PWS_IR_ElSalvador_Batch_FINAL_Redacted.pdf

PDF 331 KB Posted

Attached to
Standard Recovery - El Salvador (Follow-on)
Solicitation number
83310126Q0043
Issued by

About this file

This is a Performance Work Statement (PWS) dated March 2026 for loan recovery services issued by the Export-Import Bank of the United States (EXIM Bank). EXIM Bank seeks a recovery firm to collect outstanding balances on defaulted loans related to credit guarantee and insurance claims, specifically involving two claim numbers (I201089 and I201090) with a debtor located in El Salvador. The contractor must provide all necessary personnel, equipment, materials, facilities, transportation, supervision, and other resources to perform collection and recovery services.

The scope of work encompasses collection services for defaulted loans, borrower negotiations, loan restructuring, workout agreements, asset recovery, and legal proceedings as required. Key requirements include demonstrating full knowledge of the El Salvador judicial system and employing a duly qualified and registered attorney if litigation is pursued. The contractor must complete three primary tasks: (1) conduct preliminary research and evaluation within 60 days, including asset search and credit analysis, followed by a 90-day attempted extrajudicial collection with written results reporting; (2) submit detailed cost and risk analysis for anticipated filing fees upon modification activation; and (3) report on payment methods for recovered defaulted principal. Compensation is structured as a contingency fee based on a percentage of monies actually collected, as specified in the Case Assignment Letter. Deliverables include semi-annual reports on litigation proceedings and outcomes, delivered both in El Salvador and Washington, D.C. Performance standards require 99% acceptable quality with semi-annual evaluations measuring litigation response capability, schedule adherence, cost control, business relations, and key personnel management.

View the file

Other files

File Type Posted
JOFOC_IR_ElSalvador_Batch_FINAL_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPORT-IMPORT BANK ON BEHALF OF

OFFICE OF THE BOARD OF DIRECTORS TO PROVIDE RECOVERY

PERFORMANCE WORK STATEMENT (PWS)

March 2026

1.0 INTRODUCTION

EXIM Bank seeks to contract for loan recovery assistance from a recovery firm principally collecting balances of certain paid claims under its credit guarantee and insurance programs.

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform loan recovery services as stated “standard recovery contract with La Cima International from debtor for a total buyer debt of which entail Claim Nos. I201089 -and I201090 - as defined in this Performance Work Statement except for those items specified as Government furnished property and services.

2.0 BACKGROUND

(a) The Export-Import Bank of the United States (“EXIM Bank”) supports the financing of U.S.

goods and services. It assumes credit and country risks the private sector is unable or unwilling to accept. In covering these risks EXIM Bank pays on claims related to insurance policies and guarantees. Upon payment of the claim it becomes the responsibility of the Asset Recovery Group

(“ARG”) within the Asset Management Division of EXIM Bank (“AMD”) to seek repayment from the debtor and/or guarantors.

(b) Throughout this document the term “recovery officer(s)” will be used. For the purposes of this document, recovery officer(s) refers to the International Recovery Officers, Working Capital

Officers, and Managing Director – Recoveries; within ARG.

3.0 SCOPE

The contractor shall provide collection services and servicing of defaulted loans which may include borrower negotiations, restructuring, and workout agreements. The Contractor shall provide the following but not limited to provide loan recovery services, institute legal proceedings, provide credit restructuring services and take such other actions required to effect recovery for

EXIM Bank.

4.0 OBJECTIVES (NATURE OF WORK)

To recover a s s e t s , institute legal proceedings and/or provide credit restructuring related to the claim(s), involving the d e b t o r and guarantor(s).

Desired Outcome: Recovery of outstanding debt,

5.0 APPLICABLE DIRECTIVES

Full knowledge of the El Salvador judicial system, duly qualified / registered attorney in El

Salvador, if litigation is pursued.

6.0 GOVERNMENT FURNISHED INFORMATION OR PROPERTY

EXIM Bank will notify contractor by email from the COR as to the specifics of case to be recovered.

7.0 SPECIFIC REQUIREMENTS/TASKS

The firm is to attempt recovery on behalf of and, if provided EXIM Bank' s express instruction to do so, institute legal proceedings and/or provide credit restructuring services to EXIM Bank's Asset Management Division ("AMD") related to the referenced claim(s), involving the referenced debtor and guarantor(s), located in El Salvador.

The firm shall take such other action as AMD may require effecting recovery for EXIM

Bank. The firm is instructed to: (i) perform a preliminary research and evaluation of the case, including, but not limited to, asset search, credit analysis and legal actions registered against the Obligor; (ii)attempt extrajudicial collection of the claim amount within 90 days of the date hereof and report the results of such attempt to AMD in acceptable format; and

(iii) under written instructions received from AMD, file legal proceedings against the

Debtor and the Guarantors if the firm is unable to effect an extrajudicial collection of all amounts due under the claim.

Task 1:

The Contractor shall provide all labor, equipment, materials, postage, supervision, expenses, and travel necessary to conduct collection investigation services for EXIM Bank on the above stated case(s). Before beginning the recovery and collection services, the

Contractor shall prepare and forward a written report to the Requesting Officer, outlining the plan for recovery and estimated amount of the defaulted principal that is collectable.

Legal services shall be in accordance with the Statement of Work.

Contractor’s written report shall be submitted in the suggested format and shall be presented within 60 days of execution of Contract.

Task 2: Filing Fee(s)

This Line Item will be activated by means of a modification only from EXIM Bank's contracting office. The Contractor will forward a written report to EXIM Bank's Requesting

Officer, which will outline the costs and risks associated with the anticipated filing fee(s).

Task 3: Payment for Recovery of Defaulted Principal

The Contractor will forward a written report to EXIM Bank's Requesting Officer, which will outline payment and/or payment methods associated with the recovery of the Defaulted

Marginal (between

91.9% and 90%

Unsatisfactory (less than 90%).

Schedule Every 6 months

All deliverables as described in the PWS and specified

100%

Inspection

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

Ongoing as per Contract

Cost

Control

Within Line 2

(legal costs) and Line 3

(actual cash recoveries)

All deliverables as described in the PWS and specified in the approved

Schedule of

Deliverables

100%

Inspection

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

As stated in

Contract – contingency fee on actual cash recoveries

Business

Relations

Professional and respectful of all parties

Regular and ad-hoc meetings between contractor and

Government

Semi-Annual

Performance

Evaluation

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

Ongoing

Management of Key

Personnel

Appropriate credentials for the work involved.

Registration within the El

Salvador judicial system to perform legal work.

Regular and ad-hoc meetings between contractor and

Government as needed

Semi-Annual

Performance

Evaluation

Exceptional

Very Good

Satisfactory

Marginal

Unsatisfactory

Ongoing

File details come from the government source that posted it. Updated .