PWS_JLG Repair_Genie S-80x.pdf
PDF 128 KB Posted
- Attached to
- JLG Repair, Genie S-80x Federal contract opportunity
- Solicitation number
- FA487722QA444
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBO_Synopsis_Solicitation - JLG Repair.pdf | ||
| COMBO_Synopsis_Solicitation - JLG Repair.pdf | ||
| Provisions and Clauses_JLG Repair_PDF.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement for
Boom Lift Repair Genie S-80x Repair
1.0. Description of Services. The contractor shall provide all labor, supervision, tools, parts, materials, and equipment necessary to accomplish the repair and inspection on a Genie S-80x Boom Lift, serial# S80X13-10294.
1.1. Repairs. The contractor shall perform the following repairs.
• Replace turbo 70006340
• Repair right rear drive wheel seal leak 227775GT
• Repair left rear drive wheel seal leak 227775GT
• Valve body in center of unit – Bad O Rings – Leak
• Basket level cylinder leak – reseal cylinder 237237GT
1.2. Location of Repairs. Work shall be accomplished at the contractor’s place of business.
1.3. Pick Up and Delivery. The contractor shall pick up and return the boom lift from 655 AMXS, between the hours of 8:00 a.m. and 4:00 p.m., utilizing a contractor vehicle. Loading and unloading of the boom lift is the sole responsibility of the contractor. Any damages incurred during loading, unloading, or transport of the boom lift shall be the responsibility of the contractor. The contractor shall call the Government point of contact, at (520) 228-0254 to arrange a date and time for pick and return of the boom lift.
1.4. Additional Repairs. The contractor shall notify the Contracting Officer of any additional necessary repairs and recommend corrective action. The contractor shall not perform additional repairs without prior approval of the Contracting Officer and the issuance of a contract modification.
1.5. Workmanship. All repairs shall be performed to the highest standards of the trade and shall conform to all codes governing that trade. All work performed shall be in accordance with all requirements of the State of Arizona and local codes.
1.6. Maintenance Manuals, Certification, and Warranty Documents. Upon completion of repairs, the contractor shall provide the Government point of contact with all necessary maintenance manuals, certifications, and warranty documents.
2.0. General Information
2.1. Contractor Point of Contact. The contractor shall designate a Contract Manager (CM) who is responsible for contractor-performed services. Upon contract award, the contractor shall submit the name and telephone number of the CM, in writing/e-mail, to the Contracting Officer.
The CM shall have full authority to act for the contractor on all matters relating to the execution of the contract and be available during regular business hours.
2.2. Contractor Employee Restrictions. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population.
2.3. Environmental Laws and Regulations. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection.
The contractor is responsible for any penalties, fines, etc. resulting from violations. The contractor shall immediately notify the Contracting Officer when violations occur, and cooperate fully with Government personnel.
2.4. Safety. The contractor shall comply with all local, state and federal laws and safety regulations. Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor, and the Government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such responsibilities. The contractor is responsible for furnishing contractor employees with all necessary personal protective equipment to perform services.
2.5. Safety Monitoring. The Government reserves the right to require safety and/or Quality Assurance monitoring of delivery, transfer and/or pickup operations performed by the contractor.
The direction or local guidelines conveyed by safety regarding delivery, transfer/loading operations are to be followed in strict compliance.
2.6. Government Inspection. All contractor performed services in the contract are subject to inspection and review by Government personnel.
2.7. Security Requirements
2.7.1. Contractor Travel on Davis-Monthan Air Force Base (DMAFB). Contractor employees shall not loiter in any working area before or after performing services. All contractor employees shall limit their travel on DMAFB only to the specific areas required for performance of services or in travel directly to and from these locations. Upon completion of contract work, contractor employees shall promptly depart DMAFB.
2.7.2. Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges, debarment from the base, or other administrative action.
2.7.3. Traffic Laws. Contractor employees shall comply with all base traffic regulations.
Contractor employees are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of seat belts is mandatory for all vehicle occupants. The use of cell phones is prohibited while driving on base, unless the phone is a hands-free cell phone.
2.7.4. Weapons, Firearms, And Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned or privately owned vehicle while on DMAFB.
2.7.5. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware which may pose a threat to the security of DoD or contractor personnel, resources, and classified or unclassified defense information.
2.7.6. Physical Security. The contractor is responsible for safeguarding all Government property in their possession.
| Performance Work Statement |
| for |
| Boom Lift Repair |
| Genie S-80x Repair |
File details come from the government source that posted it. Updated .