional inspection.
5.2 INSTALLATION SECURITY AND ACCESS REQUIREMENTS
Contact the CO/Park staff for guidance on installation security and access requirements.
5.3 SAFETY REQUIREMENTS AND REPORTS
The Contractor shall perform work in a safe manner as required by the Occupational Safety and Health Administration’s (OSHA) requirements. The Contractor shall immediately provide a verbal report to the CO and COR for each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact.
5.4 DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT OR VEGETATION
Damages to government buildings, equipment, or vegetation are addressed in FAR 52.237-2, Protection of Government Buildings, Equipment and Vegetation. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of these properties, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
6.0 APPENDICES
The Government will make all the below listed documents, forms, references and report formats directly addressed within this Performance-Based Work Statement available. Supplements or amendments to the below listed materials from any organizational level may be issued during the life of the contract. When notified by the CO, the Contractor shall immediately implement those changes in publications, which result in a decrease, or no change in the contract price. Prior to implementing any such revision, supplement, or amendment that will result in an increase in contract price, the Contractor shall submit to the CO a price proposal and obtain prior approval. Price proposals shall be submitted within 15 calendar days from the date the Contractor receives notice of the revision, supplement, or amendment giving rise to the increase in cost of performance. Changes in the contract price due to supplements and amendments shall be considered under the FAR 52.212-4, Contract Terms and Conditions – Commercial Items clause. Failure of the Contractor to submit a price proposal within 15 calendar days from the date of receipt of any change, shall entitle the Government to performance in accordance with such change, at no increase in contract price.
APPENDIX A – Estimated Project Schedule– Estimated Workload Data APPENDIX B – Park Visitor Rules APPENDIX C – Aerial Maps