PWS_IRP SR McConnell SS012 Fence Repair .pdf

PDF 593 KB Posted

Attached to
IRP McConnell SS012 Fence Repair
Solicitation number
W9128F25QA046
Issued by

About this file

This Performance Work Statement (PWS) details a Land Use Control (LUC) services contract for fence repair at the Titan II Missile Site SS012 near McConnell Air Force Base in Kansas. The project involves removing and replacing the existing degraded barbwire fencing with a 6-foot high galvanized metal chain link fence, including 8-foot metal poles set 24 inches deep in concrete and spaced 10 feet apart. The contractor will also install a stout metal gate approximately two car lanes wide (6 feet by 24 feet) with a lockable latch and a metal USAF "Keep Out" sign welded to the gate.

The contract (SATOC W9128F21D0016) is for a 12-month period with specific tasks including a virtual kickoff meeting, quarterly progress meetings, monthly reporting, site preparation, fence and gate installation, and a comprehensive fence installation report. The contractor is responsible for site cleanup, debris removal, perimeter grading, and all necessary equipment and personnel. Deliverables include meeting materials, monthly progress reports, and preliminary and final fence installation reports to be submitted to the U.S. Army Corps of Engineers and Air Force Civil Engineer Center. The site perimeter is approximately 976 yards, and there will be no access to electricity at the site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) (Includes associated Performance Requirements Summary (PRS)

Fence RepairAT

Titan II Missile Site SS012Kansas

Contract: SATOC W9128F21D0016 Task Order: To Be Determined

April 1, 2025

Part 1 General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide Land Use Control (LUC) services at the Titan II Missile Site SS012 associated with McConnell Air Force Base (AFB), Kansas.

1.2 Background: The United States Air Force Civil Engineer Center, in coordination with the McConnell Air Force Base Defense Environmental Restoration Program and the Kansas Department of Health and Environment, conducted a Five-year Review for the McConnell AFB Titan Sites, Titan II Missile Site SS012, in 2023. Following the Five-year Review process, it was determined that this project is needed to address identified security issues. The existing barbwire fencing is old, degraded, in constant need of repair, and inadequate to keeping animals and people from accessing the property. This Performance Work Statement (PWS) outlines the requirement for updating the site to ensure security compliance. The Contractor shall provide the necessary expertise and resources to fulfill the requirements and ensure security at the site meets the standards set in this PWS.

1.3 Scope: The Contractor shall provide non-personal service(s). The scope of this task order is to provide LUC Services to include a replacement of the security fence at the SS012 Titan II Missile Site located approximately 35 miles southwest of McConnell AFB, Kansas.

Tasks include a site cleanup and installation.

1.4 Objectives: The project will involve removing and replacing the existing fencing with a chain link fence with metal poles set into a concrete base. Additional installation includes a stout metal gate to control ingress/egress to the site, and an official metal USAF Keep Out sign bolted/welded to the gate.

1.4.1 Assumptions:

Assume site perimeter is 976-yards No access to electricity at site Removal and proper disposal of the existing fencing and demolition/construction debris off-site Level site perimeter boundary as needed to install replacement fencing Replacement fencing to include: 6-ft high galvanized metal chain link held upright with metal 8-ft poles set in concrete at least 24-inches deep and spaced 10 feet apart.

Base of fencing is to be even with ground surface Secure site entrance with a stout metal gate with lockable latch, on steel gate poles of sufficient strength to support the gate and set in 24-inches of concrete. Recommend a gate about two car lanes wide, at least 6 feet by 24 feet, to fit larger vehicles such as sampling rigs through the entrance.

Weld metal USAF Keep Out sign near center of entrance gate

1.5 General Information: See 1.4 Objectives for a breakdown and description of the expected tasks.

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award.

The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have ten (10) days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than ten (10) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;

(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;

(e) How the Contractor will ensure all keys issued will remain controlled items

(Paragraph 1.7 Key Control);

(f) How the Contractor will inventory and track maintenance of all Government Provided

Equipment / Materials;

(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.

1.5.1.1 The Contractor shall inform the COR of issues or potential issues that might affect the performance within twenty-four (24) hours of identifying those issues. Verbal reports shall be followed up by written reports within five (5) days.

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: The Contractor shall determine if their employees will work on U.S.

federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0730 to 1630, Monday through Friday, except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0730 to 1630, Monday through Friday. The Government facility is closed on the U.S holidays identified in paragraph 1.5.3.1 or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0730 to 1630, Monday through Friday. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

1.5.5 Place of Performance: The work to be performed under this contract will be performed at the Titan II Missile Site SS012 associated with McConnell Air Force Base (AFB), Kansas.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

1.6.1.1 Installation Pass Log: The Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) days after contract award. The log must at a minimum contain the following information – Name and Date. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five

(5) days after any changes to the log.

1.6.1.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within five (5) days.

1.6.1.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within fourteen (14) days.

1.6.1.4 Common Access Cards (CAC) and CAC Log: CAC should not be required for performance of action.

1.6.2 Background Checks: See below.

1.6.2.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to U.S background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within ten (10) days of receipt by the Contractor, identifying such with the appropriate contract number. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within ten

(10) days of receipt by the Contractor, identifying such with the appropriate contract number.

When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.

1.6.3 Physical Security: Not applicable.

1.6.4 Operations Security (OPSEC) Requirements: Not applicable.

1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan (W9128F21D0016) and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: Not needed

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance ten (10) days after contract award. Workspace sign location shall be coordinated with the COR.

Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.

1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715).

1.13 Contractor Travel: The Contractor will be required to travel to Sumner County, Kansas during the performance of this task order to complete the necessary tasks. The Contractor may be authorized travel expenses at rates no higher than the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-46, and the limitation of funds specified in this contract. All travel requires Government approval and authorization ten (10) days prior to scheduled travel. The Contractor shall include in the proposal all necessary travel costs required to complete the tasks in this PWS.

1.14 Other Direct Costs (ODCs): Inclusion of ODCs in this PWS must be preapproved by the Contracting Officer.

1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.16 Non-Disclosure Requirements: Not applicable

1.17 Protection of Government and Contract Information: Per Public Use Notice of

Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.18 Non-Disclosure Statements: Not applicable

1.19 Organizational Conflict of Interest (OCI): Not applicable

1.20 Phase In /Phase Out Period: Not applicable.

1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:

1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).

The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, the following:

(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.

(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);

(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;

(d) The Contractor shall discuss the plans in conferences convened by the Contracting

Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen

(15) days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) days prior to initiation of work on each major phase; and

(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

(i) Short sleeve shirt;

(ii) Long trousers;

(iii) Steel-toed safety boots; and

(iv) Hard hat.

1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.

1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than ten (10) days that such notifications were made.

1.22 Required Training: The following provides information on training requirements.

1.22.1 Anti-Terrorism (AT) Level I Training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

1.22.2 iWATCH Training: All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract

Government Property - means all property owned or leased by the Government.Government property includes both Government-furnishedand Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Work Day - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System

KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services

3.1 Services: The Government will provide no services for this action.

3.2 Facilities: The Government will provide no facilities for this action.

3.3 Utilities: The Government will provide no utilities for this action. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.

3.4 Equipment: The Government will provide no materials for this action.

3.5 Special Tooling and Test Equipment: The Government will provide no special tooling and test equipment for this action.

3.6 Materials: The Government will provide no materials for this action.

3.7 Common Access Cards (CAC): If and as applicable, the Government will provide Common Access Cards (CAC) via the Trusted Associate Sponsorship System (TASS) (Web site https://www.dmdc.osd.mil/tass/ ).

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.

4.2 Background Checks): The Contractor shall provide Background Checks in accordance with this PWS and as determined by the Government.

PART 5

SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services for LUC tasks for 12 months from date of contract award at Titan II Missile Site SS012.

5.2 Tasks: Tasks consist of the following:

5.2.1 Task 1 - Meetings and Project Administration (Deliverable 1) Meetings

Project Meetings

5.2.1.1 - Virtual Kick-off Meeting: The Contractor shall prepare and attend a kickoff call within fourteen days of award. The purpose of the meeting is to meet with the project delivery team and Installation POCs to discuss the project and to ensure the work is conducted within the project goals and within a timely manner. The contractor shall prepare and submit a meeting agenda within seven days prior to the initial project Kick-off Meeting. The Contractor shall present a presentation discussing the relevant aspects of the analysis (i.e., the scope of the effort, the Contractor’s team, data collection needs, overview of the schedule, etc.) and an agenda. The Contractor shall submit meeting minutes within three days following the meeting.

5.2.1.2 - Quarterly Meetings: The contractor shall organize and lead teleconferences with the installations POC and USACE as needed. The Contractor should plan to participate in quarterly calls within the 12-month period of performance. The contractor shall prepare an agenda for each meeting, record action items discussed during the meeting, prepare minutes from the teleconference, and distribute the meeting minutes to attendees no later than three business days after the meeting occurs.

Project Administration

5.2.1.3 - Invoicing and Monthly Progress Reports: The Contractor will prepare and submit a monthly progress report to the USACE and the government by the 15th of each month. Sub-contractors (if used) will provide updates of their work to the Contractor for integration into the monthly report. Each report will address the status of each task, any problems or delays encountered, how challenges to the schedule or project are being resolved, any recommendations for contract modifications, and any changes made in personnel or methodology. The progress report format will be approved by the government prior to the first submission.

5.2.2 Task 2 – Site Preparation

Field Assessment Plan

5.2.2.1 - A Field Assessment Plan Memorandum shall be developed prior to the initiation of actual field inspections. This memorandum shall contain concise descriptions of what will be assessed, data to be collected, how data is collected, how it is to be documented (including example documentation forms). A health and safety plan (HSP) shall be developed in accordance with EM 385-1-1 and included as part of the Field Assessment Plan Memorandum. USACE and AFCEC concurrence must be obtained before work can begin. All material needs to be staged within the current site perimeter.

Site Preparation

5.2.2.2 - Remove and properly dispose of the existing fencing and demolition/construction debris to an off-site landfill. Brush removal and grading the site perimeter boundary as needed to install the replacement fencing. Assume the perimeter of the site is 976 yards.

5.2.3 Task 3 – Fence and Gate Installation

Fence Installation

5.2.3.1 – Installation of 6-ft high galvanized metal chain link held upright with metal 8-ft poles set into concrete at least 24 inches deep, spaced 10 feet apart. The fencing base must be even with the ground surface.

Gate Installation

5.2.3.2 – Installation of a secure site entrance with a width of about two car lanes, featuring a stout metal gate, a lockable latch on steel gate poles, all set in 24-inches of concrete. A metal USAF Keep Out sign must be welded onto the gate near the entrance. Additional removal of all trash and debris to an off-site landfill.

5.2.4 Task 4 – Fence Installation Report

Draft Report/Final Report

5.2.4.1 – A Fence Installation Report will describe in detail all preparation, installation, and inspection work. The Fence Installation Report will also include a photographic log showing the before and after conditions and submittal of electronic working files (GIS/CADD/Excel/Word/etc). The Fence Installation Report will be submitted to USACE PM, COR, AFCEC RPM, and AFCEC PM in a draft version for Gov’t review and comment, before a final Fence Installation Report is completed.

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.

6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)

6.1.2 Department of Defense Security Agreement (DD Form 441)

6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)

6.1.4 Installation Access Control (AE Reg 190-16)

6.1.5 The Army Physical Security Program (AR 190-13)

6.1.6 Contractor Identification (AE Reg 27-715)

6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)

6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)

6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)

6.1.10 Information Assurance (AR 25-2)

6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)

6.1.12 Policies and Procedures for Property Accountability (AR 735-5)

PART 7

ATTACHMENT AND TECHNICAL EXHIBIT LISTING

7. Attachment and Technical Exhibit List

7.1 Technical Exhibit A – Performance Requirements Summary

7.2 Technical Exhibit B – Deliverables Schedule

TECHNICAL EXHIBIT A

Performance Requirements Summary (PRS)

PERFORMANCE

OBJECTIVE

STANDARD PERFORMANCE

THRESHOLD

ACCEPTABLE

QUALITY

LEVELS (AQLs)

METHOD OF

SURVEILLANCE

Task 1 - Meetings and Project Administration PWS para 5.2.1

Meetings are scheduled and held on time.

Deliverables are submitted on time and are deemed acceptable by the Government

Acceptance by Installation POC and USACE

COR/PM

Installation POC &

USACE COR/PM 100%

Inspection

Task 2 – Site Preparation PWS para 5.2.2

Per Task 2 on this

PWS.

Acceptance by Installation POC and USACE

COR/PM

Installation POC &

USACE COR/PM 100%

Inspection

Task 3 – Fence Installation PWS para 5.2.3

Per Task 3 on this

Acceptance by Installation POC and USACE

COR/PM

Installation POC &

USACE COR/PM 100%

Inspection

Task 4 – Fence Installation Report PWS para 5.2.3

Per Task 4 on this

Acceptance by Installation POC and USACE

COR/PM

Installation POC &

USACE COR/PM 100%

Inspection

TECHNICAL EXHIBIT B

DELIVERABLES SCHEDULE

TASK &

DELIVERABLE

NUMBER

TASK

DESCRIPTION

RECIPIENT NUMBER /TYPE DUE DATE

1 Meetings and Project Administration

Deliverable 1

Meeting materials, invoices, monthly progress reports

Installation

POC &

USACE

COR/PM

Refer to Section 5.2

Virtual Kickoff Meeting: 14 days from NTP Virtual Kickoff Call Agenda: 7 days prior to meeting Virtual Kickoff Call Minutes: 3 days after virtual kickoff call Monthly deliverables due each month

2 Fence Installation Report

Deliverables 2-4

Task 2.2.1:

Preliminary Draft

Fence Installation

Report Installation

POC &

USACE

COR/PM

Refer to Section 5.2

Refer to Section 5.2

Task 2.2.2: Final Draft Fence Installation

Report Task 2.2.3: Final

Fence Installation

Report