PWS_JBLM FAS Maintenance and Repair Draft 7-15-26.pdf
PDF 424 KB Posted
- Solicitation number
- PANMCC26P0000045484
About this file
Performance Work Statement Summary
This Performance Work Statement (PWS) dated July 15, 2026, outlines comprehensive full-service maintenance and repair services for Fire Alarm and Suppression Systems (FASS) at Joint Base Lewis-McChord (JBLM) and Yakima Training Center (YTC) in Washington. The contract is structured as a non-personal services arrangement with a base year of 12 months and four optional one-year periods. The Contractor must provide all management, supervision, certified labor, materials, equipment, and replacement parts necessary to ensure operational readiness and compliance of all FASS components. Work will be performed Monday through Friday, 0700-1600 hours, excluding federal holidays, though emergency calls are required on holidays. All services must comply with UFC 3-601-02 (Fire Protection Systems Inspection, Testing, and Maintenance, Change 1, dated April 18, 2025) and AFCESA/CES Technical Report 01-10, which take precedence over other standards including NFPA standards 10-25, 70, 72, and 96.
The Contractor must maintain specialized expertise in legacy and obsolete fire protection systems, with dedicated personnel including a Fire Alarm Supervisor and Water-Based System Supervisor holding NICET Level III certifications and minimum 10 years of experience with legacy systems. Fire Alarm and Water-Based System Technicians must hold NICET Level II certifications, valid Washington EL06 Limited Energy System licenses, and minimum five years of experience specifically including legacy system repair and remanufactured parts utilization. The contract requires comprehensive deliverables including an Initial System Inventory and Readiness Audit (base year only), Service Delivery Plan (within 30 days of award), weekly status reports, monthly performance and cost reports, and quarterly personnel qualification updates. Cost limitations are established: $150,000 per year for parts and materials under full-service ITM with 960 labor hours annually; $25,000 per year for wet chemical kitchen hood systems with 250 labor hours annually. The Contractor must submit comprehensive ITM reports within three working days of completion and maintain real-time impairment logs, with troubleshooting to be completed within three working days and repairs within 30 working days of system ITM.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FIRE ALARM AND SUPPRESSION SYSTEMS (FASS) FULL-SERVICE MAINTENANCE
AND REPAIR SERVICES
JOINT BASE LEWIS-MCCHORD (JBLM) AND YAKIMA TRAINING CENTER (YTC),
WASHINGTON
7/15/2026
PART 1 GENERAL INFORMATION
1. General: This is a non-personal services contract to provide Fire Alarm and Suppression Systems (FASS) Full-Service Maintenance and Repair Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction: This Performance Work Statement (PWS) outlines the requirements for a comprehensive full-service maintenance and repair program for Fire Alarm and Suppression Systems (FASS) at Joint Base Lewis-McChord (JBLM) and Yakima Training Center (YTC), WA. The contractor shall provide all necessary management, supervision, labor, materials, and equipment to ensure the operational readiness and compliance of all FASS components. This PWS places special emphasis on the sustainment of obsolete and legacy systems, requiring the contractor to demonstrate specialized expertise in this area. The term “FASS” in this PWS includes all equipment listed in Technical Exhibits (TE’s) TE-A: 2027 Components and ITM Schedule, TE- B: 2027 Alarm Initiating Devices Listing, TE-C: 2027 Alarm Notification Appliances, TE-D: 2027 Batteries Information, TE-F: 2027 Wet Chemical Kitchen Hoods
1.2. Background: The contract work is located at Joint Base Lewis-McChord (JBLM), which consists of Lewis North, Lewis Main, McChord Field, and Yakima Training Center (YTC). JBLM is a United States Army Joint Base primarily located in Pierce and Thurston Counties, Washington.
YTC is located in Yakima County, Washington east of the Cascade Mountains.
1.3. Objectives: The objective of this contract is to provide complete full-service maintenance, repair inspecting and testing services to FASS in accordance with (IAW) Unified Facilities Criteria (UFC) 3-601-02 Change 1, 18 April 2025, Fire Protection Systems Inspection, Testing, and Maintenance and in-scope tables, AFCESA/CES Technical report 01-10, National Fire Protection Association (NFPA) Standards 10 through 25, 70, 72, 96, JBLM requirements and the manufacturer’s instructions.
The Unified Facilities Criteria (UFC) 3-601-02 and AFCESA/CES Technical report 01-10 shall take first precedence over other guidance. All work not specifically mentioned, which is required to ensure that maintenance and repairs are complete and are within the intent of this contract, shall be performed without additional cost.
1 .4. Scope: The Contractor shall provide services outlined in PART 5 - SPECIFIC TASKS of this PWS. The Contractor shall meet the following objectives:
1.4.1. Initiation Assessment and Technical Exhibit Validation (IATEV): The Contractor shall perform a preliminary inspection and assessment of fire alarm and suppression systems and validate technical exhibits (TE-A through TE-J) for the base year. The IATEV shall be completed during the base period of performance and conducted in conjunction with scheduled ITM. Refer to Section 5.3, Initial System Inventory and Readiness Audit.
1.4.2. Inspection, Test, and Maintenance: The Contractor shall perform fire alarm, suppression, and sprinkler system ITM services for facilities at JBLM and YTC, as identified in Technical Exhibit A (TE-A). Although the provided facilities list is believed to be accurate, the Government reserves the right to increase or decrease the facility quantity by up to 10% during the contract's period of performance.
1.4.3. Full-Service ITM Reports and Repairs: The Contractor shall develop and submit comprehensive ITM reports for all inspected facilities and systems. Each report shall include detailed written findings from the inspection.
1.4.4. Full-Service Maintenance and Repairs. The Contractor shall provide a comprehensive, full-service maintenance and repair program for all covered fire protection and life safety systems. "Full-service" is defined as the Contractor providing all management, supervision, certified labor, equipment, replacement parts, and materials necessary to perform preventative maintenance, routine repairs, and emergency service calls. All maintenance and repairs shall be performed in strict accordance with original equipment manufacturer (OEM) specifications and applicable National Fire Protection Association (NFPA) standards to maximize system service life.
1.5. Special Qualifications:
1.5.1. General Qualifications: General Qualifications: The Contractor shall be licensed to perform fire protection system work in the State of Washington, in accordance with UFC 3-601-02, paragraphs 1-8.1.1 and 1-8.13. All personnel performing work on these systems must meet the State's definition of fire systems maintenance personnel as defined in the Washington Administrative Code (WAC) 296-46B, Revised Code of Washington (RCW) 19.28, and RCW 18.160. Technicians must hold and provide evidence of a valid State of Washington EL06 Limited Energy System license. Copies of all required licenses, certifications, and relevant experience for personnel assigned to this contract shall be submitted to the Contracting Officer's Representative (COR) no later than ten (10) days prior to the commencement of work.
1.5.1.1. Apprentices and Trainees: Unlicensed apprentices or trainees may be utilized on this contract provided they are actively enrolled in a recognized state or national fire protection training program. Apprentices and trainees shall not independently perform any ITM services or repairs. They may only perform work under the direct, continuous, on-site supervision of a qualified technician who holds the requisite EL06 license and a minimum of a NICET Level II certification.
1.5.2. Project Manager: The Contractor shall provide a Project Manager who shall be responsible for the performance of the work. Contractor shall provide the name of the Project Manager and alternate to the KO and COR via ema il within five (5) business days of contract start and within five
(5) business days as changes to key personnel are made. The Project Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract and must be listed on the Authorization Letter.
1.5.3. Fire Alarm Supervisor: The Fire Alarm Supervisor shall direct and coordinate the inspection, testing, and repair of fire alarm systems. The Contractor may utilize a single individual to serve concurrently as both the Fire Alarm Supervisor and the Water-Based System Supervisor (dual-hatted), provided the individual meets all licensing, certification, and experience requirements for both positions.
The Contractor shall submit the names of the Fire Alarm Supervisor and an alternate to the KO and COR via email within five (5) business days of contract award, and within five (5) business days of any subsequent change to key personnel. The Fire Alarm Supervisor or alternate shall be available to arrive on-site within two (2) hours of notification during the hours of operation, as described in PWS paragraph 1.10. The Supervisor shall provide evidence of a valid State of Washington EL06 Limited Energy System License, an active National Institute for Certification in Engineering Technologies (NICET) Level III certification in Fire Alarm Systems, and a resume documenting a minimum of ten
(10) years of experience in the repair and maintenance of legacy/obsolete systems and the utilization of remanufactured replacement parts.
1.5.3.1. Core Responsibilities Fire Alarm: Duties shall include, but are not limited to:
• Directing and supporting technicians performing fire alarm work;
• Scheduling daily tasks, assigning work orders, and ensuring quality control;
• Providing training on equipment, safety procedures, and code compliance;
• Reviewing, troubleshooting, and approving work on fire alarm panels, detectors, notification appliances, and related components;
• Ensuring proper documentation of inspection, testing, and maintenance (ITM) activities to meet UFC and NFPA standards;
• Participating in system repairs and component replacements;
• Reviewing plans, submittals, and technical drawings; and managing inventory, tools, and subcontractor/vendor relationships.
1.5.4. Water-Based System Supervisor: The Water-Based System Supervisor shall direct and coordinate the inspection, testing, and repair of water-based systems. This individual shall oversee the fire pump testing program and analyze pump flow test results against manufacturer pump curves.
The Contractor shall submit the names of the Water-Based System Supervisor and an alternate to the KO and COR via email within five (5) business days of contract award, and within five (5) business days of any subsequent change to key personnel. The Water-Based System Supervisor or alternate shall be available to arrive on-site within two (2) hours of notification during the hours of operation, as described in PWS paragraph 1.10.
The Water-Based System Supervisor shall provide evidence of valid licensing, including an active State of Washington Journey-Level Sprinkler Fitter Certification issued by the State Fire Marshal’s Office, proof of National Institute for Certification in Engineering Technologies (NICET) Level III certification in Water-Based Systems Layout, and a resume documenting a minimum of ten (10) years of experience in the repair and maintenance of water-based systems, fire pumps, and foam systems.
1.5.4.1. Core Responsibilities Water Based Systems: Duties shall include, but are not limited to:
• Directing and supporting technicians performing water-based systems work;
• Scheduling daily tasks, assigning work orders, and ensuring quality control;
• Providing training on equipment, safety procedures, and code compliance;
• Reviewing, troubleshooting, and approving work on water-based system components;
• Overseeing suppression systems, including sprinklers, clean agent systems, kitchen hood systems, and special hazard systems;
• Ensuring proper documentation of ITM activities to meet UFC and NFPA standards;
• Participating in system repairs and component replacements;
• Reviewing plans, submittals, and technical drawings; and
• Managing inventory, tools, and subcontractor/vendor relationships.
1.5.5. Fire Alarm System Technician: The Contractor shall ensure all Fire Alarm System Technicians provide evidence of a valid State of Washington EL06 Limited Energy System License, as electrical trainees shall not be accepted for this role. Technicians shall possess a minimum of an active National Institute for Certification in Engineering Technologies (NICET) Level II certification in Fire Alarm Systems for all work involving the inspection, testing, maintenance, repair, or replacement of these systems. Furthermore, assigned technicians must demonstrate a minimum of five (5) years of experience while holding the NICET Level II certification. This experience must verify their competency in interpreting system documentation, conducting functional tests, troubleshooting, identifying deficiencies, and ensuring strict compliance with applicable UFC, NFPA, and manufacturer standards. Finally, the required experience must explicitly include the repair and maintenance of legacy or obsolete systems, the utilization of remanufactured replacement parts, and direct collaboration with manufacturers’ technical support to resolve complex technical issues.
1.5.6. Water-Based System Technician: The Contractor shall ensure all Water-Based System Technicians provide evidence of an active State of Washington Journey-Level Sprinkler Fitter Certification issued by the State Fire Marshal’s Office, as uncertified trainees shall not be accepted for this role. Technicians shall possess a minimum of an active National Institute for Certification in Engineering Technologies (NICET) Level II certification in Inspection and Testing of Water-Based Systems for all work involving the inspection, testing, maintenance, repair, or replacement of these systems. Furthermore, assigned technicians must demonstrate a minimum of five (5) years of experience while holding the NICET Level II certification. This experience must verify their competency in interpreting system documentation, conducting functional pump and flow tests, troubleshooting, identifying deficiencies, and ensuring strict compliance with applicable UFC, NFPA, and manufacturer standards. Finally, the required experience must explicitly include the repair and maintenance of legacy or obsolete water-based systems (including fire pumps and foam systems), the utilization of remanufactured replacement parts, and direct collaboration with manufacturers’ technical support to resolve complex mechanical or hydraulic issues.
1.5.7. Fire Pump Technician: Contractor technicians shall provide evidence of valid licensing, including an EL06 Limited Energy System License (electrical trainees will not be accepted), proof of National Institute for Certification in Engineering Technologies (NICET) Level II certification in Inspection and Testing of Water-Based Systems, and a minimum of five (5) years of experience in the repair and maintenance of electric and diesel-driven fire pumps, including calibrating pressure switches and relief valves.
1.5.8. Apprentices or Trainees: Apprentices or trainees are not considered to have an acceptable skill level or experience to perform work on the equipment unless they are under hands-on supervision at all times and provide evidence of valid licensing, including an EL06 Limited Energy System License (electrical trainees will not be accepted). Apprentices or trainees are considered support personnel for approved NICET technicians and are not included in the NICET technician labor costs identified in paragraph 5.6.6.2.
1.5.9. Pre-Engineered Kitchen Fire-Extinguishing Equipment: Contractor technicians performing inspection, testing, and maintenance (ITM) on kitchen suppression systems (Wet Chemical Systems) shall provide evidence of valid ICC/NAFED certification for pre-engineered industrial fire-extinguishing systems, along with a minimum of five (5) years of experience in repair and maintenance. A technician holding NICET Level II certification in Fire Alarm Systems must be present to monitor the functionality of the fire alarm control panel during ITM procedures.
1.5.10. Key Personnel Table:
Role Required Licenses & Certifications
Minimum Experience Key Responsibilities
Project Manager N/A N/A Responsible for overall contract performance and daily operations. Must have full authority to act for Contractor.
Fire Alarm Supervisor (Dual-hatted role allowed)
WA EL06 Limited Energy System License;
NICET Level III in Fire Alarm Systems
10 years in repair/maintenance of legacy/obsolete systems and utilizing remanufactured replacement parts.
Direct/support technicians, daily task scheduling, QC, safety training, troubleshooting/approving panel work, UFC/NFPA documentation.
Role Required Licenses & Certifications
Minimum Experience Key Responsibilities
Water-Based System Supervisor (Dual-hatted role allowed)
WA Journey-Level Sprinkler Fitter Certification (State Fire Marshal); NICET Level III in Water-Based Systems Layout
10 years in water-based systems fire pumps and foam systems.
Direct/support technicians, oversee pump testing program, analyze flow tests, oversee suppression systems (sprinklers, clean agents, kitchen hoods).
Fire Alarm System Technician
WA EL06 Limited Energy System License (no trainees); Active NICET Level II in Fire Alarm Systems
5 years (while holding NICET II) including legacy/obsolete system repair remanufactured parts and vendor troubleshooting.
Document interpretation, functional tests, troubleshooting, deficiency identification, code/standards compliance.
Water-Based System Technician
WA Journey-Level Sprinkler Fitter Certification (no trainees); Active NICET Level II in Water-Based Systems.
5 years (while holding NICET II) including legacy water systems fire pumps foam systems and manufacturer collaboration.
Document interpretation, functional pump/flow tests, troubleshooting, compliance, and component repairs.
Fire Pump Technician
WA EL06 Limited Energy System License (no trainees); Active NICET Level II in Water-Based Systems Layout
5 years in repair/maintenance of electric/diesel-driven fire pumps.
Calibrating pressure switches and relief valves, fire pump repair, and maintenance.
Kitchen Fire- Extinguishing Technician
ICC/NAFED
certification for pre-engineered industrial fire-extinguishing systems
5 years in repair and maintenance of wet chemical systems.
ITM on kitchen suppression systems.
(Must have a NICET Level II Fire Alarm Tech present to monitor the control panel).
Apprentices / Trainees
Active enrollment in a recognized state/national training program; Valid EL06 license
N/A (Entry/Support level)
Support approved NICET technicians. Cannot independently perform ITM or repairs. Must work under direct, continuous, on-site supervision of an EL06 + NICET Level II technician.
1.5.9. Underwriters Laboratories offers several types of alarm system certification categories. The two UL certifications recommended are “Central-station Protective Signaling Services” and “Local, Auxiliary, Remote Station and Proprietary Protective Signaling Services.”
1.6. Period of Performance: The Period of Performance (POP) shall be for one (1) Base Year of 12 months and four (4) Option Years of 12 months each.
1.9. Federal Observed Holidays: The following holidays are observed. The term “Federal Holiday” includes days on which Federal Holidays are observed in lieu of the actual holidays.
The Contractor is not required to perform routine maintenance and repair services on holidays.
The Contractor shall be required to respond to emergency maintenance and repair calls on holidays.
New Yea r’s Da y Labor Da y Martin Luther King Jr.’s Birthday Columbus Da y President’s Da y Veteran’s Da y Memoria l Da y Thanksgiving Da y Juneteenth Christmas Day Independence Day
1.10. Hours of Operation: Normal working hours for routine maintenance and repair is between 0700-1600 Monday through Friday, except federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed closures. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when a Government facility is not closed for the above rea sons.
1.11. Emergency Service Calls: Shall be performed during normal working hours.
1.12. Quality Control / Quality Assurance
1.12.1. Quality Control Program (QCP): The Contractor shall develop and maintain an effective QCP to ensure all services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is how the Contractor assures that all work complies with contract requirements. The QCP is to be submitted to the Contracting Officer (KO) and COR by e-mail within ten (10) business days after contract award. Any changes made thereafter shall be submitted to the COR by e-mail within five (5) business days. After COR acceptance of the initial QCP, the Contractor shall receive the COR’s acceptance in writing of any proposed change to the QCP. The Contractor shall provide the CS and COR copies of its Quality Control documentation quarterly within five (5) business days from the end of the quarter.
1.12.2. Quality Assurance Plan: The Government will evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.12.3. Government Remedies: In the event that the Contractor fails to perform satisfactory services or fails to correct non-conforming services, the KO shall seek remedy in accordance with the contract clauses.
1.13. Security Requirements:
1.13.1. Physical Security: The Contractor shall safeguard all Government equipment, information and Lay Down property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.13.2. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys to the COR.
1.13.3. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the KO or COR, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re- keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment(s) due the Contractor.
1.13.4. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO or COR.
1.14. Display of Identification Badges: Each Contractor employee shall wear a Government-furnished identification badge while performing work under the contract. All Government-furnished, and Fast Access identification badges shall be worn prominently on the upper front of the outer garment unless precluded by Occupational Safety & Health Administration (OSHA) regulation(s).
Contractor-furnished identification badges shall not be used for access to any Government installation.
1.15. Post Award Conference / Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity. The KO, COR, and other Government personnel (as appropriate) shall meet Quartly with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of any issues being experienced. Appropriate action will be taken to resolve any outstanding issues that have been identified. The Contractor’s participation at these meetings shall be at no additional cost to the Government.
1.16. Contracting Officer’s Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the functions identified in the letter of appointment issued to the COR and the Contractor. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.17. Anti-Terrorism (AT) / Operations Security (OPSEC
1.17.1. AT Level I Awareness Training: All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas, shall complete AT Level I Awareness Training within ( 3 0 ) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the KO, if a COR is not assigned, within seven (7) calendar days after completion of training by all employees and subcontractor personnel. AT Level I Awareness Training is available at the following website: https://jkodirect.jten.mil
1.17.2 iWATCH Training: The Contractor shall brief the local iWATCH program to all of the Contractor’s employees and associated subcontractor employees. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/ACOR. The Contractor shall complete the training within thirty (30) calendar days of contract award and within five (5) calendar days of new employees commencing performance with the results reported to the COR NLT thirty (30) calendar days after contract award. iWATCH training can be found at the following website: https://www.dvidshub.net/video/583923/iwatch-2018.
1.17.3. OPSEC Training: Per AR 530-1 Operations Security, the Contractor employees must complete Level I OPSEC Awareness training within (10) business days after contract award. New employees must be trained within (30) calendar days of their reporting for duty and annually thereafter. These courses are available online at the following website: https://securityawareness.usalearning.gov/opsec/index.htm
1.17.4. Installation Access and General Protection/Security Policy and Procedures:
Contractor personnel who require access to JBLM to perform work under any contract must obtain an Automated Installation Entry (AIE) access badge or a visitor's pass. Contractor personnel shall comply with applicable installation, facility, and area commander installation access and local security policies and procedures. The Contractor shall provide all information required for background checks to meet installation access requirements to be accomplished by the Directorate of Emergency Services (DES). All affected Contractor personnel shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government will require changes in Contractor security matters or processes.
For Contractors not eligible for a Common Access Card (CAC), but require access to a DoD facility or installation, the Contractor and all associated subcontractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by a Government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.17.5. Controlled Unclassified Information (CUI) Training: All contractor employees, including subcontractor employees, shall complete DoD mandatory Controlled Unclassified Information (CUI) training within Thirty (30) calendar days after contract award and every two (2) years thereafter. The Contractor shall provide proof of completion, to the COR within seven (7) calendar days after completion of training by all employees and subcontractor personnel. New employees shall be trained within 30 calendar days of their hiring and every two (2) years thereafter.
CUI training is available at the following website: https://securityawareness.dcsa.mil/cui/
1.18. Emergency Services and Emergency Medical Treatment: FOR IMMEDIATE EMERGENCY PERSONNEL RESPONSE DIAL 911. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. Madigan Army Medical Center (MAMC), Bldg.
9040 is available as the first point of emergency medical care for injuries occurring on the installation.
Fees associated with emergency medical treatment are the sole responsibility of the Contractor and are not reimbursable. Contractor personnel shall immediately notify their supervisor, whenever possible, of any accident requiring emergency medical treatment. The Contractor shall, in turn, notify the COR by telephone and email not later than one (1) hour following the incident
1.18.1. Accident and Damage Report: Contractor shall provide a verbal report to the COR as soon as possible but not later than four (4) hours after each occurrence of damage to Government property or an accident resulting in death, lost workday, injury, occupational disease, or adverse environmental impact.
Provide a completed copy of required Accident Investigation Reports to the COR within five (5) calendar days of each occurrence. Comply with Occupational Safety and Health Administration (OSHA) and EM 385-1-1, Section 1, for record keeping and reporting of all accidents. ACCIDENT AND DAMAGE REPORT FORMS: Where specific OSHA or EM 385-1- 1 forms are not required, use forms of the Contractor's own design.
1.19. Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose.
This right does not abrogate any other Government rights.
1.20. Environmental
1.20.1. Environmental Management System (EMS): The JBLM EMS conforms to the criteria defined in the International Standard, ISO 14001:2004 Environmental management systems – Requirements with guidance for use. In accordance with EMS procedures, the Contractor shall be familiar with the JBLM environmental policy and shall ensure that this information is considered and incorporated into this project. Additional information regarding the JBLM EMS is available from the installation EMS Coordinator (253-966-6470). Both the JBLM environmental policy and an environmental awareness training resource are available at the JBLM EMS webpage: https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division
1.20.2. Sustainable Acquisition: In order to comply with federally mandated sustainable acquisition requirements and Department of Defense (DOD) and Department of the Army (DA) Green Procurement Program (GPP) policies, JBLM requires the purchase, supply, and use of environmentally preferable products and services. Program elements include recovered material products, energy and water efficient products, alternative fuels and fuel efficiency, bio-based products, non-ozone depleting substances, and environmentally preferable products. For a listing of designated items, associated requirements and managing program websites, see https://sftool.gov/greenprocurement. The Contractor shall comply with all applicable Federal, DOD, Army, and JBLM sustainable acquisition laws and policies. If compliant products are unavailable or determined to be impracticable based on cost or performance, the Contractor shall contact the KO or their representative for further guidance. Additional information is available from the JBLM Sustainable Acquisition Program at (253) 966-6466.
1.20.3. Hazardous Materials: For any hazardous materials, the Contractor shall submit an initial list of hazardous materials to be used (including unit of measure and Safety Data Sheet for each product). A copy of these documents shall be submitted to the JBLM Pollution Prevention Program (usarmy.jblm.id-readiness.list.dpw-aul1@army.mil) prior to commencement. These items must be reviewed by Pollution Prevention and authorized for use by addition to the Contractor’s Authorized Use List (AUL). The Contractor shall not use any hazardous materials not listed on their current AUL. The Contractor shall submit a hazardous material inventory on HJB Form 953 noting the hazardous materials used, the units of measure, quantities used, storage locations, and other information indicated on the form. This inventory shall be submitted by the 15th day following the calendar year quarter in which the hazardous materials were used or stored on JBLM. All HJB 953 inventories shall be submitted electronically and addressed to the KO or COR with usarmy.jblm.id-readiness.list.dpw-hm-inventory1@army.mil included in the carbon copy (“Cc”) line of the email. Questions regarding the form may be directed to the JBLM Pollution Prevention Program at (253) 966-6469. The current HJB Form 953 is available at Section 01 57 19 of the JBLM Design Standards (https://www.jblmdesignstandards.army.mil/).
1.20.4. Wastewater: Disinfectant and some cleaning products are sensitive pollutants for the Wastewater Treatment Plant given the biological processes involved. Should any discharge of wastewater into the sanitary sewer system be necessary, a Temporary Discharge Permit must be approved prior to discharging. The application form can be obtained online at the Pretreatment website (https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-services/public_works-environmental_division/wastewater) or by emailing Pretreatment at usarmy.jblm.imcom-central.list.dpw-pretreatment@army.mil.
1.20.4.1. In accordance with JBLM Reg. 200-2, any wastewater generated must be collected, processed, characterized, and disposed of into the JBLM sanitary sewer system or other authorized disposal method.
Prior to disposal, wastewater characterization must at a minimum include pH, Oil and Grease, BOD, and
TSS analysis by a NELAC accredited laboratory. Additional analyses may be required if non-conventional wastes or hazardous materials are potential contaminants. Results shall be submitted for review and approval by Public Works.
1.20.4.2. Flushing sprinkler systems: Must be managed in such a way that contaminated water shall be disposed of in a manner consistent with the Clean Water Act, JBLM Regulation 200-2, and JBLM National Pollutant Discharge Elimination System (NPDES) permits. At no time shall the wastewater be discharged to the ground or storm sewer system. All wastewater generated during fire alarm suppression and sprinkler flushing maintenance shall be collected and tested for contaminants prior to disposal. Based upon sampling results, either a JBLM temporary discharge permit may be requested and approved to discharge the wastewater to JBLM sanitary sewers, or if not approved, the Contractor shall proceed to collect the wastewater in portable tanks to be sent offsite for disposal as required.
1.20.5. Lead-Containing Paint: If repair work is required on a system and the repair requires penetration of the building structure, prior to the repair, the Contractor shall perform a complete lead paint inspection of all areas affected by the work described in this PWS in accordance with all Federal and Local regulations. A Certified Lead Paint Inspector shall perform the inspection. The inspection documentation shall comply with Federal and Local regulations and shall include identification of all lead paint, its location, quantity, and percentage by weight and Toxic Characteristic Leaching Procedure (TCLP) characteristics. No penetration will be done without COR notification.
1.21. Anti-Idling: The Contractor shall monitor its use of vehicles and other energy consuming equipment for abuse and unnecessary use beyond that needed to perform the services in accordance with this PWS. The Contractor shall turn off engines when vehicles and equipment are parked, or a driver/operator is not at the controls unless maintenance operations require the engine to be idling. The Contractor shall idle engines for no longer than is necessary to produce sufficient temperature and pressure for vehicle operation.
1.22. LAND RESOURCE. A lay-down area will be provided at no charge upon request by the Contractor for use in performing this contract, subject to the normal Directorate of Public Works permitting process. (a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the lay-down area, which are not to be removed. The Contractor shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the COR. (b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the lay- down area, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in utilizing the lay-down area. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
1.23. OPERATIONS AND STORAGE AREAS: (a) The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized by the Government. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance (b) Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. Facilities shall meet all fire code requirements and provide adequate ventilation, containment, and protection from the elements. Provide warning signs, limit access to the facility, and lock it when it is unattended. The Contractor shall pay for the hook up and use of all utilities at the lay-down area. Do not use the lay-down area provided by the Government for any purpose other than in the performance of this contract. No materials shall be stored in vehicles overnight or for any length of time. (c) When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation.
PART 2
DEFINITIONS
& ACRONYMS
2. Definitions and Acronyms
2.1. Definitions
2.1.1. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2. Contracting Officer (KO): A person duly appointed with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government.
The KO is the only individual who can legally bind the Government.
2.1.3. Contracting Officer’s Representative (COR): An individual designated in writing by the KO to perform specific contract administration functions. The KO has the overall responsibility to ensure that all requirements of law and regulation are followed for this contract. However, as the KO’s representative, the COR is delegated the authority to monitor compliance and performance of the Contractor and its employees under this contract. The COR will attempt to resolve compliance or performance issues with the Contractor but, failing resolution, will report them to the KO. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or delivery dates.
Other than the KO, the COR is the only Government employee who may direct the flow of technical matters between the Government and the Contractor. Therefore, while the COR can and must make technical decisions, the COR shall not take any action unless it is clearly authorized by the COR designation letter or by terms of this contract. This individual does NOT have the authority to change the terms and conditions of the contract.
2.1.4. Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5. Deliverable: Something that can be delivered; may be a physical item or a non-manufactured thing such as meeting minutes or a report.
2.1.6. Fire Alarm and Suppression Supervisor: The Fire Alarm and Suppression Supervisor is a technical and leadership professional responsible for overseeing the installation, inspection, testing, maintenance, and repair of fire alarm systems and fire suppression systems within a facility or across multiple locations. They are the Government direct point of contact for all technical questions. This role ensures that all life safety systems comply with contract requirements, applicable codes, standards, and regulatory requirements, and manufacturer specifications
2.1.7. Full Service Maintenance, Repair, and Replacement: A comprehensive, all-inclusive service model in which the contractor is fully responsible for keeping all fire alarm and fire suppression systems in proper working order. Under this model, the contractor provides all labor, materials, parts, tools, testing, inspections, emergency response, and system component replacements necessary to maintain the systems in compliance with applicable codes, standards, and manufacturer requirements.
2.1.7.1. This service level ensures that the Government incurs no additional cost for routine maintenance, corrective repairs, or replacement of failed or end-of-life components, except where specifically excluded in the contract.
2.1.8. Impairment: An impairment is a condition where a fire protection system, or a part of it, is not functioning as intended and may not work during a fire. This can include a complete shutdown or a partial one.
2.1.9 Out-of-Service: The term "out-of-service" is often used interchangeably with impairment. It describes a state where a fire protection system is not operational and cannot provide the level of protection it was designed for.
2.1.10. Over and Above Work: Reference Department of Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.217-7028, Over and Above Work. Work discovered during the course of performing maintenance and repair efforts that is not covered by the line item(s) for the basic work under the contracts within the general scope of the contract; and is necessary in order to satisfactorily complete the contract. See paragraph 5.3. for specifics covered under Over and Above Work.
2.1.11. Physical Security: Actions that prevent the loss or damage of Government property.
2.1.12. Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service meets contract requirements.
2.1.13. Subcontractor: One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
2.1.14. Privity of Contract: This means the government’s legal agreement is solely with the Prime Contractor. The government cannot directly direct, manage, or pay the subcontractor; the Prime Contractor is entirely responsible for managing and integrating the subcontractor's work and ensuring they meet the PWS standards
2.2. Acronyms:
ACOR Alternate Contracting Officer's Representative AFCESA/CES Air Force, Air Force Civil Engineer Support Agency / Civil Engineering Support Directorate AEI Automated Installation Entry AT Anti-Terrorism ADA Americans with Disabilities Act AUL Authorized Use List CAD Computer‑Aided Design COR Contracting Officer’s Representative CS Contracting Specialist CUI Controlled Unclassified Information DES Directorate of Emergency Services DOD SAFE Department of Defense Secure File Access Exchange FACP Fire Alarm Control Panel FAR Federal Acquisition Regulation FARS Fire Alarm Reporting Systems FASS Fire Alarm and Suppression Systems FPO Fire Prevention Office FY Fiscal Year FPCON Force Protection Condition GFP Government‑Furnished Property GPP Green Procurement Plan HJB Headquarters, Joint Base HQDA Headquarters, Department of the Army ICC International Code Council HM Hazardous Material HW Hazardous Waste IAW In Accordance With ISO International Organization for Standardization ITM Inspect, Test, Maintain JBLM Joint Base Lewis‑McChord KO Contracting Officer LSSM Life Safety System Manager NAFED National Association of Fire Equipment Distributors NCIC-III National Crime Information Center Interstate Identification Index NEPA National Environmental Policy Act
NFPA National Fire Protection Association NPDES National Pollutant Discharge Elimination System OCI Organizational Conflict of Interest OEM Original Equipment Manufacturer OSHA Occupational Safety and Health Administration OPSEC Operations Security PM Project Manager POC Points of Contact PRS Performance Requirements Summary PWS Performance Work Statement QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan RCM Reliability-Centered Maintenance RCW Revised Code of Washington SDP Service Delivery Plan SO Service Order SOCAR Service Order Corrective Action Report TCLP Toxic Characteristic Leaching Procedur TE Technical Exhibit TSDB Terrorist Screening Database TWCF Transportation Working Capital Fund UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specifications UL Underwriters Laboratories WCS Wet Chemical System YTC Yakima Training Center
PART 3
GOVERNMENT-FURNISHE D PROPERTY, EQUIPMENT, AND SERVICES
3.1 Government-Furnished Items and Services: N o n e .
PART 4
CONTRACTOR-FURNISHED ITEMS AND SERVICES
4 .1 . General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Part 3 of this PWS.
4 .2 . Materials: The Contractor shall furnish all materials, supplies, and equipment necessary to meet the requirements under this PWS. The Contractor shall ensure that all parts are warranted against defects or failure for a minimum period of one (1) year. The Contractor shall replace any new or replaced part that fails within one (1) year after installation, including labor, at no additional cost to the Government.
4 .3 . Parts: The Contractor shall notify and coordinate with the COR when parts are not available within three (3) working day. The Contractor shall provide the following information: parts required, estimated time of parts arrival, and the estimated completion time of the repair.
PART 5
SPECIFIC TASKS
5.1. Governing Directives and General Requirements: All inspection, testing, and maintenance (ITM) and repair work shall be performed in strict accordance with UFC 3-601-02, Fire Protection Systems Inspection, Testing, and Maintenance, Change 1, dated 18 April 2025, and AFCESA/CES Technical report 01-10. The ITM tasks and frequencies established in UFC 3-601-02 shall take precedence over all other standards.
5.1.1 Foundational Standards: National Fire Protection Association (NFPA) standards are applicable only as referenced and modified by UFC 3-601-02.
5.1.2. Procedural Basis: The methodology for developing the ITM tasks in this PWS is based on the reliability-centered maintenance (RCM) principles outlined in AFCESA/CES Technical Report 01-10, which aims to achieve a 99% operational reliability for all fire protection features
5 .2. Service Delivery Plan: The Contractor shall submit a comprehensive Service Delivery Plan (SDP) within 30 days of contract award. The SDP shall be reviewed quarterly and updated within 5 working days of any change in governing standards, key personnel, or service methodology. The SDP is the primary operational plan for all Inspection, Testing, and Maintenance (ITM) and must be a living document. In alignment with the PWS introduction, this SDP gives special emphasis to the sustainment of obsolete and legacy systems. The Contractor shall detail its specialized strategy for this equipment throughout the plan. The SDP must detail the following components:
5.2.1. Compliance: Describe the methodology for ensuring and documenting full compliance with all governing standards, including UFC 3-601-02, AFCESA/CES Technical report 01-10, and NFPA.
5.2.2. ITM Schedule: Provide a 12-month facility scheduling plan based on TE-1. The schedule shall prioritize risk assessments for legacy systems to proactively identify sustainment issues and shall include testing of dry pipe sprinkler systems only during approved seasons.
5.2.3. Staffing & Qualifications: The Contractor shall submit a comprehensive Staffing Plan with its proposal, identifying all proposed roles, required NICET levels, professional certifications, and technical licenses.
5.2.3.1 Key Personnel Designation and Requirements: The Contractor shall designate as 'Key Personnel' the specific individuals responsible for the legacy systems identified in the system inventory.
The Contractor must…
This is the start of the file's text. The full file is on GovTribe.